Queens St/Princes St loop Consultation
The formal consultation has now been set to run from Tuesday 25th February to Saturday 1st March.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Shaun McDonald // 3 threads
The formal consultation has now been set to run from Tuesday 25th February to Saturday 1st March.
Created by David Earl // 1 thread
Outline application for up to 69 residential dwellings including houses and apartments, open space, landscaping and new access. | Field At Corner Of Coldhams Lane And Hatherdene Close Cambridge Cambridgeshire
New junction onto Coldhams Lane proposed, which includes a central island, the gap on the westbound side is 3.1m, about the worst possible for cyclists.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Created by Peter Lawrence // 2 threads
Please sign my change.org petition http://chn.ge/1epSzpK
Accident CC-23012014-0561 (Incident logged by the Cambridgeshire Police)
Leaving Zoology Department 18.15 walking east on Downing St, north side on 23 January, 2014. Car stopped in Downing st just west of Corn exchange road junction, obscuring the light. Lying on the road was a road sign warning cars of road works further left in Corn Exchange St, a needless warning. This 1 metre road sign had been placed on the pavement, occluding it seriously and had been, presumably, knocked over and left lying on the pavement with its black and invisible legs raised up about 10cm from the surface and its reflective surface tilted away (see picture). I tripped over the road sign in the dark and fell forwards injuring my face and forehead; the metal cut into my right leg. My glasses are destroyed, the leg of the sign tore my shoes.
I was taken to Addenbrookes and treated there. I left there ca 20.30 with head injuries and abrasions and now have an impressive black eye and surround.
I am seeking redress. I am exploring legal action against the County Council whose idiotic health and safety rules (for drivers, not for the rest of us) say that drivers should be warned in advance of even highly visible roadworks (in a 20mph area) and the company responsible for placing such a flimsy and dangerous sign right in the middle of a narrow pavement. Also am anxious that in general people who leave road traffic signs occluding the pavement or creating dangerous obstacles there, should be held responsible and penalised. I see these road signs often as I walk around Cambridge, they should be on or above the road, not blocking the pavement in my opinion.
The next day the same road sign, with my blood still on it, was back in the middle of pavement waiting to be knocked over again and even now forcing pedestrians to avoid it by diverting on to the roadway. I attach a photo of it taken on Friday the day following my accident with a diverted pedestrian on the right.
It was again fallen on the ground waiting to kill someone on Saturday night, presumably following the afternoon storms.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Jean Dollimore // 1 thread
The image above is an extract from the map published by TfL on 18th Dec 2013; showing the GRID routes in Camden with some of the names of the roads added. We should reply to the documents at:
http://www.tfl.gov.uk/roadusers/cycling/29172.aspx
Deadline 14th February 2014
Created by TMiles // 0 threads
The route marked between Headingley and Armley is heavily used as an intra-urban connector between north west and south west Leeds. Congestion can be particularly acute because it uses one of the few crossing points over the River Aire and the Leeds and Liverpool canal in the west of the city.
The addition of cycle lanes in both directions along the length of this route has the potential to encourage a modal shift from cars and make a real impact on congestion. These cycle lanes would help to establish a more comprehensive network outside the radial routes, and would be a useful on-road addition to the Leeds Core Cycle Network (forming itinerary Ar - W). The proposed route offers connections to the improved cycle facilities on Kirkstall Road (A65) and the future CityConnect facilities.
The addition of cycle lanes would be of particular benefit to uphill cyclists, minimizing their conflict with motorists.
In addition to the environmental, economic and health benefits, the project would improve car-free mobility between three very different communities in Leeds: Headingley, Hyde Park and Armley.
The width of the pavements along the northern sector would allow for a widened carriageway in order to accommodate the cycle lanes. The loss of pavement width would be outweighed by the benefits of calmed traffic. The carriageway of the southern sector is already generous and would make the implantation of cycle lanes relatively straight forward.
Created by Shaun McDonald // 2 threads
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Norwich Road, Vallet Road, and Chevallier Street. This is a major route for people travelling north in and out of the city.
Created by Shaun McDonald // 1 thread
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Felixstowe Road, Nacton Road and Bishops Hill. It's a cross roads with one significant use arm at a 30 degree angle
Created by Shaun McDonald // 1 thread
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Woodbridge Road and Argyle Street. It is a t-junction of which 2 arms are one way and part of the gyratory.
Created by Richard Moss // 1 thread
An umbrella issue for discussion of general matters relating to reviewing planning applications in the city and south cambs.
Created by Hester Wells // 5 threads
The County Council is planning to redesign Tenison Road.
East Parade forms part of the one-way Leeds city centre loop. On the stretch shown it is three-lanes wide, a layout that encourages cases of excessive speed.
The addition of a wide hybrid or segregated cycle lane would improve cycle journeys from the railway station and the south of the city towards the Universities, hospital and north of the city.
Towards the junction with the Headrow the segregated system will end to allow cycles and vehicles to correctly position themselves to turn left or go straight ahead. In this final section the road surface should read, from left to right: (1) cycle lane, turning left (2) standard vehicle lane, turning left (3) cycle lane, straight ahead (4) standard vehicle lane, straight ahead (5 - if space permits) standard vehicle lane, straight ahead. Nevertheless, the layout should allow cycles continuing straight across to adopt their position without conflict from left-turning vehicles. An example of such markings can be seen in Cambridge (Hills Road railway bridge, inbound) or in Nantes (http://www.flickr.com/photos/cyclable/9526360512/).
Provision for delivery vehicles should also be considered here, as the left hand lane is frequently occupied by vans or lorries under the current system. To avoid conflict with cyclists, it would be most sensible to site such parking to the right of a segregated cycle lane.
The project would bring additional traffic-calming benefits, with the reduction of the road width to two lanes along much of its length.
Created by TMiles // 0 threads
The width of the road after the traffic lights lures south-west bound cycles into a left position that becomes problematic because of the build-out at the later pedestrian crossing. They either have to stop to let traffic pass through this pinch point or take the risk of readjusting their path to the right in order to join the main stream of vehicles.
One solution would be to guide cycles into the correct position with cycle lane markings from the traffic lights to the pedestrian crossing.
The second solution would be to cut a cycle-lane across the build-out, including a mini pedestrian crossing that cyclists would have to respect. This short stretch of lane should be flush with the road surface and must be kept swept regularly in order to be effective.
Created by Shaun McDonald // 1 thread
The cycle lane on NCN1 on Stoke Park Drive are rather narrow, thus you cannot cycle within the cycle lane. Having the cycle lane there means drivers often don't give as much space when overtaking. There are also many traffic island pinch point which make it extremely dangerous, as drivers overtake and cut in just before the island.
Created by MJR // 1 thread
"The adopted Core Strategy designated South East King’s Lynn (this area) as one of the strategic ‘urban expansion’ areas around King’s Lynn. The independent planning inspector who examined the Core Strategy explicitly stated that, compared to the potential alternatives, the expansion areas identified (including South East King’s Lynn) were preferable to the alternatives in meeting the Borough’s need for substantial numbers of additional dwellings over the plan period. It is relatively unconstrained by flood risk and infrastructure problems, etc., and relatively easily accessed and serviced.
5.2.4 Policy CS09 of the Core Strategy, ‘Housing Distribution’, provides for an allocation here of at least 1600 new homes, with supporting infrastructure. It also identifies this as establishing a direction for future growth beyond the plan period (i.e. beyond 2026). From the sites put forward during the consultation, informed by the work of the Prince’s Foundation for the Built Environment in connection with the Neighbourhood Plan (see below) a total of 3,000 to 3,500 additional dwellings could be accommodated in the fullness of time. This is indicated diagrammatically in figure 7 of the Core Strategy.
5.2.5 This is likely to be the largest residential development opportunity in the Borough for many years. It provides a once-in-a-generation opportunity to form a thriving and vibrant new community immediately south of King’s Lynn. The intention is to integrate a large number of new homes and associated facilities with an existing village community, generate a range of major improvements in a range of areas, and shape a place that promotes a sense of community among its residents, existing and new." (From the Borough Council KLWN, "Preferred Options for a Detailed Policies and Sites Plan", October 2013)
Created by Kevin Ablitt // 0 threads
The west bound ( out of town ) on-road cycle lane is extremely narrow. As are the motor vehicle lanes to accomodate eastbound bus lane. There is plenty of space on verges etc to improve this facility but may mean moving lampposts etc.
Created by Kevin Ablitt // 1 thread
Very narrow carriageway and very narrow footpath on one side only ( I have seen a woman struck on the shoulder by a bus mirror on this route).
High number of pedestrians and cyclists at peak times, poor visibility and abrupt hill make this a very dangerous route.
Created by Kevin Ablitt // 0 threads
Very narrow and winding. This section of Stone Lodge Lane should be considered for reduced access, one way, filetered permeability or complete closure to motor vehicles.
http://www.ipswichstar.co.uk/news/ipswich_child_injured_after_collision_on_stone_lodge_lane_1_3211524
This isnt the first such incident.
Created by Matthew Phillips // 2 threads
The Mount Oswald development received outline planning permission a while ago. A full application has already gone in for the first phase, at the southern end of the site. It appears connections will be provided for cyclists and pedestrians to the A167 (car access is from South Road). The greater concern is whether an opportunity is being missed to create a new off-road route parallel to South Road.
The picture is taken from the Design and Access Statement of the planning application for the first phase. The big unknown is the middle area, where the large self-build houses will be. No plot divisions are shown on the plan. Will there be public access north-south through this area?
South Road is not shown as a strategic cycle route in the County Durham Plan. The Mill Hill Lane route and the A167 are accorded the status of primary routes, but there is not even a secondary route along the South Road axis, despite it being the obvious route to the University from the south and from all the new housing on Mount Oswald.
Created by Matthew Phillips // 1 thread
The cycle path across the top of the golf course has no barriers at either end but does not seem to suffer from abuse by motorcyclists. However at two or three locations along the path there are staggered half-barriers on paths which lead to the housing estate to the north.
Barriers like this cause problems for longer cycles, such as tandems and recumbent cycles, as well as for families with child trailers or tag-alongs. Such barriers should preferably be removed and we need to seek to ensure that new developments do not introduce further barriers.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Martin Lucas-Smith // 2 threads
This junction has a new cycle lane over a widened pavement. This looks like very substandard infrastructure, encouraging pavement cycling, that should never have been approved by the County Council.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?