Ponding
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Iain Lane // 1 thread
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
Created by Iain Lane // 1 thread
The city council received a £6.1m grant from the D2N2 LEP to construct 4 radial routes. This is the first, a mixture of a physically segregated and a shared route.
I use this route twice every day and the cycle lane is always blocked by cars parked to use the shops or hotels on this street.
It makes the cycle lane pointless as I can't use it.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Richard G // 1 thread
There seems to be a number of cars parking half in the cycle lane on the new Addenbrooke's road (Dame Mary Archer Way)
Is parking in a cycle lane an offence of some sort, and would it make a difference on what I think is a private road? (I think that those roads around Addenbrooke's are not normal in terms of ownership)
Vegetation breaking through the surface of a, basically brand new, shared use path surface at Smeaton Bing.
Created by Jenny Barnes // 2 threads
If the level crossings either side of farncombe station were cycle/ ped only, with bollards in nightingale rd at the farncombe street end, and on frith hill, farncombe would be divided into 3 areas for cars, each of which would need to come out onto distributor roads. Further, if the New pond rd end of summers Rd as far as Brioadwater school were made one way southwest bound, any traffic trying to bypass the a3100/ Meadrow would be unable to.
Access Walden is a campaign group based in Saffron Walden.
Their objective is to create a safe walking and cycling link between their town centre and Audley End railway station, a journey of two miles.
Created by Bracken VanRyssen // 1 thread
The Brook Lane road badly needs cycle infrastructure and there is definitely the space available and small changes here have the potential to have a big impact on the route. Easy changes would be to resurface and open up the ends of the Brook Lane service road to allow continuous movement along it, as well as putting in a crossing for the Yardley Wood road. On the easterly section a protected bicycle lane for cyclists ascending and descending the hill could be created by moving the parking in the left lane further away from the pavement and using the resulting space (especially important for cyclists travelling up the steep hill).
Created by Roxanne (CEO) // 1 thread
The path running in front of Petersfield Mansions (identified below in red) is only 1.2m wide. This means that when passing each other pedestrians and cyclists often have to use the grass which is problematic when it is wet and muddy. It is also difficult for residents of Petersfield Mansions when exiting their properties as there is very little space for people to manoeuvre around each other.
Usage of this path has increased over the years with more cyclists using the path to access the cycle racks which have been installed on Bradmore Street as part of the expansion of Anglia Ruskin University. It is therefore proposed to widen the path by 1metre to cater for this increased usage and to improve access from Mill Road with the removal of a short section of railing and the installation of a flush kerb.
Petersfield is owned by the City Council and the path in question is maintained by the County Council as highway.
The cost of these works is approximately £20,000 and this project will be joint funded by Cambridge City Council and Anglia Ruskin University.
The path marked in blue is maintained by the City Council and we hope to improve the surface of this path at the same time if funding can be identified.
If you have any comments regarding the widening of this path or would like more information please contact cyclingconsultations @ cambridge.gov.uk by 14th September 2015.
Anon // 1 thread
KCC consultation on reduction in speed limit to 40mph
http://consultations.kent.gov.uk/consult.ti/40mphspeedlimitheadcorn/consultationHome
Consultation closes 28 Sept 2015.
Created by Dexter Johnstone // 1 thread
Weston Street is an advisory cycle route and should link up with the University of Sheffield concourse. However, it does not and you currently have to cross 3 lanes of traffic. The road is often very busy. There should be a toucan crossing instead of the pedestrian crossing, a short off road cycle path across the large grass verge could link the crossing to Weston Street.
Created by Chris Paton // 0 threads
City of Edinburgh council have done good work trialling a segregated path for NCN1 on George Street. Although the trial is coming to an end it's clear from their documents and consultations that George Street will remain the primary east-west route for cyclists travelling through the city centre and more investment is planned.
The problem is that there is very poor access to this route from the West End for any cyclists who have come along Shandwick Place or Rutland Square (including cyclists from the big offices nearby). Heading east, cyclists have to go through the busy West End road junction and then brave cars sweeping into South Charlotte Street as they turn left while simultaneously needing to find a way across two lanes of traffic to the middle of the road to turn right onto George Street -- scary stuff even for a competent cyclist.
Space is always at a premium but there do seem to be options for improving this with minimal loss of road space. A two-way cycle path could be constructed across the paving to link Hope Street with Rutland Place. With careful design this could be done to minimise impact to the pedestrian space and with reconfigured light timings cyclists could emerge from Hope Street to turn left or right, and likewise cyclists from Shandwick Place and Princes Street could turn into the new path. In addition, a left turn strip at Lothian Road onto Rutland Place would provide access to this new path for cyclists from Rutland Square and Lothian Road.
Created by Bracken VanRyssen // 1 thread
The only cycle access to the train platforms at Solihull station is an extremely small lift, otherwise your only option is carrying your bicycle up and down the stairs which can be quiet challenging. A simple solution would be a wheeling rail at the edge of the stairway to guide wheels down slowly. I see quite a few people with bicycles using the train and I myself do so on a weekly basis and two flights of stairs with a laden bicycle certainly make things tricky.
Created by WildNorthlands // 1 thread
Generally I'd say Brunswick St works well as a bike route but the gate between these two roads and the junction is poorly placed - in order to get through it you need to be on the wrong side of the road on a blind bend and it is common to find yourself coming head to head with a car coming the other way. if there were too gates for each direction, and the northbound was lined up with the cycle lane, it might help.
Created by Dominic Fee // 1 thread
Westminster City Council is undertaking a statutory consultation on the Traffic Management Orders (TMOs) needed to implement the East West Cycle Superhighway at Parliament Square. You can find a description and drawings of the proposals here:
http://westminstertransportationservices.co.uk/tmo/tmo_details.php?tt=2&id=909&cid=1
In Westminster Cycling Campaign we rarely respond to statutory TMO consultations because the proposals are either insignificant or, if they are significant, they've usually been subject to an earlier public consultation. It would be inappropriate for us to repeat points we've made previously, and we wouldn't be listened to.
Nevertheless I would encourage interested people to take a look at the Parliament Square drawings to check that the earlier design has been taken forward properly into a detailed design for construction. We have had a recent example where we did respond to a statutory TMO consultation in which the connection between part of the EWCS proposals (Savoy Street) and the rest of the highway network (a left-in left-out junction on the Strand) hadn't really been thought through. If we need to submit a response regarding Parliament Square, the deadline is 21 September 2015.
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Single storey front, side and rear extensions.
58 Willingale Road Loughton Essex IG10 2DB
Epping Forest
Application reference : EPF/1025/15
Created by Heather Coleman // 4 threads
I can't find anywhere sensible to put such things so this is a general issue for people to start specific threads pertaining to temporary closures.
Created by Donald Noble // 1 thread
A barrier has been erected when the NCN7 cycle path joins the A86, presumably to stop children from cycling onto this busy road. However, this blocks the dropped kerb at this location, and no alternative is available without cycling some distance into Kingussie on a footpath which is not marked as shared use.
The barrier also limits the entrance to the cycle track, which could make it difficult for people with trailers or alternative bikes
Phil Wigglesworth // 1 thread
They're building lots of flats off Rustat Road, which is on a major cycle route and also is the main area for freloading railway station users.
There are some issues with control of the building work, specifically:
- trucks blocking Fanshawe and Rustat Road at peak times causing dangers to cyclists
- mud on the road making the Fanshawe/ Rustat road junction dangerous
Created by Roxanne (CEO) // 1 thread
Outline application for the demolition of existing industrial and office units and 5 dwellings and the erection of up to 90 dwellings, together with associated garaging, parking, public open space, landscaping, access, highways drainage and infrastructure works. All matters reserved except access.
Created by Roxanne (CEO) // 1 thread
Demolition of Daedalus House and construction of a new 7 storey office building comprising of 9026 sqm (GEA) of office floorspace (class B1); cycle parking spaces; associated plant; hard and soft landscaping; a basement with 51 car parking spaces and 7 motorcycle bays; infrastructure works. | Daedalus House Station Road Cambridge Cambridgeshire CB1 2RE
Created by Jean Dollimore // 1 thread
Official title: "CENTRAL LONDON CYCLE GRID - PRATT ST AND DELANCEY ST PROPOSED WALKING AND CYCLING IMPROVEMENTS"
This consultation proposes the construction of an important two-way east-west cycle route across Camden Town.
It will run from St Pancras Way along Pratt Street, across Royal College Street to Camden High Street, where a two-way cycle crossing will be provided.
It will then run two-way along Delancey Street as far as Mornington Terrace.
A later consultation on the continuation of this route to Regents Park is promised.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.