Potters Bar to South Mimms research institutes
A possible route from Potters Bar via Dame Alice Owen School, NCN12 at South Mimms, Cancer Research at South Mimms and then on via Blanche Lane to join the existing cycle path alongside the A1.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Adam Edwards // 1 thread
A possible route from Potters Bar via Dame Alice Owen School, NCN12 at South Mimms, Cancer Research at South Mimms and then on via Blanche Lane to join the existing cycle path alongside the A1.
Created by Adam Edwards // 1 thread
Porposed but never built links between the Royal Veterinary College and Potters Bar and Brookmans Park stations. The route parallel to the railway exists as a footpath which would need upgrading to a bridleway with good surface and ideally lit to allow all year use. (Vets work well beyond 9-5)
The Alban Way is unlit and isolated from main roads. Thus it does not provide a safe commuter route in the winter months.
WelHatCycling believes there should be an all year route alongside the A1057 along the route shown, linking Hatfield to the St Albans Green Ring at Fleetville and then continuing in to the city centre.
This will be a challanging route where streets are narrow and car use is high. The priority therefore might be University of Hertfordshire - Oaklands College - Fleetville to encourage cycling to these two key educational institutions.
Created by Adam Edwards // 1 thread
WelwHatCycling believes there should be shared use pavements along Digswell Road to link the north of the town to the town centre. This would connect to our proposed North - South and East- West routes described in other entries.
Created by Adam Edwards // 1 thread
The cycle route from WGC to Hertford is an unlit isolated former railway. Whilst an excellet ride on a sunny Sunday, it is of little use in the dark winter months for cycle commuting.
The route shown would comprise:
A new shared use pavement along Cole Green Lane / Birchall Lane from the end of the current cycle path to the A414.
A light controlled crossing of the A414 or bridge.
Signed us of the Old Coach Road to the outskirts of Hertford.
Shared use pavement plus signed routes into the centre of the town.
Created by Adam Edwards // 1 thread
The east side of WGC is currently served only by the NCN61 route. In 2014 work was done on Heronswood road to add safety markings due to high incidences of accidents involving bikes. There are local concerns about cyclists using pavements to avoid busy local roads.
There should as a minimum be a route from WGC station to the new QE2 hospital, ideally directly via Woodhall shops. The other routes show other useful possible links to create a cohesive network to serve this section of town.
Created by Adam Edwards // 1 thread
A long standing missing link in WHBC area cycle routes. The current Bessemer Way cycle path ends where the road becomes a busy dual carriage way. There is no off road cycling link to Welwyn village which prevents the children of the town cycling to Monks Walk School (yet it is possible for Hatfield children to get there virtually the whole way on cycle path!)
Created by Adam Edwards // 1 thread
This route would use a combination of 20 mph road (Fretherne Road, Stonehills) plus upgraded crossings to create a north south route through the centre of Welwyn Garden City. It would share a common section around the Welwyn Hatfield Borough Council Offices and the Campus with the east west route described in another section.
The route would link NCN57 south of the town with the existing link from Campus East to Shirepark, thus enabling commuters from this business park to access the station. Going further north the link over the White Bridge would then open up the quiet residential streets of north WGC for cycling to and from the town centre. Via the east west route their would be a better connection to NCN12 avoiding the busy Parkway.
Created by Adam Edwards // 1 thread
Welwyn Garden City has no off road town centre cycle routes. This east west route would link the network of cycle paths to the east of the town centre to NCN12 to the west and enable cyclists to avoid The Campus, a deceptively green gyratory which is difficult for cyclists to navigate.
It would connect with a north south route at the Welwyn Hatfield Borough Council offices, encouraging staff to cycle to work. It would encourage commuters to cycle from west WGC to the station and to work places off Broadwater Road and at the Mundells.
Created by Adam Edwards // 1 thread
The Sustrans map erroneously shows part of this route as an on road cycle path. No such path exists.
The Common is one way south west bound. In order to spare cyclist having to use the on road cycle lane on Queensway which is badly engineered, especially at the Woods Ave roundabout, WelHatCycling believe there should be a contraflow cycle lane or shared use pavement along this route, extending accross Lemsford Road and connecting with the existing cycle path on St Albans Road West. This would create a route through the town centre to connect north and south Hatfield.
The photo shows the north end of the Common as currently arranged for cycling.
Created by Adam Edwards // 1 thread
Just two (2!) metres of tarmac would legally connect Dellfield Road to the Woods Ave cycle path. With no other work than this it would allow cyclists heading west to avoid the nasty on road cycle path along Queensway parallel to this route.
Ideally works would also be done to allow cyclists heading east to use this route and then continue along the planned Queensway cycle path (see other entry) to avoid Queensway entirely.
Created by Adam Edwards // 1 thread
Hertfordshire County Council announced plans in 2014 to improve the walking route from Hatfield town centre to the railway station. We lobbied successfully for the section from the Market Place toucan to the French Horn Lane pelican crossing to be reubuilt as dual use, completing a vital link from the station to the University.
This would be even better if officially extended round the skateboard park and accross Link Drive to join up with the Woods Ave off road cycle path, thus enabling cyclists to avoid the dangerous roundabout at the junction of Woods Ave and Queensway. This is shown in the map to the west (left) end of the route shown.
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by Roxanne (CEO) // 3 threads
Thread for County Council Economy and Environment Committee meetings
http://www2.cambridgeshire.gov.uk/CommitteeMinutes/Committees/Committee.aspx?committeeID=74
Created by Chris Peck // 1 thread
Woodside Park is a commercial area which the developers wish to turn into an 87 dwelling residential area, comprised of 61 flats and 26 houses, with up to 235 residents. An additional office space area could also be turned into a further 20 2-bed flats, resulting in a total of 107 dwellings.
The developers' transport assessment suggest this:
"Whilst there are no formal facilities for cyclists, the local roads are suitable for use
by cyclists, and Catteshall Lane is identified as a recommended cycle route by SCC
and Sustrans. This cycle route links with Godalming town centre and Godalming
railway station, which is approximately five minutes from the site by bicycle."
This is patently not true, as the route to Godalming station via the town centre is one-way!
Car parking
135 car parking spaces are planned, however, the assessment suggests that, comparing equivalent car ownership in the local area, only 86 spaces are actually required (because there are only 0.8 cars per flat in central Godalming, and 1.42 cars per house).
While it is accepted that a few extra spaces are required for visitors, is 56% extra parking really needed?
Cycle parking
No numbers are provided, but houses are expected to accommodate cycles in sheds or garages, while there will be covered cycle storage for the flats.
More detail is required on how secure this storage will be.
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
Created by Chris Peck // 1 thread
With the welcome completion of the cycle path linking Marshall Road to Bridge Road, the weaknesses of links on either side of the route become more apparent.
Bridge Road is a busy, narrow main road. Traffic mostly has to wait behind cyclists, creating uncomfortable conditions for all but the brave. Both roundabouts (at the Chalk Road/Meadrow and the Bridge Street/Wharf Street junctions) are difficult for cyclists (and pedestrians).
An alternative route, either running parallel to the road (a widened shared use footway?) or a raised boardwalk across the Lammas Lands, are alternatives, but both are expensive, challenging options, which require new or wider bridges over Hell Ditch and the River Wey.
Created by Bracken VanRyssen // 1 thread
The path between Smith's Wood and Water Orton could be a key cycling and walking link and a way to avoid the only other crossing of the A452 and M6, which is the busy and fast Water Orton Road. However the route is blocked off with concrete blocks and is in an extremely poor state of repair with overgrown bushes and an exceedingly unpleasant subway.
Martin Lucas-Smith // 3 threads
The City Council has been working on a City Centre Access Strategy to deal with the problem of obstructions, including inconsiderately-parked bikes. This is to be considered formally by a City Council Committee.
Created by Jon_B // 0 threads
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
Created by Iain Lane // 2 threads
Dear Consultee,
Nottingham City Council (Radford Road Area, Nottingham) (Prohibitions of Waiting and Parking Places (Specified Classes of Vehicles)) Traffic Regulation Order 2015 (TMP 7115)
Please find attached a consultation letter and associated drawings, SN/TMP7115/01/A, SN/TMP7115/01/B and SN/TMP7115/01/C which relates to the above Radford Road Area, Nottingham – Traffic Regulation Order (TMP 7115).
Created by Dawes Jaguar // 0 threads
The pointless pedestrian gate here is really awkward for pedestrians and cyclists alike, as it's hung on the wrong post and the area of bitmac that has been laid for it is ludicrously small. This area normally ends up a muddy mess in the winter. People simply don't move in sub one metre angular movements, shunting back and forth to avoid the grass. Note the track in the grass that shows what one cyclist did shortly before the Google car got there.
Remove all three gates and replace them with a removable bollard.
Created by Dawes Jaguar // 0 threads
There are regular collisions at this junction because motorists speed on Bournville Lane and the site-lines are very, very poor. The simple solution is to change the priority. This would solve the problem for motorists, and make it easier for cyclists to use Hay Green Lane as part of a cycle route.
I have suggested the change of priority to BCC but was given a list of excuses why this cannot possibly be done. One of these was that Bournville Lane is a blue route. I see no benefit in an emergency journey ending here because someone pulling out of Hay Green Lane couldn't see the approaching police car.
Created by Dawes Jaguar // 0 threads
Cotteridge town centre has been allowed to degenerate into a hostile place for cyclists and pedestrians. Motorists have multiple lanes for driving and parking, whilst pedestrians are blocked from crossing the road by steel railings. Cyclists are given nothing. Watford Road and Rowheath Road are both OK for cycling, but their junction with Watford Road is horrendous. Midland Road has no contra-flow, so it is obstructive to cyclists trying to avoid the multi-lane horror of the Pershore Road. The two lane double-roundabout is difficult to negotiate even in a car.
This whole area needs to be redesigned, putting cyclists and pedestrians first. I'm sure I'm not the only person who doesn't shop in Cotteridge because the environment is /vile/.
Created by Dawes Jaguar // 0 threads
Birdcage Walk is fitted with Cycling Prohibited signs and barriers, yet it is as wide as some roads. Talking to a PCSO on a bike I saw cycling there, he told me Cadbury's were happy for people to cycle on Birdcage Walk if they did so responsibly. So how about replacing the signs with "Share with Care" signs, and the barriers with bollards spaced wide enough to allow cyclists through but not motor vehicles?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.