Traffic calming proposal
There's a proposal to use speed cushions to slow traffic down on Shelly Row and Albion Row.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
sound+fury // 1 thread
There's a proposal to use speed cushions to slow traffic down on Shelly Row and Albion Row.
Created by Marcus Howarth // 1 thread
Consultation:
London Borough of Sutton is considering installing a motorcycle barrier on the Spencer Road Entrance at Watercress Park to help prevent unlawful use by motorbikes and we are interested in hearing your views. The barriers are designed to allow pedestrians and those using mobility scooters and wheelchairs to enter but to stop motorcycles from gaining access.
We are aware that motorbikes regularly access the site via the Spencer Road entrance which can cause anti-social behaviour and safety issues. As part of the Council's commitment to improving the situation for local residents we propose to install an inhibitor gate.
Created by Marcus Howarth // 2 threads
(Last item on sheet)
Convert zebra crossing to a parallel crossing (one that allows cyclists to use it) near Mellows Park which would provide a continuous safe facility for cyclists. This would provide links to an existing contra flow cycle lane in Redford Avenue and a large residential area in Mellows Park, and a borough cycle route into Wallington district centre
Stafford Road Parallel crossing
These currently being negotiated by LBS with TfL - hopefully funding confirmed mid March 2023.
Created by Marcus Howarth // 2 threads
Created by Roxanne (CEO) // 1 thread
The new owners of Capital Park, Fulbourn, CB21 would like to meet and discuss any cycling issues relevant to the site.
Created by Martin Wheatley // 1 thread
On-road section of Greenway which is unpleasant and dangerous, and certainly not suitable for riders of all ages and levels of confidence, as it should be.
Created by linus // 1 thread
This is a joint Camden and Westminster consultation of the design of a short route of part of the longer Fitzrovia to Pimlico cycle route. https://westminstercycleways.co.uk/cleveland-street-cycleway.html
Westminster Council is leading on this project. Consultation closes 3 March. There will also be a drop-in community event about the plans from 3pm to 7.30pm on Tuesday 7 February 2023 at Fitzrovia Community Centre, 2 Foley Street, London W1W 6DL.
Created by Marcus Howarth // 1 thread
The current layout and building stock at Greenshaw are inefficient and energy intensive.
sound+fury // 1 thread
22/05108/SCRE | EIA screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed development to provide up to 12,442 sqm of employment floorspace in a building up to 34 metres in height with associated car parking, cycle parking and landscaping. | Vitrum Building St Johns Innovation Park Cowley Road Cambridge Cambridgeshire CB4 0WS
Created by Marcus Howarth // 1 thread
The Council is proposing to introduce a traffic management scheme in Plough Lane junction with Collyer Avenue and Queenswood Avenue. We are proposing these measures in response to concerns raised by local residents in the area, ward councillors about traffic speed, noise, pollution, cut through traffic and road safety at the above mentioned junctions.
What is proposed?
The following measures are proposed:
What is the aim of the measures?
These measures aim to
From the 2023/24 and indicative 2024/25 programmes: (A) / Environment and Sustainable Transport Committee
Appendix 7 b) - this is getting (£ ,000's )
Perceived safety issues raised that vehicles are not stopping at the
existing zebra because vehicles are rat running to avoid Croydon
Road/A232 (red route). The zebra is located on a link between the two
roads being used for rat running so drivers are looking for the next road
entrance rather than at the zebra. The proposal is considering measures
to address through traffic issues - initial locations being investigated are
the junctions of Queenswood Avenue/Plough Lane and Collyer
Ave/Plough Lane (subject to consultation).
The proposal also includes consideration of a parallel low traffic cycle
route along Queenswood & Collyers Road as an alternative to the A232
Croydon Road which currently has no cycle facilities along the parallel
stretch. Cyclists using this quiet alternative link will be able to re-join the
A232 Croydon Road via Aldwick Rd which connects to the existing
Croydon Rd cycle facility. This element of the scheme could be moved to
the Cycle Network Development/Borough Cycling Fund.
Created by Robert Watson // 1 thread
Grange Road has extremely narrow cycle lanes for most of its length, which include traffic calming bollards forcing traffic down to a single lane. While this design does slow traffic, the narrow space for the cycle lane means that trikes have to slow almost to a stop to pass safely -- or in some cases may not fit at all. This forces trikes out into the single centre lane, where cars may not properly give way, and also are the sites of speed bumps and significant potholes. If the lanes were about 20-30cm wider, then trikes could pass without a problem. This issue affects all of the bollards on both sides of Grange Road for its full length, but I’ve highlighted a particularly problematic one since I had to pick a spot.
(In general, the cycle lanes on Grange Road are too narrow for cargo trikes forcing them out into traffic lanes anyway, but it’s the brick bases to the bollards that cause a particular problem.)
Created by Robert Watson // 1 thread
On the northeast side of the Trumpington Road and Brooklands Ave junction, there’s a combined cycle and foot path around the corner that suffers two problems that make trike use problematic in peak times:
Created by Robert Watson // 1 thread
Bollards close Storeys Way to through traffic while allowing cycles through. However, the bollard spacing makes it difficult to get cargo trikes through -- e.g., Nohila and Winther products.
Where the new wands on East road begin if heading from the Newmarket road underpass into East road is a layby outside Mackays. The placement of the wands initially mean there is insufficient room to cycle on the road, but the layby is potholed, making it difficult to ride through. After the layby the spacing is wider and they are much better.
Created by PHG // 1 thread
The new wands on East road force cyclists on to the pavement, rather than the roundabout, where East road meets Newmarket roundabout. Why should cyclists be blocked from using Newmarket roundabout, which is the easiest way to access the bus lane on Elizabeth Way bridge.
Pulling out of the wands early is dangerous and annoying. more annoying is when you forget and have to stop, or go onto the pavement and round to use the ramp.
Created by Anna Williams – Head of Campaigns & Engagement // 8 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by KW // 1 thread
Demolish and replace with terrace of three: conflicting bike store drawings, so which version already has permission?
sound+fury // 1 thread
Is this a cause for celebration?
Created by cpax // 3 threads
Like many other cyclists the majority being school pupils I have used the road between Perne Road and Tiverton Way as a way to avoid the traffic on Birdwood Road , however recently the work has begun to convert the bungalow and often with builders vehicles blocking the cycle path on Perne Road . Today I encountered a group of people gathered ( deep in discussion ) in the road adjacent to the empty site which lies closer to Tiverton Way and on hearing my cycle bell seemed reluctant to move . I am concerned that this could be a site for future conflict .
sound+fury // 1 thread
Reserved matters for another phase of Eddington, including landscaping, cycle and pedestrians routes, and cycle parking.
sound+fury // 1 thread
New cycle parking proposed for staff and on street.
Created by Sarah Hughes // 1 thread
We need to finalise the route for the Winter Lights ride on 10th Dec
Created by Jason Broadrick // 1 thread
Created by Rosamund Humphrey (Admin Officer) // 2 threads
The full Council, comprising all 61 County Councillors, is responsible for setting the Council's budget, the Council Tax and agreeing the Council's main policies.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Audit and Governance Committee's role is to review the Combined Authority's financial affairs, internal control, corporate governance arrangements and risk management. The Audit and Governance Committee was established by the Combined Authority in March 2017 in accordance with the Combined Authorities Order 2017. The committee is made up of one member from each of the constituent councils of the Cambridgeshire and Peterborough Combined Authority.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Starting a thread about this application here so we can continue on from the previous planning list discussion.