Poor surface on path
Path reported to be poorly surfaced and in need of resurfacing.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Chris Lowe // 0 threads
Path reported to be poorly surfaced and in need of resurfacing.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Eric Booth // 1 thread
Another pinch point issue being installed on Whiteladfies Rd as part of the St. John’s Primary School Expansion which links the school in Worrall Road to the new site at the old police station at Lower Redland Road. Looks bad at the moment as there's just the buildout but signals will follow.
BCC Engineer states:
"In terms of specific cycle facilities we are making a number of improvement to the area:
Adding a 1.5 metre uphill cycle lane on Whiteladies Road near the Grove Road area (existing signalised crossing is to be removed).
Adding a 1.5m uphill red surfaced cycle lane (without markings) through the crossing on Whiteladies Road near Lower Redland Road.
Adding a continuous contra-flow cycle lane through the 2 one-way sections of Lower Redland Road (which was requested by cyclists in the area).
Created by Hester Wells // 0 threads
Temporary traffic lights for building works between High Cross and Charles Babbage Road.
I have received the following from our building facilities manager as these lights affect access to our building, and two others.
"1. With effect from Monday 22 July there will be 3-way traffic lights positioned between the existing Charles Babbage Road and new CBR. This will last for 1 week. The lights will be installed on Friday ready for operation on Monday. These lights will have an operator to monitor traffic flow during peak periods (8.30am – 9.30am and 4.30pm to 5.30pm). Outside of these times the lights will operate on sensor detection for queued vehicles to avoid unnecessary queuing, and will automatically sequence between the roads when no traffic is present. Unfortunately the lights will not detect and activate for cyclists and cyclists will need to wait for the lights to operate on the normal sequenced rotation.
2. Following the initial works and as work progresses along CBR, the traffic management will become 2 way light operation along the High Cross Access Road the CBR and this is expected to commence from Monday 29 July for a further 2 weeks.
3. During the above the New CBR and Access Road to Schlumberger are being prepared and tarmacked – kerbs are being installed etc. Surfacing is to be complete by 12 August ready to opened for use by all to access via the New CBR after 12th August.
4. Also after 12 August works will commence on finalising the junction at AVEVA/New Data Centre access and this will have 3 way traffic management and is expected to take 3 weeks.
5. Finally the access road into site via High Cross will close from week commence 19 August and this will be for approximately 7 weeks. This closure will be fully diversion signed from Madingley Road and around the site with diversion management (sighs) taking us via JJ Thompson Road and round to AVEVA from there. However there will be a trial closure of the High Cross Road entrance on the Thursday/Friday 15th & 16th August prior to the work starting on 19th, just to ensure all the signage is correct and easily followed. "
I am interpreting this as at least 6 weeks of temporary traffic lights which will not detect people on bikes.
I suspect cycle detection was only mentioned because I had specifically asked this question when the issue of temporary traffic lights first came up.
I have sent a message back to our facilities manager saying that I don't think this is acceptable as:
1) Cycle usage is nearly as high has car usage here in summer
2) I also see people using this as a through-route for Coton
3) We are on a side road off a through-route for buses, so I suspect the lights on their normal sequence will not be at all favourable for a person on a bike trying to get out, as the normal sequence will not want to disrupt bus flow too much.
4) I fear that the complete lack of provision will lead to some people breaking the rules, which could be dangerous.
However, she is merely relaying these details to us and is not responsible for it. She can contact the site project managers about any issues, which I hope she will do.
Any other ideas?
Created by christhebull // 0 threads
Heading westbound along Bridge Road towards the junction with Rownham Hill, one sees a narrow (90 cm wide) cycle lane leading to an ASL (lacking the appropriate markings), however, the main issue with this junction is the time given to cyclists heading across Rownham Hill into Ashton Court Estate. A slow cyclist who passes the stop line just after the signals turn amber will struggle (uphill) to cross towards the gatehouse before traffic coming up Rownham Hill gets a green light. As cyclists will have previously navigated the debacle that exists on both sides of the Suspension Bridge, this is hardly a welcoming introduction to what is actually a very nice estate to ride around.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Ian Jackson // 0 threads
DUPLICATE ISSUE OF
http://www.cyclescape.org/issues/74-20mph-limits-in-cambridge
- PLEASE RESPOND THERE.
---
The Cambridge City Council's consultation on 20mph speed limits in North Cambridge closes today.
Here is the URL:
https://www.cambridge.gov.uk/20mph-speed-limit
If you haven't already done this survey, please do so.
(I have said that I agree with all the proposals, and indeed that they don't go far enough.)
Created by David Earl // 1 thread
Cambridgeshire County Council proposes traffic lights on Sawston bypass where NCN11 and the northern link to Sawston meets it. However, the plan is for cyclists to have to cross three separate sets of lights.
Created by Ian Jackson // 1 thread
There are "Cyclists dismount and use footway" signs at some roadworks on Kings Hedges Road SE-bound outside the Post Office near the Golden Hind.
I spoke to a worker who said the sign had been put in by their traffic management team, after getting permission from Cambridgeshire County Council.
I have phoned the County who say one of their traffic management people will phone me back.
I have also made this FOI request:
https://www.whatdotheyknow.com/request/roadworks_traffic_management_cor
Created by David Earl // 1 thread
Ida Darwin Hospital, Fulbourn Old Drift, Fulbourn, Cambridge, Cambridgeshire, CB21 5EE
Approval is sought for a. A development brief for the Fulbourn and Ida Darwin hospital sites and b. Outline Planning Permission for the redevelopment of the Ida Darwin Hospital site with up to 180 dwellings (C3) including affordable housing, a 70 unit Extra Care facility (C2) with access and associated works, open space and landscaping, following the demolition of existing buildings on site.
Created by ambrosen // 0 threads
Turning right, eastbound from Weston Road to Victoria Park the cycle path (marked as a footpath on the map above, but signed in roundels once in the park) is not marked at all from the road.
A pointer showing the existence of the path would be great. Even better would be a turn refuge from the centre of Weston Road.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Chris Ruse // 2 threads
I think I’m correct in saying that several months ago the kerb at the junction of Strawberry Vale and Waldegrave Road was realigned with the result that the cycle lane that had previously continued up to the stop line was cut short at the point where the kerb was realigned. Photo 1341 -1 shows this quite clearly. I cycle along this road fairly frequently and had recognised this as a dangerous point for a cyclist but did nothing about it other than taking care. On Monday however my alertness paid off as a large lorry overtook me about 8 – 9 metres back from the stop line. Had I not braked hard it would have undoubtedly have hit me. The alignment of the kerb creates a pinch point which a cyclist is funnelled into without any warning.
It appears to me that the needs of cyclists have been ignored in the redesign of this junction and that a road safety hazard has been created.
Created by Shaun McDonald // 1 thread
As a cyclist it's pretty horrible to cycle along Clerkenwell Road due to it being much narrower than it used to be, or could be due to the ultra wide pavements.
West bound there is a bit of 2 lane queuing preventing cyclists getting past. Eastbound just before the lights the Island is in the way forcing cyclists to merge with motors.
Created by Simon Nuttall // 2 threads
Garden Walk is a two way street for all but the last few metres at it's junction with Victoria Road. At that end there is a cycle bypass to the no-entry. It's a bodge up that only transport planners understand.
http://www.cyclestreets.net/location/10161/
I've experienced it myself, but a resident of the street tells me of her frequent problems with aggressive oncoming traffic (mostly van drivers) that barge at her as she rides up the road. When she tries to point out how the street works they don't listen and challenge her knowledge because of her french accent.
I've suggested these two signage solutions...
Blue signs...
http://www.cyclestreets.net/location/44690/
Big bicycle markings on the road...
http://www.cyclestreets.net/location/37295/
Martin Lucas-Smith // 1 thread
This new development is almost finished, but there is no obvious sign of cycle parking on the frontage - which I believe may be for shops - yet (and the back area is obviously not publicly accessible at the moment).
Do we know what cycle parking is planned here?
Martin Lucas-Smith // 1 thread
There have been several reports of a surfacing problem here.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Martin Lucas-Smith // 2 threads
The University Arms (next to the entrance to Parker's Piece) is planning a new frontage.
This could have cycle access issues.
Also this would be a good opportunity to push for a contraflow from Hobbs Pavilion to Regent Street.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.