Quietway 2 (Cycleway 27) in Westminster
This is an east-west cycle route between Bayswater and Fitzrovia.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Colin Wing // 7 threads
This is an east-west cycle route between Bayswater and Fitzrovia.
Created by Colin Wing // 4 threads
This is the route of Quietway 19 in Westminster. Only this section is scheduled for completion by 2016. The remaining section through Mayfair is scheduled for a later phase.
Nominal deadline set to clear this from the Consultation Map.
Created by Colin Wing // 4 threads
This is the route of the Circle Line South Quietway in Westminster. Only this section is scheduled for completion by 2016.
Created by Colin Wing // 2 threads
This is one of the options for Cycle Superhighway 5 in Westminster.
Created by Colin Wing // 2 threads
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.
Created by Colin Wing // 4 threads
This is the proposed route of the Grand Union Quietway. It actually follows the Regent's Canal.
Created by Colin Wing // 4 threads
This is the proposed route of Quietway 68 in Westminster.
Created by Hester Wells // 1 thread
There are proposals to build a permanent ice rink on land owned by Marshalls within the Park and Ride site. Various community groups are currently being consulted at an early stage about the plans.
Cycling issues include cycle parking, construction and delivery lorry danger, and connectivity for cycling.
The site in on NCN 51.
Created by Angela Hobsbaum // 1 thread
Camden Council are consulting on proposals to improve road safety around the newly-rebuilt Netley Primary Schools, Stanhope Street NW1 3EX.
Full details can be found here:
https://consultations.wearecamden.org/culture-environment/public-realm-improvements-netley-primary-school-de/consult_view
Deadline Friday 12 December.
I will collate comments and write a response from Camden Cyclists on Wed. 10th December.
Created by David Butler // 3 threads
Manchester City Council's proposed Prstwich Cycleway, a route from Heaton Park to Hulme Hall Lane, with the southern section following NCN Route 60.
Created by David Butler // 1 thread
Manchester City proposed route from Altrincham Road to the airport, funded by CCAG. Most of this route exists already; the proposals upgrade sections and creates new links to form continuous route.
Created by Colin Rosenstiel // 1 thread
A planning application (14/1818/FUL) proposes to replace the road blockers with gates. The design has such a large gate it has to open to the left of the opening as seen from Manor St (see http://goo.gl/maps/j7Lfm), requiring 3 of the 5 cycle parking hoops (obscured by the trees and not in use in the photo) to be moved to the right of the entrance. They serve shops on King St and visitors to the Malcolm Place flats so moving them would take them significantly further from the needs they serve.
I am drafting an email to the planning department to include criticism of the gate design from my point of view as a local resident. I am also soliciting Campaign support on the cycle parking issue. I'll post a draft shortly.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Tom McKeown // 1 thread
Drivers ignoring the marked priority at Magdalene pinch point is a regular occurrence when faced with city bound riders. At times this can be very dangerous. Especially when large numbers of riders are forced into a very small gap between the vehicle and the bollards. I should imagine the situation is especially unpleasant travelling with small children. Also difficult to resolve with a wider cargo cycle, trailer or trike.
Created by Al Storer // 1 thread
Motor vehicles frequently fail to give priority to cyclists leading to conflict
Created by Philip Shore // 2 threads
With very limited maintenance on cyclepaths, should the local community:
- volunteer time and effort to increase maintainance eg cutting back hedgerows?
- if desired, how could volunteer effort be arranged?
Created by Jean Dollimore // 1 thread
This issue is about our priorities for two way cycling in a pair of one way streets, the first north and the second south of the canal at Camden Lock:
- Hawley Road runs one way eastbound between Chalk farm Road and Kentish Town road.
- Hawley Crescent runs one way westbound from Kentish Town Road to Camden High Street
Both of these roads are on our list of permeability issues but we are being asked to say which we would like to see tackled first.
Created by Richard Jennings // 2 threads
There are a variety of issues with construction lorries in this busy location, closure of the footway outside the hotel, narrowing of the route from Regents Street to Parker's Piece and traffic signal changes. The construction is expected to take two years.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Oscar Hughes // 2 threads
Large numbers of cyclists and pedestrians access Cambridge station from Devonshire Road and from the pedestrian and cycle bridge through the car park. This is unsafe, unpleasant and dangerous. How could we develop alternatives? A better route along Station Road and Tenison Road? Direct access to the station from the east doesn't really seem feasible.
Created by Oscar Hughes // 1 thread
This unpleasant underpass is heavily criticised in the 2016 vision.
http://www.camcycle.org.uk/vision2016/junctions.html#elizabethway
Created by Andrea // 1 thread
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
Created by Andrea // 1 thread
more cycle parking spaces for all times of the day needed
Cargo bike parking needed
Current two-tier parking for cycles are not female-friendly as upper tier too heavy to lift
Created by Jean Dollimore // 1 thread
Leather Lane has a well established market that trades on the street throughout the week
To stop vehicles using Leather Lane when the market is on, Camden proposes to close access to Leather Lane and other roads leading directly to Leather Lane with some consequent changes in parking provision.
Camden Council's proposals can be seen at:
They include the following:
Option A
- close Leather Lane
- close Hatton Wall, between Leather Lane and Hatton Garden
- close St Cross Street, between Leather Lane and Hatton Garden
- close Portpool Lane and Baldwin’s Gardens where they meet Leather Lane
Option B
- same as Option A but keeps St Cross Street open
Comments:
The proposal consistently refers to stopping "vehicles" using Leather Lane. It should refer to "motor vehicles" so that cycles still have access.
Reply due 5 December 2014.
Please add your comments by 1st December
Created by Andrea // 0 threads
a hotspot for delivery vans and cars parking on cycle lanes. We need enforcement to curb this
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Owners of Brighton Hill Retail park are preparing a planning application for improvements including a coffee shop in the carpark. this is our opportunity to ask for secure cycle parking for the public and employees.
Created by mikewg // 1 thread
Numerous people responding to the survey experience safety issues with this location. Some comments here:
Town centre around the monument, the cobbles are a night mare and shake you badly, I have had my bike lights shaken off before, and had to save them from being run over. You cannot cycle quickly over the cobbles.
Taunton Town Centre - cobbles & volume of traffic
I go through the centre of town. I have had a couple of accidents on the cobbled surface outside the market house over the years of cycling this route. Both resulted in injuries including concussion, facial injuries requiring stitching, a shoulder and hip injury which required physio and steroid injections to resolve. The second of these happened on a wet day, when I was forced to brake because a bus driver, having seen me coming, decided to pull out in front of me. He was relatively remorseful, but it was an accident that would not have happened if 1, he hadn't taken the decision that a cyclist didn't matter, and 2, the road surface was smoother as the braking action unsteadied me on a rough surface - the fall was inevitable as soon as I touched the brakes really. As a consequence, I now cycle along the back of the market house as I cannot bring myself to cycle across the cobbled road surface.
Cobblestones around parade
High Street; ridiculous cobbled roundabout making town centre very dangerous
Cobbles in front of Market Hall
Cobble stones on roundabout in centre of town feels unsafe and dangerous for cyclists.
COBBLES on the main parade
cobbles in town centre
'cobbles ' Market house - dangerous surface - traffic in a hurry .
Cobbles at Market House roundabout,
Cobbles around Burma Memorial make it impossible to take hand off handlebars to signal and are treacherous at best of times
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Al Storer // 2 threads
Proposed building will have 3000 employees, 250 car parkign spaces and 900 bike parking spaces
Created by Andrea Bredel // 1 thread
this is one of many cycle lanes here in Ipswich that go on and off the road several times. This is very awkward for cyclists as they need to be very careful when getting back onto the road and most probably confuses drivers as well.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A radical idea maybe, but why not close the narrow, one-way, Lower Castle Street to cars and make it two-way for bikes and pedestrians? It would
1) solve the problem of the confusing junction at the bottom end.
2) remove the very complex routing of routes 42&46
3) avoid cyclists cutting though the pedestrian zone and one-way part of cross street when travelling east across town.
Bus/cycle lane lights not sensing cyclists.
Created by John Ackers // 1 thread
Islington Council wants to 'transform Clerkenwell Green into a high-quality public space. To do this we plan to provide more space for people to meet and gather by reducing road space and removing parking'.
Created by Chris Lord // 1 thread
Currently there is no safe cycle route between South Loughton / West Debden and Chigwell School. This safer off-road route could be popular with school children and their parents. At Highwood Lane end the route could connect with Debden via Oakwood Hill and Loughton (Traps Hill) via Alderton Hall Lane north.
* Approx. 1 mile length part on-road and part off-road scheme from London Square (Chigwell) via Grange Farm Lane.
* Section 1: Approx. 1 mile length part on- road (via provision of signage and road markings) and part off-road scheme (a new unlit 3m wide shared cycle route facility) from London Square (Chigwell) via Grange Farm Lane, crossing the River Roding via an existing bridge and on to Highwood Lane.
* Section 2: Provision of an on-road cycling route in both directions along Oakwood Hill, made possible through parking restrictions and removal of the central hatching/wide centrelines.
* Section 3: Provision of an on-road cycling route in both directions along Alderton Hall Lane and Traps Hill, via signage and road markings, and parking restrictions/formalisation where required.
Medium Term
£500,000 (Assumes route is not a PROW and excludes stats diversions)
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by Peter Loader // 0 threads
This proposed Maple Cross to Shepherd Primary School cycle route follows the existing Maple Cross to Rickmansworth route as far as the Long Lane/Eastwick Crescent junction in Mill End.
The new part of the route consists of:
* Part of the new Long Lane residential service road.
* Part of Kenwood Drive.
* Part of the old Long Lane road.
* Rickmansworth Footpath 012 (upgraded to a bridleway).
* Beresford Road.
* Part of Penn Road.
* Part of the south east path through King George V Playing Fields, Mill End.
* The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area.
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by North Devon Cycling Forum // 1 thread
Removal of difficult barrier on cycle path ending on Eastern Avenue; not possible to pass for trikes/tandems/mobility vehicles
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.