Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first:

  • Consultation on Cobden Junction

    Created by Jean Dollimore // 5 threads

    Camden Council proposes major improvements to Cobden junction – the junction of Camden High Street with Crowndale Road and Hampstead Road at its southern end.

    They propose the following measures:

    - eliminate the unnecessary northbound road on the east side of the island

    - gain extra footway space on the east side of the road (uses to include cycle parking, trees, seating)

    - widen the footway outside Mornington Crescent Station

    - safer, quicker and simpler pedestrian crossings

    - improved link for cyclists to the Mornington Crescent quiet route (from Arlington Road).

    - new ASL boxes with lead-in lanes on the approach to the junction from Eversholt Street, Crowndale Road and Hampstead Road.

    - re-site the statue of Richard Cobden and the war memorial

    Proposal for contraflow cycling on Crowndale Road:

    A few months ago, we were shown designs for a contraflow on Crowndale Road between Hampstead Road and Bayham Street with some junction changes at the latter to accommodate it. Unfortunately, this was rejected by TfL on the grounds that it would delay buses. This consultation notes that the layout has been designed to accommodate the contraflow at a future date.

    This consultation also says that in addition, alternative options for providing a west to east link are being explored at both Delancey Street / Pratt Street and Oakley Square. We need to encourage Camden to pursue these essential links. In the case of the latter, there is an urgent need to allow cyclists to make right turn right into Hampstead road from the southern end of Mornington Crescent.

    See consultation on Camden Council website:

    https://consultations.wearecamden.org/culture-environment/cobdenjunction

    Please sign in to vote.
  • Catholic Church junction surfacing

    Created by Aidan Van de Weyer // 0 threads

    The Hills Road / Regent Street axis of the Catholic Church junction was resurfaced overnight (28-29 August) as part of the junction upgrade.

    Many of the damaged iron works (manhole covers, etc) have not been changed. Some are in a bad state and quite dangerous because they have worn smooth, sunk or tilted.

    I have contacted the Traffic Signals team at CCC, as they seem to be responsible for the works, and they should be getting back to me.

    If anyone else fancies having a go at finding out what is going on and whether anything can now be done, it would be very welcome.

    Please sign in to vote.
  • New CCC website design and implementation

    Created by George Coulouris // 1 thread

    For discussions on the design of the new website, following the CCC Committee decision to initiate the construction of a new CCC website.

    A working party has been set up, consisting initially of George, Jean, Ben and Geoff.

    Please sign in to vote.
  • Burgess Road 80cm cycle lane

    Created by Dan Doherty // 0 threads

    Very narrow cycle lane between University Road and Violet Road and Broadlands Road. Encourages very close passes when cycling in the lane (with 10cm of your handlebars), or aggressive impatient driving if you cycle outside of the lane. Additionally to cycle within this cycle lane it is necessary to cycle closer to the kerb than the recommended 50cm from kerb (http://www.cyclescheme.co.uk/community/how-to/road-positioning)
    Lane markings are extremely faded. Lane contains several drains.

    No cycle lane would be better than the current cycle lane.

    Please sign in to vote.
  • Obstruction to family cycling

    Created by Martinn // 0 threads

    There is a set of bollard which have been placed that prevent cycling as a family, in order to reduce car journeys. Negotiation without manhandling the Bike and dismounting is impossible when riding a Tandem, and requires even more effort when a Tag -along is connected. Can these obstructions be removed please

    Please sign in to vote.
  • signage on cycle-pedestrian path next to Trumpington allotments, Cambridge

    Created by Robert Asher // 1 thread

    Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
    So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
    Thanks for any feedback, Robert
    https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf

    Please sign in to vote.
  • Reduce conflict between cycles and pedestrians around Stoke Bridge

    Created by Shaun McDonald // 0 threads

    There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.

    To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.

    Please sign in to vote.
  • Toucan crossing between Featherstone Street and Leonard Street slow to change

    Created by Shaun McDonald // 0 threads

    The toucan crossing for cyclists avoiding Old Street Junction are very slow to change for pedestrians and cyclists. Often people get fed up waiting and then dart across in a gap. Or once there is a gap, it takes until cars start appearing before they change.

    If TfL is seriously interested in encouraging walking and cycling they need to change the timing of these lights so that they don't take forever to change.

    Please sign in to vote.
  • Hump across the lane - Royal Parade

    Created by WilliamNB // 1 thread

    On Royal Parade, when traveling in an easterly direction, shortly before the pedestrian lights by the Theatre Royal there is a poorly repaired trench across the road.
    In lane 2, the surface is reasonable, but in lane 1 the tar has shifted to create a severe and unmarked speed hump. This is dangerous to cyclists.

    Please sign in to vote.
  • Desirable route - Sydenham Hill to Wood Vale

    Created by Tom Chance // 1 thread

    Making it safe and convenient to travel from Sydenham Hill onto London Road and then onto Wood Vale would improve the link from this part of Sydenham / Crystal Palace into East Dulwich and onto the LCN 25 and 22 routes north.

    Currently one can either dismount at the bottom of the hill, cross Sydenham Hill and then London Road by foot and then take the off-road cycle lane onto Wood Vale; or one can cycle left onto London Road, cross two lanes of traffic, brake into the little cut and cross over the southbound traffic to get onto Wood Vale. The first route is slow and inconvenient, the second is dangerous.

    Please sign in to vote.
  • Pembroke Street closed from 2 September 2013

    Created by David Earl // 1 thread

    According to the Cambridgeshire Road works register, Pembroke Street is going to be closed for a long period starting September 2 by the museum of Zoology. Not clear what, if any, the impact on cycles would be, but the hole will be a dramatic 10m deep, so the works will presumably be quite extensive. Also, Tennis Court Road closed for one day on August 9 to prepare.
    http://roadworks.org/?u_se_id=30862209:1&e=545014&n=258186&z=7&t=b

    Please sign in to vote.
  • Police ignoring advanced stop lines

    Created by Chris Sandbrook // 1 thread

    I have just watched a police car over-run the advanced stop lines twice on Gilbert road, once at the Carlton Way cross roads and then again at the Milton Road T-junction. Both times the police car was approaching an already red light, so they had ample time to stop before the line. The second time they filled at least half of the box. If the police in Cambridge can't be relied on to respect the advanced stop line, how can we expect the general public to do so? Does anyone have similar stories or any suggestions on what to do about it? I didn't get the number plate unfortunately, because I thought turning round and photographing a police car on my phone might be more trouble than it's worth!

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top