LCDS draft
A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by charlie_lcc // 10 threads
A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
Created by charlie_lcc // 5 threads
The London Cycle Safety Action Plan 2 (CSAP2) draft is out for consultation. Deadline 25th July 2014
https://consultations.tfl.gov.uk/cycling/draft-safety-action-plan
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Richard Moss // 1 thread
The Over to Longstanton road is to be closed from 30 June 2014 for 9 weeks for reconstruction of Gravel Bridge.
Created by Paul L // 3 threads
Richmond Council say
"a signalised PUFFIN crossing with pedestrian countdown outside number 182 Kew Road (previously outside 180) Footway widening both sides of Kew Road. We have attempted to minimise the impact on the cycle lanes by introducing long tapers and following existing extended footways where possible. The kerb widening is essential to ensure sightlines to the signal heads past the many street trees."
We suggested cranked supports for the signals to avoid the loss of cycle lanes but they claim TFL disapproval.
Created by timlennon // 1 thread
Text of message from TfL:
All,
We are proposing to convert the current dual PUFFIN crossing at the above location to a dual TOUCAN crossing, formalising the facility for cyclists.
The initial design is attached, which includes localised resurfacing of footways and some carriageway works. A lighting assessment has also been undertaken which recommends a full lantern replacement of the columns retaining all lighting columns once structural testing has been completed and passed.
We also propose to extend the shared use footway further north on Marksbury Avenue and further south on Manor Grove to enable safer entry/exits for cyclists to the TOUCAN crossing.
The impact (if any) is currently being determined by Traffic Signals.
If you have any comments or suggestions, please let me have these by cop Friday 27th June.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by David Earl // 1 thread
The DfT have written to us with a proposed TRO to replace the sliproad from westbound A14 at Girton to southbound M11. This is also part of the widening scheme between Histon and Girton, but this aspect requires an order to give the lane motorway status. The main effect seems to be to lengthen the A14 part of the slip road to reduce queues on the main A14.
I don't think anything particular needs doing with this, so I don't plan to scan the correspondence, but if anyone wants if, please ask.
Preferred route to be signed as an alternative to Chilwell High Road agreed between City, Broxtowe and County Councils.
Created by MJR // 2 threads
Some of (the last of?) the s106 money from two out-of-town big box supermarkets is being used to remodel the connections between the bus and rail stations. National Route 1 runs through this area and the bus station may also be Lynn's biggest cycle park, so there's quite a lot of potential for this to do good - or to do harm.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Area Committees are a joint meeting attended by both city and county councillors. They decide on planning issues in the area, but also have a role in the allocation of community development money from S106 contributions. They offer an opportunity to engage with multiple councillors at once, through the Open Forum section and speaking on specific Agenda items. The East Area's website is here: https://www.cambridge.gov.uk/west-central-area-committee
Speaking at these meetings is a good way of making your feelings on matters the councils control public
As discussed between local cycling organisations there is a desperate need for a signed route which avoids Chilwell High Road where there have been a number of accidents now tram tracks are laid in places. This route also avoids Beeston High St which is a lengthy dismount section from 9-5. This route supersedes the previous northerly route. A southern avoiding route has also been plotted on cyclescape
Created by Jean Dollimore // 1 thread
The proposals seek to improve road safety on the streets surrounding Regents High school in Somers Town which is being rebuilt. This school is labelled "South Camden Community School" on the map.
The consultation is on Camden's website at:
Currently the school is accessed from Charrington Street but the new building is going to face the other way and will be accessed via Chalton Street. Therefore most of the proposal are related to making a new school entrance and building out the footways in Chalton Street while taking them away in Charrington Street. All of this is clearly necessary, but doesn't appear to add to road safety.
The council also proposes a new speed table at the junction of Chalton Street and Aldenham Street. This would help with road safety.
Cyclists are already concerned with the rat-running on Ossulston Street; this quite likely accesses Eversholt Street via Chalton Street. Surely we should ask for this rat running to be prevented both for the safety of the cycle route and for children going to Regents High School?
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Anon // 0 threads
There is currently no secure locks provided at Port Rodie bus stop, the main departure stop for buses eastwards towards Dumfries and Carlisle.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Peter Loader // 0 threads
Transport Initiatives LLP is an independent transport planning consultancy. They have carried out an audit for Three Rivers District Council classifying roads, paths and crossings in terms of the UK National Cycle Training Standard (Bikeability) Level needed to be able to ride in comparative safety. The results can be seen on Three Rivers District Council's web site.
Transport Initiatives have classified the roundabout at M25 Junction 17, the adjacent Maple Cross Roundabout, and the dual carriageway between them as Level 3.5, i.e. "Roads & crossings with a very high level of risk, unsuitable for even highly experienced cyclists".
For detailed documentation, please see
http://www.threerivers.gov.uk/Default.aspx/Web/CyclingInformation
and download
Maps by area|Maple Cross
plus
Cycling safety audit|CSNA Leaflet
Following closely the route of an old railway line between Colchester and Brightlingsea this proposed route would link Colchester to Walton-on-the-Naze. It provides a much needed commuter route out of Brightlingsea linking it safely to Wivenhoe, the University of Essex and Colchester and creates a new leisure route in a holiday district. It builds on the existing four mile NCN51 route from Colchester to Wivenhoe by adding 5 miles off-road to Brightlingsea via a new river crossing at Alresford Creek. From there it utilises an existing pleasant frequent summer ferry crossing to Point Clear and creates a 25 mile coastal route much of it off-road.
Created by Gary // 0 threads
To improve safety after numerous fatal car accidents the Highways Agency are currently implementing speed restrictions but are also designing a new roundabout for the A120 near Pellens Corner/Horsley Cross. NCN51 passes nearby. Cyclists don't generally want to cycle the A120 but we do have to cross it to get across Tendring District. Roundabouts are particular hard for cyclists to use on A roads. So will the Highways Agency proposal include the needs of cyclists? http://www.highways.gov.uk/roads/road-projects/A120-Pellens-Corner-Average-Speed-CamerasSafety-Improvements
Created by Gary // 0 threads
Why would you put a gate across an official cycle route through the "Hangings" in Harwich, on the North Sea Cycle Route from Harwich International to Harwich Town? I've seen visitors from Europe try and cycle through this obstruction with trailers.
Created by Anna Langley // 0 threads
In advance of whatever fair it is appearing on Midsummer common, the "cyclists dismount" signs have appeared on the entrances to the common.
Created by David Earl // 1 thread
Leaflet through my door today about "new homes on land off Teversham Road, Fulbourn". Unspecific at this stage, will be revealed, no doubt, at consultation event on 28 June. But it must be big for the scale of the consultation. It also has a website: http://www.castlefieldconsultation.co.uk but that also says nothing very specific as yet.
Created by Jean Dollimore // 6 threads
This scheme proposes to restore two way working in Tottenham Court Road (TCR) and in the Gower Street alignment which includes Bloomsbury Street and Shaftesbury Avenue. All the bus routes will be on TCR.
The consultation is on Camden's website at:
http://www.wearecamden.org/westendproject/
In TCR, Camden proposes a "bus and cycle street" from 8 am to 7pm (Monday to Saturday) with local access for cars, taxis and loading on short sections of Tottenham Court Road via side roads.
TCR will have a pair of 4.5m wide carriageways to be shared by cycles and buses (90 buses per hour in each direction) and by the additional local traffic.
In the Gower Street alignment, Camden proposes two-way access for private motor vehicles (no buses) and that these roads will have a pair of 4.5m wide carriageways, each including a lightly segregated 1.5m wide cycle track.
Other measures proposed:
- in both TCR and the Gower Street alignment Camden proposes raised sections of road to reduce motor speeds
- two-way cycling in all the side streets (except for Maple Street, University Street and Howland Street)
- new public spaces including a new park on Alfred Place and a ladder of calm side streets.
These changes to roads and to cycle permeability are shown in the diagram at:
http://www.wearecamden.org/westendproject/assets/images/cycling-plan-resized
Details of the road layout for TCR are at:
http://www.wearecamden.org/westendproject/assets/images/tcr-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/tcr-south-resized
Details of the road layout for the Gower Street alignment are at:
http://www.wearecamden.org/westendproject/assets/images/gower-street-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/gower-street-south-resized
Exhibitions are to be held at the Building Centre, Store Street on 19th June (10 am to 5pm) and 7th July (5pm to 8pm),
Camden Cyclists are holding a public meeting for cyclists to discuss this project.
On 30th June 7pm - 9pm
at the YMCA Indian Student Hostel, 41 Fitzroy Square, London, W1T 6AQ.
We will finalise our response to the consultation early in July.
The public consultation will run until Friday 18 July 2014.
Created by Charlie Halliday // 1 thread
Proposal by HCC to add advisory cycle lanes on both sides of Kingsmead between the SUP near the junction with Victoria Road to the entrance of Pinehurst car park.
The cycle lanes would have a contrasting red surface at the entrances to Sainsburys and the Kingsmead and Sainsburys car parks.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by TMiles // 0 threads
St Michael's Road can be a useful local route for west-bound cyclists avoiding the central junction in Headingley and its approach roads, dominated by queuing traffic or parked cars.
The current configuration could be improved to allow cyclists approaching the junction to cross directly from St Michael's Rd into the cycle box immediately in front of the traffic lights at the northern extremity of Cardigan Road.
A dedicated traffic signal, coordinated with the parallel pedestrian crossing (to the extreme right of the image), would allow cyclists to cross from the island in the foreground to the advanced stop line in the far lane.
These improvements would require very little actual ground work, instead making use of smarter signal control. Further adjustments to the sequencing could see cyclists granted a synchronized left turn into Kirkstall Lane.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by T Harris // 1 thread
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Roxanne (Cycling Campaign Officer) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Belle Vue Road is very steep for a recommended cycle route."
It's marked on the Ipswich Cycle Route Map.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Lewisham Cyclists // 1 thread
Royal Borough of Greenwich consultation on improvements to road junction at Blackheath Gate of Greenwich Park for Quietway 1 extension.
Consultation closes 19th April 2019.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Heather Rainbow // 1 thread
A proposed cross country route from North Waltham via Level lane and farm tracks and the ROW to Kempshott and the Roman road. Parts of the route are ROWs on footpaths and need upgrading to restricted byeway and parts are private tracks which could be permissive paths. Some of the land crossed has been registered on the SHEELA as available for development and some is on the boundary of Hounsome fields and Kennel farm.
It is proposed that this route is adopted as part of the North Waltham Neighbourhood plan so that CIL and section 106 money can be used to develop it.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by Mike Comerford // 1 thread
Those of us living in the area marked have no safe access to the cycle network in order to cycle in and out of Dumfries. There are many keen cyclists in this area (as evidenced by the Toirthorwald Cycle Sportive for example).
I live with my family in a cluster of houses close to the A75 (Mouswald Banks) end of Linns Road. There are a number of cyclists at this location and we wish to cycle to Dumfries for work and for social / leisure reasons.
Our Options are:
- the A75 - definitely not safe
- to Torthorwald then along the A709 - narrow, full of heavy trucks, no pavement and very unsafe
- through Torthorwald, across the A709, onwards to Tinwald and then onto the A701 towards Dumfries until able to join the Caledonian Cycleway at Locharbriiggs. This stretch of the A701 is narrow and full of heavy trucks. Where there is a pavement it is too narrow to cycle along it. This is also a long way round to get to Dumfries.
The best solution would be to create a cycle path from Torthorwald along the A709 and through Heathhall woods to connect with the cycle network. This would serve Torthowald, Collin and surrounding hamlets. There is land along the side of the A709 to allow space to make a cycle path.
The shortest in terms of building new infrastructure, would be to make a cycle path along the A701 from the Tinwald road end to Locharbriggs. However space at the roadside along the A701 is very limited, and the route is a long way round for the communities from Torthorwald and Collin.
Building a cycle path along the A75 is an unlikely and unattractive proposition and would cause disruption along a major Trunk road.
Active travel is a priority for the Scottish Government to increase physical activity and reduce traffic emissions. Funding is available through Sustrans.
'Sustrans Scotland's Community Links programme provides funding for the creation of infrastructure that makes it easier for people to walk and cycle for everyday journeys. The programme is funded by Transport Scotland and has funded hundreds of projects across Scotland since 2010.
Through the Scottish Government's Programme for Government 2017-18, the active travel budget has been doubled to £80 million per year, from 2018-19. Community Links will help deliver a key action from this by supporting projects that make our towns and cities friendlier and safer places for people to walk and cycle.'
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by Shaun McDonald // 0 threads
Further to http://www.cyclescape.org/issues/928-paper-mill-lane-alterations-planning-application I think it would be useful to campaign for a cycle and walking link from the site through to the retail park with major supermarket and other amenities, and also other links to that western part of Ipswich.
In my quick skim through the planning application I've not seen any consideration to this route.
Created by Charles Martin // 1 thread
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"