PA_212931_GodboltFarm5
Development comprising 5 new dwellings, 1 with link attached garage, two with detached garages; incorporating access onto Great Tey Road, Little Tey.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Steven Moseley // 1 thread
Development comprising 5 new dwellings, 1 with link attached garage, two with detached garages; incorporating access onto Great Tey Road, Little Tey.
Created by Steven Moseley // 1 thread
A proposed rural exceptions site of seven homes (resubmission of 201984)
Created by Steven Moseley // 1 thread
Outline application to refurbish the host house µLittle Glebe' from 3no. existing dwelling units to revert to a single dwelling house, anderect two new houses with a new access onto Spring Lane.
Created by Steven Moseley // 1 thread
Someone appears to have dumped large rocks and rubble into the pot holes in Daws lane. This might make the area more passable to cars that use it to access the allotments but poses a severe danger to cyclist given the size of the rocks, and that the area is poorly lit and frequently flooded.
I tried reporting the issue to the council but received the response:
The issue you raised with us is the responsibility of the landowner. Unfortunately we do not have records of who is responsible for this location and we are therefore unable to take any action.
Created by David Green // 2 threads
I run 1-day Wheel Building Courses in Cambridge
These are well-established intensive 1-day practical courses offered at 'level 1 (beginner) and level 2* (refresher/intermediate) level.
You learn how to build strong and durable bicycle wheels in a controlled, supportive environment. Group size is kept small to ensure a high student-teacher ratio. All equipment is provided, but you can bring your own components to build if you want to.
For fully information, dates and booking details please visit https://www.cambridgewheelbuilding.co.uk/
* dependent on demand.
Created by Steven Moseley // 1 thread
Erection 3No. Commercial Units (Class E) and car parking.
Created by Steven Moseley // 1 thread
An application to determine if prior approval is required for a proposed: Change of Use of Agricultural Buildings to Dwellinghouses (Class C3), and for building operations reasonably necessary for the conversion.
Created by Steven Moseley // 1 thread
Change of Use from an existing Guest House to a House of Multiple Occupancy (HMO)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Application reference & documents: 21/04952/FUL
Erection of new 2nd floor to provide two new dwelling units with balconies.
208 - 208A Cherry Hinton Road Cambridge CB1 7AW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from residential (C3) to 6bed HMO for 6 persons (sui generis).
5 Britten Place Cambridge CB1 3TS
Cambridge
Application reference : 21/04935/FUL
Response to planning application for Lodge Lane business park expansion
https://www.ensembling.com/269152
Created by Jean Dollimore // 1 thread
A set of temporary measures was implemented in September 2020 with a view to reducing through traffic in Arlington Road and the surrounding streets. Further measures were added later to make the scheme more effective.
Camden reports the following changes in the local area:
- a 15% increase in cycle volumes
- 43% decrease in motor traffic
- 15% decrease in traffic-related collisions
Camden is consulting on making all of these measures permanent with the following enhancements:
Jamestown Road: restriction on eastbound motor vehicles. Replace the planter with a traffic island
Inverness Street: no access for motor vehicles to Arlington Road. Replace the planters with traffic islands and widen the footway outside Cavendish School. NOTE: At our meeting on Monday’ 15th Nov, it was suggested we should ask for a School Street for Cavendish School.
Buck Street: no way in and out for motor vehicles from Kentish Town Road
Arlington Road (south of junction of Delancey Street): restriction on northbound motor vehicles. Add a traffic island and greening, raise carriageway.
Mornington Street: no way in and out for motor vehicles at the junction with Albert Street
Albert Street: no way in and out for motor vehicles at the junction with Mornington Place. Replace planters with removable bollards
Mornington Place: no way in and out for motor vehicles at the junction with Clarkson Row/Mornington Terrace. Replace planters with removable bollards. New tree and planting on Mornington Street. New Sustainable Urban Drainage System (SUDS) on Clarkson Row
New junction designs and other changes
Delancey Street @ Albert Street - remove the right turn lane (from Albert Street) and build out the footway. NOTE: the original Delancey-Pratt scheme indicated the entry to a new contraflow cycle here. We should aim to keep that.
Delancey Street @Arlington Road Raise the junction.
Parkway Cycle Hire Station: move to the southern corner of Albert Street.
Parkway junction with Arlington Road: lengthen the feeder lane on Parkway. NOTE (as suggested at our meeting on 15th) this cycle lane should extend over the space occupied by the cycle hire station.
Parkway junction with Albert Street: double yellow lines
Parkway junction with Arlington Road: widen eastern footway to north of junction and remove two parking spaces.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing garage and erection of two 3-bed semi-detached houses on 2.5 floors with car and cycle parking and bin storage on land adjacent No 1 Greville Road, Cambridge
Land Adj 1 Greville Road Cambridge Cambridgeshire CB1 3QJ
Cambridge
Application reference : 21/04756/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of existing house to form 2 studio flats.
84 Ramsden Square Cambridge CB4 2BL
Cambridge
Application reference : 21/04865/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no. dwellings following demolition of existing bungalow
200 Perne Road Cambridge CB1 3NX
Cambridge
Application reference : 21/04797/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04769/FUL | Two storey side extension to create a one bedroom, a two bedroom dwelling and a detached two bedroom dwelling in the garden. | 3 Forest Road Cambridge Cambridgeshire CB1 9JA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Convert and extend existing garage to rear to provide 1no. 1bed studio dwelling.Proposed dwelling with have its own parking bay and rear garden while maintaining a rear garden for the existing dwelling (No.11) with roadside parking to the front of the existing dwelling. proposed dwelling to meet minimum standards. neighbouring approved scheme on same build line No. 1 Latimer Close.
11 Peverel Close Cambridge CB5 8RW
Cambridge
Application reference : 21/04757/OUT
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor and single storey rear extensions of existing bungalow to create 3no. flats.
538 Newmarket Road Cambridge CB5 8LL
Cambridge
Application reference : 21/04852/FUL
Created by Jean Dollimore // 1 thread
Following a fatality at this junction in August Camden Council installed a number of temporary changes to the junction in October.
This consultation concerns some more radical permanent changes
The proposals include:
Created by Steven Moseley // 1 thread
Construction of three 4-bedroom detached houses, each with an integralgarage, plus individual private driveways connecting to Marlowe Way. Retention of two TPO trees.
The busway path is currently closed south of Cambridge station - with a lorry parked on the cyclepath, a set of barriers right across the path and the bus tracks, and the driver standing there to obstruct traffic.
I
Created by Steven Moseley // 1 thread
Outline planning application with all matters reserved save for access for the demolition of all existing buildings and structures and the creation of a residential development with associated open space and infrastructure.
Created by Steven Moseley // 1 thread
Proposed 4 bedroom dwelling and garage/store
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no flats with associated works and landscaping on unused land behind The Seven Stars Public House
The Seven Stars Public House 249 Newmarket Road Cambridge CB5 8JE
Cambridge
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
Anon // 1 thread
Wandsworth Council in TMO 1644 propose removing the contra-flow segregated cycle track at the eastern end of Putney Embankment to allow a hoarding to be built around the Thames Tideway tunnel construction site. The track will be re-opened when the work is complete, but this could take at least a year. It is proposed that eastbound cyclists join the Upper Richmond road by the Dukes Head pub and then continue on this road. Wandsworth Cycling Campaign objected to this on the grounds that the Upper Richmond Road is extremely heavily trafficked and the proposed diversion involved cycling past a row pf parking bays . This would be very difficult and hazardous for the mix of cyclists using the Thames Path of which this forms part. We asked that the parking bays be temporarily removed and replaced by a 1.5 to 2 m cycle lane separated from the motor traffic by wands or similar. For west-bound cyclists using the narrow lane left on Putney Embankment past the work site, we asked for the installation of 'Do not overtake cyclists' signs.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by TMiles // 0 threads
A short section of cycle path allows cyclists to skirt around the traffic lights when turning left from Westgate into Oxford Place.
However the section ends abruptly in front of on-street car parking and the cyclist is forced to give way to other traffic in order to join Oxford Place.
It should instead lead smoothly into a cycle lane that runs the whole length of this street.
Created by Gipsy Hill // 2 threads
Introduction:
Quietway7 links a cycle route from Elephant & Castle (E&C) with Crystal Palace, and was routed by TfL to be via Dulwich Village, West Norwood (Thurlow Park Road), Gipsy Hill and then Crystal Palace (via Farquhar Road).
The route from E&C southbound is in Southwark (to Dulwich) then is in Lambeth (Turney Road, Rosendale Road/Thurlow Park Road, Hamilton Road, to Gipsy Hill), then goes back into Southwark (from Gipsy Hill to Crystal Palace). Southwark had their part of the quietway consultation approved.
Lambeth delayed their decision to June 2017, and was then subsequently “called in” as there was widespread concerns from both the local community and cycling groups for parts of the route. Cycling groups unanimously objected to the proposed design along Gipsy Hill by: Southwark Cyclists, Lambeth Cyclists and Wheels for Wellbeing. 70% of respondents objected to the the design on Gipsy Hill. Gipsy Hill is a busy Local Distributor Road and bus route. Gipsy Hill has “insufficient road width” for a segregated track. The original proposed design meant motor vehicles “will encroach on the advisory cycle lane” to allow oncoming motor vehicles to pass.
Gipsy Hill Options:
There are alterative options to avoid Gipsy Hill. Southwark Cyclists have supported the design option to follow LCN23 downhill all the way along Dulwich Wood Avenue and then using the other side of Long Meadow (so not using Gipsy Hill), with a new track behind the bus stop.
See navy dashed line on sketch attached (mauve was the proposed Q7 design, red is LCN23)
This design is quieter and safer than using Gipsy Hill, and avoids the proposed dangerous junction Gipsy Hill/ Dulwich Wood Avenue, near the rail station. This integrated design also allows greatest cycle access to local amenities, schools, shops, and parks in Dulwich, West Dulwich and West Norwood. There is interest and outline support from Southwark to explore this option.
Next Steps:
Lambeth are now actively progressing engagement and revised designs for their part of the route, with a new consultation process due in September. There is potential for an improved option at Gipsy Hill, but this is likely to need new additional funding from TfL.
Suggested, to let local Gipsy Hill Ward Cllrs (Lambeth) and College Ward Cllrs (Southwark) and local cycling groups know your views.
Background:
Lambeth proposal that was called-in, see reports:
- Quietway 7 - Elephand Castle to Crystal Palace - Decision Report – 12 June 2017
- Appendix B - Quietway 7 - details designs (Gipsy Hill pages: 23, 46-49)
http://www.cpneighbours.org/gipsyhillquietway/
Thurlow Park Ward Cllr updates:
http://thurlowparklabour.org/post/162548844962/quietways-engagement-next-steps
TfL Quietway 7 Programme (Elephant & Castle to Crystal Palace) - Proposed changes in Lambeth - West Dulwich area
https://consultations.tfl.gov.uk/cycling/lambeth-q7-wd/
LCN23 Map:
https://www.openstreetmap.org/relation/2707#map=17/51.42643/-0.08336
What are Quietway?
London Cycling Design Standards, Chapter 1 (page 15):
Quietways “..are aimed at new cyclists who want a safe, unthreatening experience.” The key principles for Quietways include:
o Routes should be on the quietest available roads consistent with directness;
o Routes should be as straight and direct as possible;
o where they have to join busier roads, or pass through busy, complicated junctions, segregation must be provided;
http://content.tfl.gov.uk/lcds-chapter1-designrequirements.pdf
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Hungate Bridge at the Navigation Road end is heavily bollarded on one end people on bikes and variants and people on foot are forced into a narrowed corridor by bollards. Yet, the width of he route is not restricted on either side.
It is unnatural and unnecessary. It brings people on bikes and variants into contact with each other and with people on foot or in wheelchairs, etc. It seems to be 'traffic-calming'. To my mind this undermines active travel messages and initiatives by making movement more complicated and fraught for all users.
Created by John Metcalf // 1 thread
"Hertfordshire County Council (HCC) has recently undertaken a feasibility report to investigate cycle links to the new Verulamium Park (Ver Park) Route link to NCN 6 from the King Harry Lane area. We have looked at ways to improve the cycling and walking environment; particularly where this would improve the continuity of cycle routes and the movement of people via active modes around your area. A section of shared use cycle route has been recently provided by the developer Linden Homes and the intention is to extend this facility to Abbey Avenue and northwards towards The Ramparts via an upgraded traffic signal crossing point into Verulamium Park.
The proposals include the following:
· Upgrade the existing traffic signal controlled crossing near Verulamium Park access to a Toucan Crossing,
· To provide improvements to the footway areas on both sides of the traffic signal controlled crossing to make it both suitable for pedestrians and cyclists, and linking into the new section of shared use footway/ cycleway that the developer has recently provided.
· To the south of the new roundabout, on the western side, the existing footway will be widened from 0.9-1.1m to 2.5m to continue the shared use route towards Abbey Avenue.
To upgrade the existing uncontrolled crossing at King Harry Lane jw Abbey Avenue by increasing the widths of the existing pedestrian refuge to widths that can accommodate both cyclists and pedestrians.
This option has been carefully evaluated and full consideration has been given to the likely effects that it may have on residents.
Please find attached a plan which shows details of the proposed scheme for Ver Park Highway Link (Cycleway/ Footway).
At this stage we are intending to implement the proposals during the next financial year, 2014/15.
As such we are now finalising the design and we are interested in hearing your views or any comments you may have regarding the proposals"
Initial comments by John Metcalf
Overall to be welcomed as better than what is there already. But, it could be improved?
1. Traffic entering Abbey Avenue is likely to be going too fast for a safe crossing for those walking or cycling. This is a rat-run to avoid the King Harry roundabouts. Therefore tighten the radii of the junction and make a raised crossing (on a hump). Do we want a Tiger (Zebra for walkers and cyclists) crossing?
2. The crossing of the new roundabout exit into King Harry Park is hazardous. It needs to be upgraded with a humped crossing (and a Tiger?). Is this sufficient or should there also be measures to slow down the traffic entering and leaving King Harry Park.
3. The best solution would be to upgrade the ROW footpath from the toucan crossing of King Harry Lane to Rowlatt Drive
Created by Jack Thurston // 1 thread
Cycle Route 46 from crosses the old stone bridge across the River Usk between Abergavenny and Llanfoist. There are good, safe and direct cycle paths on either side of the bridge, but the bridge itself is very hostile for cycling, and walking. It is on the A4143 and there is heavy often fast traffic most times of the day. The footway is very narrow and only on one side of the bridge. Although short, this is a difficult section to negotiate, especially for inexperienced or young cyclists.
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Route proposal for the link from Prospect Road/Verulamium Park to the start of the Alban Way.
The route is a shared, wide, pavement with a width around 3 metres- in line with minimum width for a shared route.
Documents are available at http://www.stalbans.gov.uk/planning/Planningpolicy/greenring/hccsiteb.aspx
Please have a look at the thread on this as there are a few point which STACC will bring out, you may want to consider these in your response.
Please return any comments to Clare Martin via phone, email or post.
Please also contact Clare if you have any further queries about the proposed works.
Clare Martin
Project Engineer, Integrated Transport Planning
Highways
Postal Point CHO317
Hertfordshire County Council, Leahoe Annexe, Pegs Lane, Hertford, SG13 8DN
t: 01992 658478 Comnet / Internal: 58478
email: Clare.Martin@hertfordshire.gov.uk
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The A4143 heading up towards the Hospital is plenty wide enough for a dedicated cycle path on one side or the other (we suggest the west side). This is often a busy and fast road. (Note this this would also solve the safe cycle access to the climbing wall and softplay.)
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by David Butler // 1 thread
Consultation of cycle lanes and junction changes by Manchester City Council