Ipswich Road roundabout
See link
-
PA 220317 GametBearingsHytheStationRoad
Demolition of Former Bearings Factory and Erection of New Building comprising 3 no. blocks over four and five storeys containing 65 no. Residential Apartments and 2 no. Commercial Units (Class E), with undercroft car parking.
-
22/00712: 2 storey building, Hills Road 6th form College, Hills Road
Construction of a new three storey educational building, including associated hard and soft landscaping.
Hills Road Sixth Form College Hills Road Cambridge Cambridgeshire CB2 8PE
Application reference: 22/00712/FUL
-
22/00655: retail unti & 3no. apartments, Burleigh Street
Demolition of Numbers 16 and 16A Burleigh Street and the construction of a three-storey building comprising a retail unit on the ground floor and 3 no. apartments on the first and second floors providing bin and cycle stores on land to the rear of the new retail unit and access to the proposed apartments will be from Burleigh Place, while the retail element will remain accessible from the front (i.e. Burleigh Street).
16 And 16A Burleigh Street Cambridge Cambridgeshire CB1 1DG
Application reference: 22/00655/FUL
-
PA 220192 220301 Chesterwell reserved matters
Needs better connection to Trinity School
-
PA 220235 220201 Ewer House
220235: Application to determine if prior approval is required for a proposed Change of Use from Commercial Businesss & Service (Use Class E) to Dwellinghouses (Use Class C3)
220201: Proposed roof conversion, including construction of new dormer windows and external fa¦ade upgrades to form 4 new apartments at Ewer House
PA_220201_44-46CrouchStRoof_01.txt, PA_220235_44-46CrouchSt_01.txt
-
PA 220247 20SirIsaacsWalk
Change of use to 2-bedroom dwelling
-
-
Barrier to trikes and trailers
this old fashioned barrier on a major cycleway needs a rethink
-
Obstruction to cycling
Kissing gate obstructs cycle route, especially for trailer and trikes
-
A1303 Little Wilbraham Road
This is a dangerous junction for people on bikes. How can it be improved?
-
[fixed] Ditton Meadows / Ditton Walk path blocked by fallen tree
The path / cut-through between Ditton Meadows and Ditton Walk (next to Ronald Rolph Court) is currently blocked by a fallen tree.
It's possible to squeeze under it with a standard bicycle if you're agile.
Looks like someone attempted to block the path with red/white tape at the southern entrance, but it's all come down of course. I didn't see any warning at the northern entrance.
There's a report on the County Council site (387287), but it's marked as 'closed' on the 21st Feb. Tree was still there on 22nd.
[later:] It was gone by 15 March (probably long before).
-
22/00293: extension to create 4 flats, 184 Thoday Street
22/00293/FUL | Two storey side, single storey rear and roof extension to create 4 flats
184 Thoday Street Cambridge CB1 3AX
Application reference: 22/00293/FUL
-
22/00583/FUL: 14no houses, Aragon Close and Sackville Close
Demolition of existing garages and hardstanding and erection of 14no houses (7 at Aragon Close and 7 at Sackville Close) together with car parking, green space, landscaping, bin and bike stores and associated infrastructure.
Land At Aragon Close And Sackville Close Cambridge Cambridgeshire
Cambridge
Application reference : 22/00583/FUL
-
22/00469/FUL: 2bed bungalow to the rear of 157 Green End Road
Erection of 2bed bungalow to the rear of 157 Green End Road
157 Green End Road Cambridge CB4 1RW
Cambridge
Application reference : 22/00469/FUL
-
19/1453/CONDA: conditions of planning permission 19/1453/FUL Shah Jalal Mosque.
Submission of details required by conditions 10 (Cycle Parking layout) and 15 (Traffic Management Plan) of planning permission 19/1453/FUL.
107 Shah Jalal Mosque Darwin Drive Cambridge Cambridgeshire CB4 3HQ
Cambridge
-
East Road/Mill Road junction not detecting cyclists
A member of the public has informed us that the signals at the junction of East Road and Mill Road are not detecting people on bikes on the lane in front of the fire station heading east on Mill Road. Has anyone else experienced this? We can get an email to the signals team.
-
PA 212680 81HalsteadRdFlats 01
Outline application to demolish existing dwelling and construct 6 No. 1 bedroom, 2 storey flats with associated works to garden and parking area
-
Queen's Crescent Area Scheme Public Consultation
Following consultation in January 2021, Camden put in a trial scheme using ETOs in May 2021.
The main features of the trial scheme were:
- a pedestrianised section in Queen’s Crescent between Basset Street and Weedington Road (south)
plus closures at QC on the side roads Allcroft Road and Weedington Road (north) - a road closure on Grafton Road outside Carlton School (just north of its intersection with Queen’s Crescent).
Camden is now proposing to make the scheme permanent but with the following changes:
- shorten the pedestrianised section of Queen’s Crescent to between Allcroft Road and Weedington Road (south)
- move the Grafton Road closure further north (just north of Crestsield Close)
These changes still ensure no rat-running on Grafton Road and on Queen’s Crescent, which is very important for cycling since C6 runs along Grafton Road and Queen’s Crescent provides a useful route to it from the western end of Prince of Wales Road (although cycling though isn’t convenient on market days).
Camden’s stated motivations for the changes in QC are
- more parking and loading opportunities, in response to issues raised by businesses.
- to improve access for motor vehicles
Other proposed additions:
- wider footways and continuous footways across several side road junctions
- new sinusoidal ramp on Grafton Road by the bend near Vicars Road.
- new seating, trees and bikehangars
- a pedestrianised section in Queen’s Crescent between Basset Street and Weedington Road (south)
-
Caxton Gibbet to Papworth Everard
Not a problem, but rather out of the blue a mile-long shared-use path is being constructed along the A1198 from Papworth Everard to Caxton Gibbet, to connect with the existing route to Cambourne and Cambridge. Did we know about this? What consultations took place?
-
PA 220150 HedgeDrive3 01
Redevelopment of site to involve the demolition of the existing garages on site, and provision of 3 no. new dwellings
-
PA 220148 CrossCottBoxted7 01
Redevelopment of site to create 7 no. new residential units
-
PA 220147 220149 220155 220153 220154 Greenstead garages
220154: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220153: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220155: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220149: Redevelopment of site to involve the demolition of the existing garages on site, and provision of 3 no. new dwellings
220147: Demolition of existing garages and redevelopment of site to provide 6 x 2 bedroom flats
-
PA 220107 48WimpoleRdHMO
The application proposes: 1. Change of use of the property from C3 to Sui Generis 2. Creation of a High Standards House in Multiple Occupation for 8no. Occupants consisting in 8no. bedrooms, 8no. en- suites, 1no. shared toilet and one communal area 3. G
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
Quietway 16 (Cycleway 51) in Westminster
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.
-
Tower Bridge road surface
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
-
Babraham P&R to Addenbrookes cycleway
Out of the A1307 Linton Greenway consultation has come a plan for the section between Addenbrooke's roundabout and the Babraham P&R, which the county/GCP are keen to move forward. There was an initial invite-only consultation event on Thur 31st Jan for local residents/residents associations to comment.
-
Bike Parking in Leopold Square, Aagrah Restaurant
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
-
Downing College now banning cycling through their grounds
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.
-
The Narrow Way proposals
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
-
Make traffic lights as St Helen's St / Rope Walk junction permenant
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
-
Cambidge University Press Site (redevelopment)
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
-
Include in 20mph
Kirk Brae and Lasswade Rd at least up to Margiotta should be included in 20mph. It's very narrow, residential, and with many shops in Lasswade Rd.
It's also steep uphills and fast overtaking makes it very dangerous for cycling.
-
Unmarked path to Richmond Park from Queen's Road
There is a useful but unmarked path from Queen's Road to Richmond Park and through to Sheen. It is used by pedestrians and cyclists & I have never seen it on any map! From Lower Grove Road, it takes you to the park via Bog Gate, or Sheen via Sheen Common.
If it were better marked on maps, better maintained & wider in places, it could form a useful section of Richmond's (paved, segregated, Dutch style?) cycling network.
-
Magdalene pinch point
Drivers ignoring the marked priority at Magdalene pinch point is a regular occurrence when faced with city bound riders. At times this can be very dangerous. Especially when large numbers of riders are forced into a very small gap between the vehicle and the bollards. I should imagine the situation is especially unpleasant travelling with small children. Also difficult to resolve with a wider cargo cycle, trailer or trike.
-
Peterborough cycling issues
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
-
Traffic Light Sensor
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
-
Missing link, West End Rd to Waterfront
As you can see in the photo there is a shared use path on river side of West End Rd just east of Bobby Robson bridge. But then where ? How far does it go ? It is certainly no good if you want to cross Princes Street- you cant unless you go up to the Burrel Road end of the bridge. And anyway once you get over Princes Street along Commercial Road and Grafton Way it is a narrow footpath which is not shared use.
It would be good to connect Bobby Robson Bridge and the Waterfront.
Directly and not by switching over to the other path and then over two toucans. Perhaps even a wide cycle crossing of the 4 lanes of Stoke St ? That would be brilliant. -
Consultation - Two way cycling on Twilley and Furmage Streets
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
-
Cycle path too narrow, road space needs reallocating
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
-
Ramped access to Victoria Bridge from riverside path
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
-
Chiltern Drive, Berry Lane Estate to Shepherd Primary School, Mill End
This proposed Berry Lane Estate to Shepherd Primary School, Mill End cycle route follows:
* Chiltern Drive.
* Part of Shepherds Lane.
* Part of the south east path through King George V Playing Fields, Mill End.
* The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area. -
Highgate Lane/A325 junction improvements
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs -
Llanfoist share-use cyclepath proposal
RAISED AT PUBLIC MEETING 10-04-2014
A key link for route 46 users, as well as people getting to/from Llanfoist village hall, is the strip of pavement on the north side of Merthyr Road. We believe there could be the width to allow this to be widened into a share-pavement allowing cyclists to avoid crossing the road twice in the space of a few hundred metres.
-
Cycle lanes stop for traffic islands through Trimley
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
-
General promotion of cycling in Cambridge
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
-
Marshall Road shared use path
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
-
Seven Sisters Road Consultation
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanesDifferent combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
-
Dangerous Junction
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.