Shilling's Yard, Parham Road, Canterbury [CA/10/01624]
Student accommodation and cycle parking.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 1 thread
Student accommodation and cycle parking.
Created by cobweb // 1 thread
They propose improving the 20mph signage in the city centre.
Created by Gregory Williams // 1 thread
Redevelopment of the Sittingbourne Mill site to include a superstore, approximately 150 new houses, and a park.
Created by cobweb // 1 thread
A dropped kerb with and footway extension to 'facilitate' cycle route.
Created by cobweb // 1 thread
A proposal to install lighting on the mid points of the footpaths on Parker's Piece.
Created by Gregory Williams // 1 thread
Proposed new cycle path beside Westwood Road. This closes a gap in the cycle path network in Thanet.
Created by cobweb // 1 thread
A proposal to light the Gough Way cycle/footpath with solar- powered, directional cats eyes. The footbridge will be upgraded soon, so this is the next step. The route is well used.
Created by cobweb // 1 thread
A proposal to put in a new cycle path on the southern side of Lammas Land. The comment next to this in the report dismisses it because of the access road. They feel the loss of green space outweighs the need for it.
Created by cobweb // 1 thread
This could be important given the traffic calming work that was approved for the section of road outside the rugby ground.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by cobweb // 1 thread
From the West/Central Area Committee agenda, a proposal to resurface the track from South Green Road to the start of the Grantchester Meadows path. They will consider whether to adopt this on 1st March.
Created by cobweb // 1 thread
In the Environmental Improvements Programme for the West Area Committee, (1st March) they are considering whether to adopt the proposal to ban right turns from Newnham Croft Street.
Created by Heather Coleman // 1 thread
A colleague asked if the gate from Downing to the Downing Site was open again, since he needed to go to Pathology. I said it wasn't, but why didn't he take the route I take, down Norwich St, Panton St, Tennis Court Road. Answer, "because I fell off my bike there, those speed humps are dangerous, and if you go slowly enough not to fall off, it's really slow".
Now I find that worrying. I go my way to avoid the awful traffic jams at the junction by the Catholic Church. I think most people would consider it a safer route. But if some cyclists are being put off going that way, and instead taking the zoo that is Regent St in preference, well, I don't think the traffic calming is doing the job intended.
Too late to fix this here, but we must make it a priority that any future traffic calming in the city or South Cambs doesn't inadvertently act as an anti-cyclist measure and force cyclists onto the much busier main roads which I'm sure everyone would prefer them not to use if there's a better a and quicker route. But if the traffic calming, that was presumably done, in part, to improve cycle safety, has failed, this is a waste of money. The speed humps on Bateman St, unless you do a slalom, you have to cycle over and the ones on Norwich St are viscious. I've just got good at taking them at speed as I've had plenty of practice.
Created by Robin Heydon // 15 threads
New station that will serve the northern part of Cambridge, specifically the Science Park - but also by extension through the guided bus, villages to Northstowe.
This provides a good opportunity to construct another section of the Chisholm Trail (especially a link over the river and on to Newmarket Road). We must also ensure that any footbridge provides facilities for those with bikes AND that there is adequate cycle parking.
The Times is running a campaign for cycle safety.
How can we best capitalise on this in Cambridge?
Created by Gregory Williams // 1 thread
Speed limit reduction from National Speed Limit to 30mph on this narrow section of road which forms part of National Cycle Route 1.
Created by Gregory Williams // 1 thread
Phase 2 of the River Dour Greenway will connect the existing portion of the River Dour Greenway cycle route with National Cycle Routes 1 and 2 on Dover's seafront. It'll also connect to Regional Cycle Route 17.
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Gregory Williams // 1 thread
This proposed cycle path will remove the need to climb a hill when following the Great Stour Way to reach Canterbury city centre. It'll also increase the proportion of traffic-free path used for the route and remove some areas of potential conflict with other road users due to parked cars.
Created by Gregory Williams // 1 thread
Completion of this section of the riverside cycle path will allow students to cycle virtually traffic free from the Parham Road Student Village into Canterbury city centre. Making this route cycleable will allow the existing and proposed developments at the Parham Road Student Village to fulfil their car-free objectives.
Martin Lucas-Smith // 1 thread
The pedestrian crossing joining the pavements here are frequently blocked by parked cars.
Martin Lucas-Smith // 1 thread
This development (a clear case of squeezing a quart into a pint-pot) has no cycle parking.
Martin Lucas-Smith // 1 thread
This attractive, car-free development - heavily used as a cycling and walking route - has gradually turned into an ugly car park in recent months following the temporary removal of enforcement. The County Council are proposing partial re-regulation of parking.
Created by Heather Coleman // 0 threads
An article in today's Cambridge News about the new shops in Orchard Park isn't encouraging reading.
Link to article is
http://www.cambridge-news.co.uk/Home/Build-us-some-more-shops-or-well-all-get-in-our-cars-17022012.htm
The headline says it all. They are proposing shops that will probably only act as "corner shops" so people will all drive along the A14 or Kings Hedges Road to Milton Tesco.
This seems on the face of it, to add to the general anti-cycling design that Orchard Park has had since the first bulldozers went into action. I don't know what others think, or what can be done about it. Presumably a too large supermarket isn't wanted there, as then it would become a magnet for people outside of Orchard Park to drive to, unless, but this is not a suggestion that is possible, it had virtually no car parking, just for the disabled, but lots of bike parking, and good smooth pedestrian paths to all the houses.
A 20mph limit in residential areas of Cambridge would vastly improve safety and enable more people to cycle. What extent should it cover and how can we achieve it?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Created by Richenda // 1 thread
Apparently TfL commissioned "...to explore the opportunity of a pedestrian river crossing ....". They may not think bikes should also be included, but they should!
http://www.telegraph.co.uk/luxury/travel/4162/a-garden-bridge-across-the-thames.html
http://www.gardenbridgetrust.org/index.html
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
Created by HVS // 3 threads
The A5117 at this point has some sections of non-protected cycle lane, but they are not continuous, and they disappear at a number of pinch points. The road carries a lot of very fast moving heavy traffic, and is dangerous and unpleasant to cycle on. It would be a useful route for people travelling by bike to or from Stanlow Refinery, Cheshire Oaks, the University of Chester at Thornton Science Park, and Ince & Elton villages, but is currently only used by a tiny number of very brave and confident cyclists. This situation could be improved by making the cycle lane continuous along the whole route.
Created by Andrew Woodward // 0 threads
Pinch-point at zebra crossing where cyclists are forced to share space with traffic that is often speeding. Cars try to squeeze past cyclists or brake suddenly.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Frenchie // 0 threads
This is one of the prime candidate for a cycle contraflow in Newcastle City Centre. Currently one way for all traffic from Percy Street to Strawberry place. Allowing cyclists down from Strawberry Place to Percy Street would improve permeability and connectivity for cyclists. Note: not a lot of traffic, space not an issue, short uphill section so speeding not an issue.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Ned Harrison // 1 thread
Holywells Park has a section of cycle route 51 running through it, linking South East Ipswich to the centre with a pleasant and safe route down to the waterfront.
During Winter, the park is closed at dusk, sometimes as early as 4, meaning that just when the roads are most dangerous (dark and wet) cyclists are forced onto steep and busy routes either along Cliff Lane or up Bishops Hill.
The closures are largely at the request of the Park Friends group. I've spoken to them, and their concerns seem to be largely about what might go on after dark. It's not clear that there is any evidence for this, nor that the current situation of locking the main gates but leaving others would do anything to deter misbehaviour.
Keeping it open as a cycle route would ensure a legitimate presence in the park, and help provide less confident cyclists in the area with a safe route to and from town.
I'd propose either locking later, or for a trial period leaving the park unlocked.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.