Westwood Road cycle path extension
Proposed new cycle path beside Westwood Road. This closes a gap in the cycle path network in Thanet.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 1 thread
Proposed new cycle path beside Westwood Road. This closes a gap in the cycle path network in Thanet.
Created by cobweb // 1 thread
A proposal to light the Gough Way cycle/footpath with solar- powered, directional cats eyes. The footbridge will be upgraded soon, so this is the next step. The route is well used.
Created by cobweb // 1 thread
A proposal to put in a new cycle path on the southern side of Lammas Land. The comment next to this in the report dismisses it because of the access road. They feel the loss of green space outweighs the need for it.
Created by cobweb // 1 thread
This could be important given the traffic calming work that was approved for the section of road outside the rugby ground.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by cobweb // 1 thread
From the West/Central Area Committee agenda, a proposal to resurface the track from South Green Road to the start of the Grantchester Meadows path. They will consider whether to adopt this on 1st March.
Created by cobweb // 1 thread
In the Environmental Improvements Programme for the West Area Committee, (1st March) they are considering whether to adopt the proposal to ban right turns from Newnham Croft Street.
Created by Heather Coleman // 1 thread
A colleague asked if the gate from Downing to the Downing Site was open again, since he needed to go to Pathology. I said it wasn't, but why didn't he take the route I take, down Norwich St, Panton St, Tennis Court Road. Answer, "because I fell off my bike there, those speed humps are dangerous, and if you go slowly enough not to fall off, it's really slow".
Now I find that worrying. I go my way to avoid the awful traffic jams at the junction by the Catholic Church. I think most people would consider it a safer route. But if some cyclists are being put off going that way, and instead taking the zoo that is Regent St in preference, well, I don't think the traffic calming is doing the job intended.
Too late to fix this here, but we must make it a priority that any future traffic calming in the city or South Cambs doesn't inadvertently act as an anti-cyclist measure and force cyclists onto the much busier main roads which I'm sure everyone would prefer them not to use if there's a better a and quicker route. But if the traffic calming, that was presumably done, in part, to improve cycle safety, has failed, this is a waste of money. The speed humps on Bateman St, unless you do a slalom, you have to cycle over and the ones on Norwich St are viscious. I've just got good at taking them at speed as I've had plenty of practice.
Created by Robin Heydon // 15 threads
New station that will serve the northern part of Cambridge, specifically the Science Park - but also by extension through the guided bus, villages to Northstowe.
This provides a good opportunity to construct another section of the Chisholm Trail (especially a link over the river and on to Newmarket Road). We must also ensure that any footbridge provides facilities for those with bikes AND that there is adequate cycle parking.
The Times is running a campaign for cycle safety.
How can we best capitalise on this in Cambridge?
Created by Gregory Williams // 1 thread
Speed limit reduction from National Speed Limit to 30mph on this narrow section of road which forms part of National Cycle Route 1.
Created by Gregory Williams // 1 thread
Phase 2 of the River Dour Greenway will connect the existing portion of the River Dour Greenway cycle route with National Cycle Routes 1 and 2 on Dover's seafront. It'll also connect to Regional Cycle Route 17.
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Gregory Williams // 1 thread
This proposed cycle path will remove the need to climb a hill when following the Great Stour Way to reach Canterbury city centre. It'll also increase the proportion of traffic-free path used for the route and remove some areas of potential conflict with other road users due to parked cars.
Created by Gregory Williams // 1 thread
Completion of this section of the riverside cycle path will allow students to cycle virtually traffic free from the Parham Road Student Village into Canterbury city centre. Making this route cycleable will allow the existing and proposed developments at the Parham Road Student Village to fulfil their car-free objectives.
Martin Lucas-Smith // 1 thread
The pedestrian crossing joining the pavements here are frequently blocked by parked cars.
Martin Lucas-Smith // 1 thread
This development (a clear case of squeezing a quart into a pint-pot) has no cycle parking.
Martin Lucas-Smith // 1 thread
This attractive, car-free development - heavily used as a cycling and walking route - has gradually turned into an ugly car park in recent months following the temporary removal of enforcement. The County Council are proposing partial re-regulation of parking.
Created by Heather Coleman // 0 threads
An article in today's Cambridge News about the new shops in Orchard Park isn't encouraging reading.
Link to article is
http://www.cambridge-news.co.uk/Home/Build-us-some-more-shops-or-well-all-get-in-our-cars-17022012.htm
The headline says it all. They are proposing shops that will probably only act as "corner shops" so people will all drive along the A14 or Kings Hedges Road to Milton Tesco.
This seems on the face of it, to add to the general anti-cycling design that Orchard Park has had since the first bulldozers went into action. I don't know what others think, or what can be done about it. Presumably a too large supermarket isn't wanted there, as then it would become a magnet for people outside of Orchard Park to drive to, unless, but this is not a suggestion that is possible, it had virtually no car parking, just for the disabled, but lots of bike parking, and good smooth pedestrian paths to all the houses.
A 20mph limit in residential areas of Cambridge would vastly improve safety and enable more people to cycle. What extent should it cover and how can we achieve it?
Martin Lucas-Smith // 2 threads
Planning application here which may be of interest.
Martin Lucas-Smith // 21 threads
The Local Plan is being reviewed - which will be a big process over the coming two years. It's important that cyclists engage with this and ensure that deficiencies, such as lack of cycle parking, are fixed.
Martin Lucas-Smith // 1 thread
There was a Sainbury's lorry delivering to the front of the St Andrew's Street store today despite signs saying there is no loading at any time on posts nearby. Sadly I didn't have camera. So my question is 1) Are they allowed to do this? and 2) if not, should we make a fuss (assuming it's a regular occurrence?)
[Originally submitted by another user, just transferring this to be a full issue so it has a location]
Created by Robin Heydon // 2 threads
The busway is not lit at night, which is unsafe and hard to navigate.
Martin Lucas-Smith // 2 threads
A new school at Cambourne is proposed here. Obviously we want to encourage children to cycle to it, but the conditions need to be right.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by FrenchyF // 0 threads
The bike lane here starts too close to the junction - drivers hug the kerb before the cycle lane starts, and this makes the lane useless.
Created by jpennycook // 1 thread
Owners of Brighton Hill Retail park are preparing a planning application for improvements including a coffee shop in the carpark. this is our opportunity to ask for secure cycle parking for the public and employees.
Created by mikewg // 1 thread
Numerous people responding to the survey experience safety issues with this location. Some comments here:
Town centre around the monument, the cobbles are a night mare and shake you badly, I have had my bike lights shaken off before, and had to save them from being run over. You cannot cycle quickly over the cobbles.
Taunton Town Centre - cobbles & volume of traffic
I go through the centre of town. I have had a couple of accidents on the cobbled surface outside the market house over the years of cycling this route. Both resulted in injuries including concussion, facial injuries requiring stitching, a shoulder and hip injury which required physio and steroid injections to resolve. The second of these happened on a wet day, when I was forced to brake because a bus driver, having seen me coming, decided to pull out in front of me. He was relatively remorseful, but it was an accident that would not have happened if 1, he hadn't taken the decision that a cyclist didn't matter, and 2, the road surface was smoother as the braking action unsteadied me on a rough surface - the fall was inevitable as soon as I touched the brakes really. As a consequence, I now cycle along the back of the market house as I cannot bring myself to cycle across the cobbled road surface.
Cobblestones around parade
High Street; ridiculous cobbled roundabout making town centre very dangerous
Cobbles in front of Market Hall
Cobble stones on roundabout in centre of town feels unsafe and dangerous for cyclists.
COBBLES on the main parade
cobbles in town centre
'cobbles ' Market house - dangerous surface - traffic in a hurry .
Cobbles at Market House roundabout,
Cobbles around Burma Memorial make it impossible to take hand off handlebars to signal and are treacherous at best of times
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Al Storer // 2 threads
Proposed building will have 3000 employees, 250 car parkign spaces and 900 bike parking spaces
Created by Andrea Bredel // 1 thread
this is one of many cycle lanes here in Ipswich that go on and off the road several times. This is very awkward for cyclists as they need to be very careful when getting back onto the road and most probably confuses drivers as well.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A radical idea maybe, but why not close the narrow, one-way, Lower Castle Street to cars and make it two-way for bikes and pedestrians? It would
1) solve the problem of the confusing junction at the bottom end.
2) remove the very complex routing of routes 42&46
3) avoid cyclists cutting though the pedestrian zone and one-way part of cross street when travelling east across town.
Bus/cycle lane lights not sensing cyclists.
Created by John Ackers // 1 thread
Islington Council wants to 'transform Clerkenwell Green into a high-quality public space. To do this we plan to provide more space for people to meet and gather by reducing road space and removing parking'.
Created by Chris Lord // 1 thread
Currently there is no safe cycle route between South Loughton / West Debden and Chigwell School. This safer off-road route could be popular with school children and their parents. At Highwood Lane end the route could connect with Debden via Oakwood Hill and Loughton (Traps Hill) via Alderton Hall Lane north.
* Approx. 1 mile length part on-road and part off-road scheme from London Square (Chigwell) via Grange Farm Lane.
* Section 1: Approx. 1 mile length part on- road (via provision of signage and road markings) and part off-road scheme (a new unlit 3m wide shared cycle route facility) from London Square (Chigwell) via Grange Farm Lane, crossing the River Roding via an existing bridge and on to Highwood Lane.
* Section 2: Provision of an on-road cycling route in both directions along Oakwood Hill, made possible through parking restrictions and removal of the central hatching/wide centrelines.
* Section 3: Provision of an on-road cycling route in both directions along Alderton Hall Lane and Traps Hill, via signage and road markings, and parking restrictions/formalisation where required.
Medium Term
£500,000 (Assumes route is not a PROW and excludes stats diversions)
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by Peter Loader // 0 threads
This proposed Maple Cross to Shepherd Primary School cycle route follows the existing Maple Cross to Rickmansworth route as far as the Long Lane/Eastwick Crescent junction in Mill End.
The new part of the route consists of:
* Part of the new Long Lane residential service road.
* Part of Kenwood Drive.
* Part of the old Long Lane road.
* Rickmansworth Footpath 012 (upgraded to a bridleway).
* Beresford Road.
* Part of Penn Road.
* Part of the south east path through King George V Playing Fields, Mill End.
* The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area.
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.