Delivery vehicles obstructing cycle routes
Delivery vehicles in Cambridge frequently obstruct cycle routes. I suggest we use this issue to keep track of the offenders (companies and locations) with separate threads for each location.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Monica Frisch // 4 threads
Delivery vehicles in Cambridge frequently obstruct cycle routes. I suggest we use this issue to keep track of the offenders (companies and locations) with separate threads for each location.
Created by JonathanF // 1 thread
Place-holder for Corridor Cycleway Section 7 discussions
Created by David Earl // 1 thread
Planning application in this week's list for rebuilding the derelict shops on the south-west corner of the Perne Road roundabout (these have their own layby off the roundabout.
Created by Eric Booth // 0 threads
Cycle path is broken up by cars coming off the dual carriageway into the hotel (before a barrier). So a cyclist not only has to stop, but then turn around and look behind them for cars careening off the dual carriageway into the hotel.
Raised on CTC Infrastructure map http://www.ctc.org.uk/campaign/space-for-cycling/cycling-infrastructure/filton-holiday-express-inn
Approaching from the South, there is cycle only access across Handford Road to continue North along Portman Road (shown in the photo) which allows access, amongst other things, to the new crossing of Norwich Road at Barrack Corner.
However, the lights allow motor traffic to turn left or right (not straight on) on a green signal which creates significant risk of conflict and left-hooks for cycles going straight on.
Unless cyclists take a strong position at the junction in the centre of the lane there is a risk of left-hooks from cars turning left.
This is made worse by the fact that there is a marked cycle lane and ASL which tends to encourage cyclists into a dangerous position at the left hand side of the road.
It is possible to avoid this by leaving Portman Road and using the Toucan crossing to cross Handford Road, but this isn't mandatory for cycles and the "No Entry except Cycles" signage suggests that using the on-road route is the most obvious option.
This issue could be partially resolved by an advance "cycle only" filter phase on the traffic lights, but other than that I can't see any more effective solution than a sign which makes it clear how the road layout works (i.e. that cars may turn left or right, but that cycles may be proceeding straight on).
Created by charlie_lcc // 10 threads
A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
Created by charlie_lcc // 5 threads
The London Cycle Safety Action Plan 2 (CSAP2) draft is out for consultation. Deadline 25th July 2014
https://consultations.tfl.gov.uk/cycling/draft-safety-action-plan
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Richard Moss // 1 thread
The Over to Longstanton road is to be closed from 30 June 2014 for 9 weeks for reconstruction of Gravel Bridge.
Created by Paul L // 3 threads
Richmond Council say
"a signalised PUFFIN crossing with pedestrian countdown outside number 182 Kew Road (previously outside 180) Footway widening both sides of Kew Road. We have attempted to minimise the impact on the cycle lanes by introducing long tapers and following existing extended footways where possible. The kerb widening is essential to ensure sightlines to the signal heads past the many street trees."
We suggested cranked supports for the signals to avoid the loss of cycle lanes but they claim TFL disapproval.
Created by timlennon // 1 thread
Text of message from TfL:
All,
We are proposing to convert the current dual PUFFIN crossing at the above location to a dual TOUCAN crossing, formalising the facility for cyclists.
The initial design is attached, which includes localised resurfacing of footways and some carriageway works. A lighting assessment has also been undertaken which recommends a full lantern replacement of the columns retaining all lighting columns once structural testing has been completed and passed.
We also propose to extend the shared use footway further north on Marksbury Avenue and further south on Manor Grove to enable safer entry/exits for cyclists to the TOUCAN crossing.
The impact (if any) is currently being determined by Traffic Signals.
If you have any comments or suggestions, please let me have these by cop Friday 27th June.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by David Earl // 1 thread
The DfT have written to us with a proposed TRO to replace the sliproad from westbound A14 at Girton to southbound M11. This is also part of the widening scheme between Histon and Girton, but this aspect requires an order to give the lane motorway status. The main effect seems to be to lengthen the A14 part of the slip road to reduce queues on the main A14.
I don't think anything particular needs doing with this, so I don't plan to scan the correspondence, but if anyone wants if, please ask.
Preferred route to be signed as an alternative to Chilwell High Road agreed between City, Broxtowe and County Councils.
Created by MJR // 2 threads
Some of (the last of?) the s106 money from two out-of-town big box supermarkets is being used to remodel the connections between the bus and rail stations. National Route 1 runs through this area and the bus station may also be Lynn's biggest cycle park, so there's quite a lot of potential for this to do good - or to do harm.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Area Committees are a joint meeting attended by both city and county councillors. They decide on planning issues in the area, but also have a role in the allocation of community development money from S106 contributions. They offer an opportunity to engage with multiple councillors at once, through the Open Forum section and speaking on specific Agenda items. The East Area's website is here: https://www.cambridge.gov.uk/west-central-area-committee
Speaking at these meetings is a good way of making your feelings on matters the councils control public
As discussed between local cycling organisations there is a desperate need for a signed route which avoids Chilwell High Road where there have been a number of accidents now tram tracks are laid in places. This route also avoids Beeston High St which is a lengthy dismount section from 9-5. This route supersedes the previous northerly route. A southern avoiding route has also been plotted on cyclescape
Created by Jean Dollimore // 1 thread
The proposals seek to improve road safety on the streets surrounding Regents High school in Somers Town which is being rebuilt. This school is labelled "South Camden Community School" on the map.
The consultation is on Camden's website at:
Currently the school is accessed from Charrington Street but the new building is going to face the other way and will be accessed via Chalton Street. Therefore most of the proposal are related to making a new school entrance and building out the footways in Chalton Street while taking them away in Charrington Street. All of this is clearly necessary, but doesn't appear to add to road safety.
The council also proposes a new speed table at the junction of Chalton Street and Aldenham Street. This would help with road safety.
Cyclists are already concerned with the rat-running on Ossulston Street; this quite likely accesses Eversholt Street via Chalton Street. Surely we should ask for this rat running to be prevented both for the safety of the cycle route and for children going to Regents High School?
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Anon // 0 threads
There is currently no secure locks provided at Port Rodie bus stop, the main departure stop for buses eastwards towards Dumfries and Carlisle.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Peter Loader // 0 threads
Transport Initiatives LLP is an independent transport planning consultancy. They have carried out an audit for Three Rivers District Council classifying roads, paths and crossings in terms of the UK National Cycle Training Standard (Bikeability) Level needed to be able to ride in comparative safety. The results can be seen on Three Rivers District Council's web site.
Transport Initiatives have classified the roundabout at M25 Junction 17, the adjacent Maple Cross Roundabout, and the dual carriageway between them as Level 3.5, i.e. "Roads & crossings with a very high level of risk, unsuitable for even highly experienced cyclists".
For detailed documentation, please see
http://www.threerivers.gov.uk/Default.aspx/Web/CyclingInformation
and download
Maps by area|Maple Cross
plus
Cycling safety audit|CSNA Leaflet
Following closely the route of an old railway line between Colchester and Brightlingsea this proposed route would link Colchester to Walton-on-the-Naze. It provides a much needed commuter route out of Brightlingsea linking it safely to Wivenhoe, the University of Essex and Colchester and creates a new leisure route in a holiday district. It builds on the existing four mile NCN51 route from Colchester to Wivenhoe by adding 5 miles off-road to Brightlingsea via a new river crossing at Alresford Creek. From there it utilises an existing pleasant frequent summer ferry crossing to Point Clear and creates a 25 mile coastal route much of it off-road.
Created by Gary // 0 threads
To improve safety after numerous fatal car accidents the Highways Agency are currently implementing speed restrictions but are also designing a new roundabout for the A120 near Pellens Corner/Horsley Cross. NCN51 passes nearby. Cyclists don't generally want to cycle the A120 but we do have to cross it to get across Tendring District. Roundabouts are particular hard for cyclists to use on A roads. So will the Highways Agency proposal include the needs of cyclists? http://www.highways.gov.uk/roads/road-projects/A120-Pellens-Corner-Average-Speed-CamerasSafety-Improvements
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.