Greater Anglia Cycle Strategy
Greater Anglia has just issued a consultation on cycles at stations and on trains
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by Al Storer // 4 threads
A citywide (and indeed beyond) problem is poor consideration given to the needs of cyclists and pedestrians during road works- eg "cylist dismount" sign use
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by aSemy // 0 threads
https://www.citizenspace.com/bristol/city-development/baldwin-street-cycle-safety-fund-scheme
Overview
The purpose of this scheme is to address the large number of crashes involving cycles on Baldwin St, at the junction with Queen Charlotte Street.
We propose extending the existing cycle track at Welsh Back and take it across the junction via a humped crossing. We have introduced a ‘floating bus stop’ to separate buses and cyclists. There will be a formal crossing point for pedestrians to access the stop from the footway.
A small number of parking places would be removed but loading, bus and taxi facilities are retained, although altered.
Created by Shaun McDonald // 0 threads
The legal pavement cycling is suddenly not allowed 3 car lengths before a cycle shop near this junction which has toucan crossings and cycle paths on all other sides of it. Why can't it be continued to the bike shop for a safe cycle route to/from the junction away from traffic?
Created by Shaun McDonald // 0 threads
The cycle cut through between Appold St and Worship St is often blocked by pedestrians or Taxis dropping off passengers. It's also too narrow, thus can only be used one way, and isn't suitable for higher levels of two way cycling.
Created by Jean Dollimore // 5 threads
Camden Council proposes major improvements to Cobden junction – the junction of Camden High Street with Crowndale Road and Hampstead Road at its southern end.
They propose the following measures:
- eliminate the unnecessary northbound road on the east side of the island
- gain extra footway space on the east side of the road (uses to include cycle parking, trees, seating)
- widen the footway outside Mornington Crescent Station
- safer, quicker and simpler pedestrian crossings
- improved link for cyclists to the Mornington Crescent quiet route (from Arlington Road).
- new ASL boxes with lead-in lanes on the approach to the junction from Eversholt Street, Crowndale Road and Hampstead Road.
- re-site the statue of Richard Cobden and the war memorial
Proposal for contraflow cycling on Crowndale Road:
A few months ago, we were shown designs for a contraflow on Crowndale Road between Hampstead Road and Bayham Street with some junction changes at the latter to accommodate it. Unfortunately, this was rejected by TfL on the grounds that it would delay buses. This consultation notes that the layout has been designed to accommodate the contraflow at a future date.
This consultation also says that in addition, alternative options for providing a west to east link are being explored at both Delancey Street / Pratt Street and Oakley Square. We need to encourage Camden to pursue these essential links. In the case of the latter, there is an urgent need to allow cyclists to make right turn right into Hampstead road from the southern end of Mornington Crescent.
See consultation on Camden Council website:
https://consultations.wearecamden.org/culture-environment/cobdenjunction
Created by Aidan Van de Weyer // 0 threads
The Hills Road / Regent Street axis of the Catholic Church junction was resurfaced overnight (28-29 August) as part of the junction upgrade.
Many of the damaged iron works (manhole covers, etc) have not been changed. Some are in a bad state and quite dangerous because they have worn smooth, sunk or tilted.
I have contacted the Traffic Signals team at CCC, as they seem to be responsible for the works, and they should be getting back to me.
If anyone else fancies having a go at finding out what is going on and whether anything can now be done, it would be very welcome.
Created by George Coulouris // 1 thread
For discussions on the design of the new website, following the CCC Committee decision to initiate the construction of a new CCC website.
A working party has been set up, consisting initially of George, Jean, Ben and Geoff.
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by Ben Edmonds // 1 thread
Redesign of street to include two-way for cyclists, one-way for motorists, light segregation and bus stop islands.
Martin Lucas-Smith // 1 thread
Changes to car parking in the Kite are proposed.
Cycle parking is not being included.
Created by Dan Doherty // 0 threads
Very narrow cycle lane between University Road and Violet Road and Broadlands Road. Encourages very close passes when cycling in the lane (with 10cm of your handlebars), or aggressive impatient driving if you cycle outside of the lane. Additionally to cycle within this cycle lane it is necessary to cycle closer to the kerb than the recommended 50cm from kerb (http://www.cyclescheme.co.uk/community/how-to/road-positioning)
Lane markings are extremely faded. Lane contains several drains.
No cycle lane would be better than the current cycle lane.
Created by Shaun McDonald // 0 threads
The railings here probably should be removed. They promote faster motor vehicle driving, as drivers think it's safer as nothing will walk out in front of them.
Created by Robin Heydon // 1 thread
Planning application for flats near the Busway Cycleway
Created by Martinn // 0 threads
There is a set of bollard which have been placed that prevent cycling as a family, in order to reduce car journeys. Negotiation without manhandling the Bike and dismounting is impossible when riding a Tandem, and requires even more effort when a Tag -along is connected. Can these obstructions be removed please
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Broken headlight glass from a couple cars has been there since 8th August
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by Shaun McDonald // 1 thread
Would it be possible to make the full length of Marchmont Street two way for cycling? The northern half doesn't seem to be now.
Created by Shaun McDonald // 0 threads
It's horrible to cycle along Old Street due to the number of cars/taxis/minicabs parked in the cycle lane. I usually find this a lot worse in the evening.
Created by Shaun McDonald // 0 threads
The toucan crossing for cyclists avoiding Old Street Junction are very slow to change for pedestrians and cyclists. Often people get fed up waiting and then dart across in a gap. Or once there is a gap, it takes until cars start appearing before they change.
If TfL is seriously interested in encouraging walking and cycling they need to change the timing of these lights so that they don't take forever to change.
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by WilliamNB // 1 thread
On Royal Parade, when traveling in an easterly direction, shortly before the pedestrian lights by the Theatre Royal there is a poorly repaired trench across the road.
In lane 2, the surface is reasonable, but in lane 1 the tar has shifted to create a severe and unmarked speed hump. This is dangerous to cyclists.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821