Grey Street
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
See: https://consultations.tfl.gov.uk/streets/kingscross
Deadline: 24 March 2014
Note: the most significant place in this proposal is the Gray's Inn Road/York Way route, where Deep Lee was killed in 2011.
Drop-in sessions: 4 and 11 March 2014
Time: 16:30 – 19:00
Venue: King’s Cross Neighbourhood Centre, 51 Argyle Street
CCC were consulted in advance and do not like the proposals. Our main objections are that these proposals:
1. fail to meet TfL’s own 2005 Cycle Design Standards, on many points,
2. put cyclists on the pavement at an extremely pedestrian-busy junction,
3. fail to narrow the traffic heading into York Way down to one lane early enough. It narrows, already, to one lane once it reaches the bus stops in York Way, so it is perverse not to narrow it before the junction, thus freeing up space for a cycle lane to take cyclists safely through the junction.
We have other more detailed objections which we will post later.
Created by litwardle // 0 threads
The most frustrating part of the journey is when I get to the square. To get to Castle Street you either have to cycle under the bridge. This underpass is far to narrow and has blind entry..It makes a heart racing cycle when someone comes in the opposite direction narrowly avoiding collision! The surface is also very slippery in the wet. The only way to avoid this is by continuing to the T junction at the square and turning left... Ooops No left turn!! Of course, even if you could there is no way to get to castle street without going over the bridge and doubling back! Any improvement here would make a huge difference!
The most frustrating part of the journey is when I get to the square. To get to Castle Street you either have to cycle under the bridge. This underpass is far to narrow and has blind entry..It makes a heart racing cycle when someone comes in the opposite direction narrowly avoiding collision! The surface is also very slippery in the wet. The only way to avoid this is by continuing to the T junction at the square and turning left... Ooops No left turn!! Of course, even if you could there is no way to get to castle street without going over the bridge and doubling back! Any improvement here would make a huge difference!
Created by User 609 (deleted) // 1 thread
It is likely a cycle route will run south from Packington St. I was just thinking how it could be continued north/west crossing Essex Rd, down Gaskin St, crossing Upper St and into Theberton St. At the moment, the main roads get quite busy and present a barrier to cycling.
Assuming Gaskin St can be made two way, I was wandering what the best design would be to make the links on Essex Rd and Upper St safest for cyclists (bearing in mind this would ideally be a quiet route).
Are there best practice examples of similar situations elsewhere?
Thanks
Tom
Created by Shaun McDonald // 2 threads
From 17 February to Wednesday 5 March 2014, Suffolk County Council is seeking your views on proposals for the Nacton Road and Ransomes Way corridor in Ipswich.
A number of major developments have recently been completed in this area, with further development expected in the period leading up to 2026.
Residents and business owners living or working alongside roads that may be affected have been written to individually.
The county council appointed AECOM to carry out a study to identify and assess potential improvement schemes to meet the projected increase in traffic associated with development in this corridor.
The primary objective of the study was to maintain traffic capacity on these key routes whilst also providing enhanced facilities for pedestrians and cyclists and taking the needs of public transport services into account.
An exhibition of proposals will be held at Gainsborough Library in Clapgate Lane (IP3 ORL). Comment cards will be available at the venue to fill out. Alternatively comments can be emailed to Suffolk.LTP@suffolk.gov.uk.
View the study display board information here (PDF, 2.7Mb)
There is also an opportunity to request a comment card and hard copy version of the proposals by calling 01473 265923.
The county council would like to know what you think about the proposals.
Responses must be received no later than Wednesday 5 March 2014.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Remove council's paid car parking (not well used anyhow) whilst retaining residents car parking on the east side, turn car parking space into two-way cycleway. The road might be turned into a one-way, or better still 'residents only' street
Created by Katja Leyendecker // 0 threads
Space for cycling, two-way cycleway, kerb protected
Set aside space for cycling, and protect it by using a kerb. The road is busy as fast, and cycling requires dedicated space.
Necking-down for slower turning speeds and better pedestrian desire lines, clear marking of cycle ways, zebra crossing giving pedestrians priority over turning traffic
New junction into new housing development has cycle path combined with wide pavement, however the nearest drop kerb is 10m up the street into the development for vehicle access and after the pavement has been narrowed. This means the cycle lane is inconvenient for cycles to use and will push them onto the road. It is also inconvenient for other users such as wheelchair and prams especially as is inclined after junction.
Created by Rona471 // 1 thread
HertsCC proposal to create a junction speed table and zebra crossing at the junction of Avenue Road and Lemsford Road. The proposed zebra crossing will be north of the junction. The proposal is part of the Maple School Safer Routes to School project.
This junction is on the route of the Green Ring, where it crosses the railway using the bridge from Jennings Road.
The Avenue Road - Jennings Road link is used by many pedestrians and cyclists going to and from: St Peters Street / Carlisle Avenue (ie NCN6); Morrisons & the Alban Way (ie Green Ring); Verulam School (secondary); High School for Girls (secondary) and Maple School (primary). For cycling the route is great for avoiding Sandpit Lane.
The desire for cycling is that the raised table will provide easier access to the link and make the junction safer for cycling.
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Repaint cycle logos on St Peter's street as they are becoming worn.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Created by Kate // 1 thread
In order to avoid the muddy and sometimes flooded route along the riverside path it is possible to use a tarmac path across Petersham Field. However, at both ends of the field there are kissing gates which mean that larger bikes, bikes with child seats, cargo bikes, double buggies or larger prams as well as wheelchairs are either unable or struggle to get through the gate. The gates create an unappealing obstruction for "normal" bikes too.
I have been told by councillors and council officials that the gates are to keep in the cows which graze for half the year in the field. In Cambridge all the cows grazing on common land are kept in using cattle grids. Why can't this solution be used here?
Created by Andrew Woodward // 1 thread
RCC have requested up to 28 additional cycle parking stands in the vicinity of Kew Gardens station.
Created by HankChief // 0 threads
No dropped kerb to give easy access to/from the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to give easy access to/from the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to give easy access to/from the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to give easy access to/from the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to give easy access to/from the East Craigs Path Network.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.