LCDS draft
A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by charlie_lcc // 10 threads
A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
Created by charlie_lcc // 5 threads
The London Cycle Safety Action Plan 2 (CSAP2) draft is out for consultation. Deadline 25th July 2014
https://consultations.tfl.gov.uk/cycling/draft-safety-action-plan
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Richard Moss // 1 thread
The Over to Longstanton road is to be closed from 30 June 2014 for 9 weeks for reconstruction of Gravel Bridge.
Created by Paul L // 3 threads
Richmond Council say
"a signalised PUFFIN crossing with pedestrian countdown outside number 182 Kew Road (previously outside 180) Footway widening both sides of Kew Road. We have attempted to minimise the impact on the cycle lanes by introducing long tapers and following existing extended footways where possible. The kerb widening is essential to ensure sightlines to the signal heads past the many street trees."
We suggested cranked supports for the signals to avoid the loss of cycle lanes but they claim TFL disapproval.
Created by timlennon // 1 thread
Text of message from TfL:
All,
We are proposing to convert the current dual PUFFIN crossing at the above location to a dual TOUCAN crossing, formalising the facility for cyclists.
The initial design is attached, which includes localised resurfacing of footways and some carriageway works. A lighting assessment has also been undertaken which recommends a full lantern replacement of the columns retaining all lighting columns once structural testing has been completed and passed.
We also propose to extend the shared use footway further north on Marksbury Avenue and further south on Manor Grove to enable safer entry/exits for cyclists to the TOUCAN crossing.
The impact (if any) is currently being determined by Traffic Signals.
If you have any comments or suggestions, please let me have these by cop Friday 27th June.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by David Earl // 1 thread
The DfT have written to us with a proposed TRO to replace the sliproad from westbound A14 at Girton to southbound M11. This is also part of the widening scheme between Histon and Girton, but this aspect requires an order to give the lane motorway status. The main effect seems to be to lengthen the A14 part of the slip road to reduce queues on the main A14.
I don't think anything particular needs doing with this, so I don't plan to scan the correspondence, but if anyone wants if, please ask.
Preferred route to be signed as an alternative to Chilwell High Road agreed between City, Broxtowe and County Councils.
Created by MJR // 2 threads
Some of (the last of?) the s106 money from two out-of-town big box supermarkets is being used to remodel the connections between the bus and rail stations. National Route 1 runs through this area and the bus station may also be Lynn's biggest cycle park, so there's quite a lot of potential for this to do good - or to do harm.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Area Committees are a joint meeting attended by both city and county councillors. They decide on planning issues in the area, but also have a role in the allocation of community development money from S106 contributions. They offer an opportunity to engage with multiple councillors at once, through the Open Forum section and speaking on specific Agenda items. The East Area's website is here: https://www.cambridge.gov.uk/west-central-area-committee
Speaking at these meetings is a good way of making your feelings on matters the councils control public
As discussed between local cycling organisations there is a desperate need for a signed route which avoids Chilwell High Road where there have been a number of accidents now tram tracks are laid in places. This route also avoids Beeston High St which is a lengthy dismount section from 9-5. This route supersedes the previous northerly route. A southern avoiding route has also been plotted on cyclescape
Created by Jean Dollimore // 1 thread
The proposals seek to improve road safety on the streets surrounding Regents High school in Somers Town which is being rebuilt. This school is labelled "South Camden Community School" on the map.
The consultation is on Camden's website at:
Currently the school is accessed from Charrington Street but the new building is going to face the other way and will be accessed via Chalton Street. Therefore most of the proposal are related to making a new school entrance and building out the footways in Chalton Street while taking them away in Charrington Street. All of this is clearly necessary, but doesn't appear to add to road safety.
The council also proposes a new speed table at the junction of Chalton Street and Aldenham Street. This would help with road safety.
Cyclists are already concerned with the rat-running on Ossulston Street; this quite likely accesses Eversholt Street via Chalton Street. Surely we should ask for this rat running to be prevented both for the safety of the cycle route and for children going to Regents High School?
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Anon // 0 threads
There is currently no secure locks provided at Port Rodie bus stop, the main departure stop for buses eastwards towards Dumfries and Carlisle.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Peter Loader // 0 threads
Transport Initiatives LLP is an independent transport planning consultancy. They have carried out an audit for Three Rivers District Council classifying roads, paths and crossings in terms of the UK National Cycle Training Standard (Bikeability) Level needed to be able to ride in comparative safety. The results can be seen on Three Rivers District Council's web site.
Transport Initiatives have classified the roundabout at M25 Junction 17, the adjacent Maple Cross Roundabout, and the dual carriageway between them as Level 3.5, i.e. "Roads & crossings with a very high level of risk, unsuitable for even highly experienced cyclists".
For detailed documentation, please see
http://www.threerivers.gov.uk/Default.aspx/Web/CyclingInformation
and download
Maps by area|Maple Cross
plus
Cycling safety audit|CSNA Leaflet
Following closely the route of an old railway line between Colchester and Brightlingsea this proposed route would link Colchester to Walton-on-the-Naze. It provides a much needed commuter route out of Brightlingsea linking it safely to Wivenhoe, the University of Essex and Colchester and creates a new leisure route in a holiday district. It builds on the existing four mile NCN51 route from Colchester to Wivenhoe by adding 5 miles off-road to Brightlingsea via a new river crossing at Alresford Creek. From there it utilises an existing pleasant frequent summer ferry crossing to Point Clear and creates a 25 mile coastal route much of it off-road.
Created by Gary // 0 threads
To improve safety after numerous fatal car accidents the Highways Agency are currently implementing speed restrictions but are also designing a new roundabout for the A120 near Pellens Corner/Horsley Cross. NCN51 passes nearby. Cyclists don't generally want to cycle the A120 but we do have to cross it to get across Tendring District. Roundabouts are particular hard for cyclists to use on A roads. So will the Highways Agency proposal include the needs of cyclists? http://www.highways.gov.uk/roads/road-projects/A120-Pellens-Corner-Average-Speed-CamerasSafety-Improvements
Created by Gary // 0 threads
Why would you put a gate across an official cycle route through the "Hangings" in Harwich, on the North Sea Cycle Route from Harwich International to Harwich Town? I've seen visitors from Europe try and cycle through this obstruction with trailers.
Created by Anna Langley // 0 threads
In advance of whatever fair it is appearing on Midsummer common, the "cyclists dismount" signs have appeared on the entrances to the common.
Created by David Earl // 1 thread
Leaflet through my door today about "new homes on land off Teversham Road, Fulbourn". Unspecific at this stage, will be revealed, no doubt, at consultation event on 28 June. But it must be big for the scale of the consultation. It also has a website: http://www.castlefieldconsultation.co.uk but that also says nothing very specific as yet.
Created by Jean Dollimore // 6 threads
This scheme proposes to restore two way working in Tottenham Court Road (TCR) and in the Gower Street alignment which includes Bloomsbury Street and Shaftesbury Avenue. All the bus routes will be on TCR.
The consultation is on Camden's website at:
http://www.wearecamden.org/westendproject/
In TCR, Camden proposes a "bus and cycle street" from 8 am to 7pm (Monday to Saturday) with local access for cars, taxis and loading on short sections of Tottenham Court Road via side roads.
TCR will have a pair of 4.5m wide carriageways to be shared by cycles and buses (90 buses per hour in each direction) and by the additional local traffic.
In the Gower Street alignment, Camden proposes two-way access for private motor vehicles (no buses) and that these roads will have a pair of 4.5m wide carriageways, each including a lightly segregated 1.5m wide cycle track.
Other measures proposed:
- in both TCR and the Gower Street alignment Camden proposes raised sections of road to reduce motor speeds
- two-way cycling in all the side streets (except for Maple Street, University Street and Howland Street)
- new public spaces including a new park on Alfred Place and a ladder of calm side streets.
These changes to roads and to cycle permeability are shown in the diagram at:
http://www.wearecamden.org/westendproject/assets/images/cycling-plan-resized
Details of the road layout for TCR are at:
http://www.wearecamden.org/westendproject/assets/images/tcr-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/tcr-south-resized
Details of the road layout for the Gower Street alignment are at:
http://www.wearecamden.org/westendproject/assets/images/gower-street-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/gower-street-south-resized
Exhibitions are to be held at the Building Centre, Store Street on 19th June (10 am to 5pm) and 7th July (5pm to 8pm),
Camden Cyclists are holding a public meeting for cyclists to discuss this project.
On 30th June 7pm - 9pm
at the YMCA Indian Student Hostel, 41 Fitzroy Square, London, W1T 6AQ.
We will finalise our response to the consultation early in July.
The public consultation will run until Friday 18 July 2014.
Created by Charlie Halliday // 1 thread
Proposal by HCC to add advisory cycle lanes on both sides of Kingsmead between the SUP near the junction with Victoria Road to the entrance of Pinehurst car park.
The cycle lanes would have a contrasting red surface at the entrances to Sainsburys and the Kingsmead and Sainsburys car parks.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by North Devon Cycling Forum // 0 threads
Removal of difficult barrier on cycle path NCN3 ending on Rose Lane; hardly possible to pass by bike, let alone trikes/tandems/mobility vehicles,
note this is NCN!
Created by Dawes Jaguar // 0 threads
This crossing is a problem for all road users, and it's quite common to hear blaring horns and screeching tyres. Pedestrians have a Puffin crossing, but for cyclists there is nothing. There is good reason for cyclists to cross Linden Road here, as it connects the bulk of the Bournville housing with the Worcester and Birmingham canal and the Rea Valley cycle route, and the motor traffic levels on Mary Vale Road are tolerable. Linden Road, on the other hand, is busy with motor traffic, including trucks. So the crossing needs to be improved, especially for cyclists heading along Mary Vale Road. Helpful to cyclists would be changing the priority in favour of Mary Vale Road. This would also encourage motorists to slow down on Linden Road. Unravelling routes in this way (so that cyclists cross main roads at a right angle and giving the cycling route priority) is one of the ways the Dutch encourage people to cycle rather than drive. Other possibilities are traffic lights or a mini-roundabout.
Created by Alex Jenkins // 1 thread
The consultation page states "A review of the Cheshire Street North 20mph zone has been undertaken and a number of improvements have been suggested making the roads safer and encouraging more walking and cycling in the area. The proposals include new cycle facilities, a one-way system on Wood Close, road closures and new crossings, as well as planting new trees in the area."
Link here: https://www.pclconsult.co.uk/projects/cheshire-street/
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Shaun McDonald // 1 thread
http://www.travelipswich.co.uk/what-is-happening-and-where/orchard-street-area/
What’s Proposed:
January 2014
* New cycle facilities to allow cyclists to travel northbound on Orchard Street.
* A 'No Entry except for cyles' sign to be placed on the St Helen's Street/Orchard Street junction.
Anon // 0 threads
The cycle parking on Parliament Street is great even though there isn't enough of it on a weekend, but when events are on such as the Christmas Market or Food Fairs it's a nightmare to get your bike down Parliament Street past the crowds of people to only find all but one row of racks is blocked by tents. It would be much better if all the racks were moved down to the Pavement end of Parliament Street.
Created by MikeC // 1 thread
As part of the highways 'improvements' associated with the proposed New Monks Farm development in Lancing, the existing minor road N-S crossing of the A27 by the Sussex Pad (Coombes Road to Old Shoreham Road) is to be closed and replaced by a large multi-lane light controlled roundabout some 400m west of the existing crossing. The only assistance for vulnerable road users will be several Toucan crossings as part of the roundabout light controls.
Net result will be an additional 1km diversion for anyone going south into Shoreham, plus additional time waiting at Toucans. An underpass on the existing crossing alignment would be the preferred solution, as recommended in IAN195.
Created by Kevin Ablitt // 1 thread
Twice in the past week I have been cycling up St Johns to make a rh turn onto Cauldwell Hall and nearly been taken out by a driver taking the corner too fast as they travel north bound along Cauldwell Hall and turn down St Johns Rd.
The problems are too fast traffic on Cauldwell Hall and poor design at that junction , need an island to separate traffic.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Jean Dollimore // 3 threads
From time to time, we receive consultations on Play Streets and rather debating each one as it comes in, I think it could be helpful to have a policy as to whether CCC want to respond as a group and the position we should take.
Play Streets are achieved by the occasional closures of a stretch of road to enable children to play (e.g. twice a month for a couple of hours).
The road closures are usually operated by local residents using ‘road closed’ signs, advanced warning signs and barriers.
Play Streets are not directly connected to cycling. But, as they may give people an idea that it would improve the area to have longer term road closures, I would like to support such schemes.
Hamish F // 1 thread
Quoting from the proposal: "This short section will provide an initial link from the A105 major scheme to the Salmons Brook cycle route." Part of Quietway 18.
The main feature is an improved junction at Bury Street West and Church Street, with a 2.5m wide two-way cycle track to take cyclists from that junction to Blakesware Gardens (and onto the Salmons Brook cycle route).
Also some rain gardens and other improvements.
What's not to like, comments please ...
Created by George Coulouris // 7 threads
This issue is intended to act a repository for material that can be used to back-up the LCC's 2014 Local Election Campaign 'Asks'. There are 6 'asks' that were finalised and agreed at the LCC's AGM on 19 October 2013:
1. Safe routes to schools
2. Areas without through motor traffic (AWTTs)
3. Protected space on main roads/major junctions
4. Safe cycle routes via parks and canals (Greenways)
5. 20mph speed limits
6. Liveable town centres
so we'll have 6 threads under this Cyclescape issue where we can collect explanations, discussions and most importantly concrete illustrations of what is meant by each ask.
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
Created by Chris Peck // 1 thread
With the welcome completion of the cycle path linking Marshall Road to Bridge Road, the weaknesses of links on either side of the route become more apparent.
Bridge Road is a busy, narrow main road. Traffic mostly has to wait behind cyclists, creating uncomfortable conditions for all but the brave. Both roundabouts (at the Chalk Road/Meadrow and the Bridge Street/Wharf Street junctions) are difficult for cyclists (and pedestrians).
An alternative route, either running parallel to the road (a widened shared use footway?) or a raised boardwalk across the Lammas Lands, are alternatives, but both are expensive, challenging options, which require new or wider bridges over Hell Ditch and the River Wey.
Created by David Butler // 3 threads
The Bridgewater Way aims to provide a high quality route for walkers and cyclists over the complete 65km length of the Bridgewater Canalbetween Runcorn, Leigh and Manchester City Centre. The cornerstone of the project is a major upgrade to the canal towpath, which as well as greatly improving conditions for pedestrians, will make it easier for cyclists to use the tow path.
The Deansgate / Whitworth Street West Street junction is also proposed to be revised to provide toucan crossing points and easier access to the canal from Whitworth Street West withsignal controlled cycle movements running past Deansgate station. The proposed works at the
junction are also intended to provide improved “on street” facilities to assist cyclists travelling towards and away from Manchester city centre.
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
Kate Ravilious // 1 thread
Car parking obstructs cyclists travelling uphill, forcing them to stop and start on a steep uphill section, or move into the path of oncoming traffic travelling downhill.
It would be safer to have car parking on the other side of the road.
Created by Gingineer // 1 thread
I work near the station and the area out the front of the new building has short term cycle spaces for the shops there. These spaces are specifically for the retail units (ratios of this is in the planning application I understand). so the racks have to be installed and wont be policed by the retail units (such as the ones by Microsoft which are for employees) yet they fill with commuters who should be using the cycle park.
I have been thinking that Cambridge CC needs to agree a system (bye law?) to create short term racks. The colour should be different and signage provided but for racks that need controlling like this it is essential to stop antisocial cyclists piling up bikes.
Of course its difficult to police, and a heavy handed approach should be avoided but I see a growing issue across the city where racks for specific short term purposes are created but then filled with long term cyclists who should accept if they are parked all day that the extra 2 minutes walk for them to a proper cycle park is reasonable to expect. Otherwise this puts people off cycling the short distances as they fear they wont get a rack or will spend a lot of time scrambling for a spot.
Cyclists could be stickered and if caught again then fined. Or clamped to the rack with a fee to unlock (yes I know that sounds like it defeats the object but it should work after a while).
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf