Landseer Road-more signage or traffic calming needed
cycle lanes very narrow with cars parked on, high traffic speed.
Traffic calming or more signage needed
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Andrea // 0 threads
cycle lanes very narrow with cars parked on, high traffic speed.
Traffic calming or more signage needed
Created by Andrea // 0 threads
high speed of vehicles and car parking make this road section hazardous. Traffic calming and signage needed.
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Created by Shaun McDonald // 0 threads
Issue raised at the 10-2014 Cycle Ipswich meeting:
"not enough showers", need more information, such as whether this is specific to a particular department or building.
Created by Shaun McDonald // 1 thread
It's rather odd that the NCN1 has a route sign that tells you to turn right, plus a cycle sign towards the station, yet there is a no right turn sign on the same post.
Martin Lucas-Smith // 3 threads
The University is planning to redevelop the New Museums site. We need to monitor the proposals for cycle parking and cycle access issues.
http://www.admin.cam.ac.uk/offices/em/estate/site/newmuseums.html
NB The Arup Building redevelopment currently in progress is part of the overall redevelopment.
Let's see what happens!
Council Plans to change the Zebra crossing in this area. RCC responded to try to shape the plans to encourage more cycling and walking.
-------
Sheen Road Zebra Crossing Proposed Upgrade - Response from Richmond Cycling Campaign (RCC)
RCC is in general supportive of improving crossings when the upgrades benefit both pedestrians and cyclists. This proposal unfortunately has not fully thought through the interaction of cyclists, pedestrians and motor vehicles, unfortunately we cannot support it in its current form.
RCC would recommend that the scheme is implemented with the changes outlined below. The recommended changes will ensure that vulnerable road users safety is prioritised and the comfort of the cycling and pedestrian experience is enhanced:
The crossing should be raised to slow approaching vehicles. Vehicle speeds are too high in this area, particularly considering the proximity to a primary school.
Removal of the central refuge to create a single stage crossing is to be applauded. This will remove a cycle pinch point and will correctly prioritise pedestrians over other road users.
The new road space that is created by the removal of the central refuge should be used to extend the existing mandatory cycle lanes on each side of the carriageway. It is our understanding that the 2015 TSRGD (traffic signs regulations and general directions) will permit the extension of the cycle lanes over the crossing. The work should pay heed to this so that this can be incorporated when the new regulations go live.
Keep the zebra crossing. RCC cannot support the removal of the zebra crossing at this location, changing to a traffic light controlled crossing, prioritises vehicular traffic over pedestrians and those on bicycles. It is RCC’s belief that concerns, from users, that vehicles are not stopping in a timely fashion at this location are due to excessive speeds rather than the style of crossing. As mentioned earlier lower speeds should be achieved through a raised crossing to make the zebra crossing more effective. An enhanced zebra crossing keeps priority with the most vulnerable road users.
The proposal suggests widening the pavement to make the crossing shorter. This would only have a marginal impact on the time to cross. The pavements should not be widened since this will not permit a continuous cycle lane. It will force cyclists to pull in front of fast moving motor vehicles, creating a new pinch point and hazard for cyclists.
The railings on either side of the road should be removed. TfL research has shown that these encourage high traffic speeds and do little to protect vulnerable road users.
Created by Shaun McDonald // 0 threads
Comments at Cycle Ipswich meeting on 2014-10:
"no cycle lanes"
"scary" referring to the roundabouts.
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Want separate cycle and pedestrian lanes all the way along the river path."
Currently the river path is a useful off road link, however it's far too narrow for both pedestrians and cyclists.
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Belle Vue Road is very steep for a recommended cycle route."
It's marked on the Ipswich Cycle Route Map.
Created by Shaun McDonald // 0 threads
Comment from October 2014 Cycle Ipswich meeting:
"New white lines force cyclists into traffic."
Created by Shaun McDonald // 0 threads
Comment from the Cycle Ipswich meeting:
"Traffic enforcement for speeding especially 6:15-7pm weekdays."
Created by Shaun McDonald // 1 thread
Comments from Cycle Ipswich meeting:
"Clearer signage - for all"
"More obvious route to/from town"
"alternative 'football days' routes"
Created by Shaun McDonald // 1 thread
Comments from the Cycle Ipswich meeting:
"Poor infrastructure - shared use footway no good"
"poss pinch point removal bot other traffic calming."
Created by Shaun McDonald // 0 threads
Cycle Ipswich Meeting: "Getting south across Star Lane to waterfront very unpleasant".
Where the cyclepath merges onto the road outside the Mercedes garage going to Huddersfield . The white lining disappears and the kerbs rises out of the ground causing a hazard.
I recently came off at speed here causing injury and damage .
Created by Shaun McDonald // 0 threads
Comment at Cycle Ipswich meeting on 2014-10-09:
"not at all nice - cycle "lane" too narrow, not visible in dark, potholed, conflict with turning traffic etc. better to have only 1 lane motors and thus proper [cycle] lane??? (still left turn problem)"
Created by Shaun McDonald // 0 threads
Pedestrians and cyclists are put into conflict when trying to cross at this toucan crossing on Grimwade Street/Rope Walk junction.
Created by Shaun McDonald // 0 threads
The route to Tattingstone from Ipswich requires going along a part of the A137 or over some fields, neither of which is pleasant. An improved alternative is sought.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Andrea // 0 threads
blind bends and high hedges make this junction dangerous as you cannot see traffic
Created by Andrea // 0 threads
This junction needs to improved for cyclists. It is currently dangerous. Please discuss this and give ideas on how to improve it best
Created by Andrea // 0 threads
Woodbridge Road needs a dedicated cycleway, with contraflow when going down towards town. Currently you haven't got the opportunity to use Woodbridge Road as a quick route into town from e.g. Ipswich Hospital as you cannot go all the way.
Created by Andrea // 0 threads
a viable connection for NCN 1 through the Common is needed. Currently we have to go a very awkward route, mixing with traffic
Created by Andrea // 0 threads
We need a cycle route connection alongside this part of Woodbridge Road by Rushmere Common.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by Martin A // 1 thread
This attractive former railway line would provide a useful off-road link between Ripley Greenway and Derby for commuters and leisure users.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.