Greater Anglia Cycle Strategy
Greater Anglia has just issued a consultation on cycles at stations and on trains
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by Al Storer // 4 threads
A citywide (and indeed beyond) problem is poor consideration given to the needs of cyclists and pedestrians during road works- eg "cylist dismount" sign use
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by aSemy // 0 threads
https://www.citizenspace.com/bristol/city-development/baldwin-street-cycle-safety-fund-scheme
Overview
The purpose of this scheme is to address the large number of crashes involving cycles on Baldwin St, at the junction with Queen Charlotte Street.
We propose extending the existing cycle track at Welsh Back and take it across the junction via a humped crossing. We have introduced a ‘floating bus stop’ to separate buses and cyclists. There will be a formal crossing point for pedestrians to access the stop from the footway.
A small number of parking places would be removed but loading, bus and taxi facilities are retained, although altered.
Created by Shaun McDonald // 0 threads
The legal pavement cycling is suddenly not allowed 3 car lengths before a cycle shop near this junction which has toucan crossings and cycle paths on all other sides of it. Why can't it be continued to the bike shop for a safe cycle route to/from the junction away from traffic?
Created by Shaun McDonald // 0 threads
The cycle cut through between Appold St and Worship St is often blocked by pedestrians or Taxis dropping off passengers. It's also too narrow, thus can only be used one way, and isn't suitable for higher levels of two way cycling.
Created by Jean Dollimore // 5 threads
Camden Council proposes major improvements to Cobden junction – the junction of Camden High Street with Crowndale Road and Hampstead Road at its southern end.
They propose the following measures:
- eliminate the unnecessary northbound road on the east side of the island
- gain extra footway space on the east side of the road (uses to include cycle parking, trees, seating)
- widen the footway outside Mornington Crescent Station
- safer, quicker and simpler pedestrian crossings
- improved link for cyclists to the Mornington Crescent quiet route (from Arlington Road).
- new ASL boxes with lead-in lanes on the approach to the junction from Eversholt Street, Crowndale Road and Hampstead Road.
- re-site the statue of Richard Cobden and the war memorial
Proposal for contraflow cycling on Crowndale Road:
A few months ago, we were shown designs for a contraflow on Crowndale Road between Hampstead Road and Bayham Street with some junction changes at the latter to accommodate it. Unfortunately, this was rejected by TfL on the grounds that it would delay buses. This consultation notes that the layout has been designed to accommodate the contraflow at a future date.
This consultation also says that in addition, alternative options for providing a west to east link are being explored at both Delancey Street / Pratt Street and Oakley Square. We need to encourage Camden to pursue these essential links. In the case of the latter, there is an urgent need to allow cyclists to make right turn right into Hampstead road from the southern end of Mornington Crescent.
See consultation on Camden Council website:
https://consultations.wearecamden.org/culture-environment/cobdenjunction
Created by Aidan Van de Weyer // 0 threads
The Hills Road / Regent Street axis of the Catholic Church junction was resurfaced overnight (28-29 August) as part of the junction upgrade.
Many of the damaged iron works (manhole covers, etc) have not been changed. Some are in a bad state and quite dangerous because they have worn smooth, sunk or tilted.
I have contacted the Traffic Signals team at CCC, as they seem to be responsible for the works, and they should be getting back to me.
If anyone else fancies having a go at finding out what is going on and whether anything can now be done, it would be very welcome.
Created by George Coulouris // 1 thread
For discussions on the design of the new website, following the CCC Committee decision to initiate the construction of a new CCC website.
A working party has been set up, consisting initially of George, Jean, Ben and Geoff.
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by Ben Edmonds // 1 thread
Redesign of street to include two-way for cyclists, one-way for motorists, light segregation and bus stop islands.
Martin Lucas-Smith // 1 thread
Changes to car parking in the Kite are proposed.
Cycle parking is not being included.
Created by Dan Doherty // 0 threads
Very narrow cycle lane between University Road and Violet Road and Broadlands Road. Encourages very close passes when cycling in the lane (with 10cm of your handlebars), or aggressive impatient driving if you cycle outside of the lane. Additionally to cycle within this cycle lane it is necessary to cycle closer to the kerb than the recommended 50cm from kerb (http://www.cyclescheme.co.uk/community/how-to/road-positioning)
Lane markings are extremely faded. Lane contains several drains.
No cycle lane would be better than the current cycle lane.
Created by Shaun McDonald // 0 threads
The railings here probably should be removed. They promote faster motor vehicle driving, as drivers think it's safer as nothing will walk out in front of them.
Created by Robin Heydon // 1 thread
Planning application for flats near the Busway Cycleway
Created by Martinn // 0 threads
There is a set of bollard which have been placed that prevent cycling as a family, in order to reduce car journeys. Negotiation without manhandling the Bike and dismounting is impossible when riding a Tandem, and requires even more effort when a Tag -along is connected. Can these obstructions be removed please
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Broken headlight glass from a couple cars has been there since 8th August
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by Shaun McDonald // 1 thread
Would it be possible to make the full length of Marchmont Street two way for cycling? The northern half doesn't seem to be now.
Created by Shaun McDonald // 0 threads
It's horrible to cycle along Old Street due to the number of cars/taxis/minicabs parked in the cycle lane. I usually find this a lot worse in the evening.
Created by Shaun McDonald // 0 threads
The toucan crossing for cyclists avoiding Old Street Junction are very slow to change for pedestrians and cyclists. Often people get fed up waiting and then dart across in a gap. Or once there is a gap, it takes until cars start appearing before they change.
If TfL is seriously interested in encouraging walking and cycling they need to change the timing of these lights so that they don't take forever to change.
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by WilliamNB // 1 thread
On Royal Parade, when traveling in an easterly direction, shortly before the pedestrian lights by the Theatre Royal there is a poorly repaired trench across the road.
In lane 2, the surface is reasonable, but in lane 1 the tar has shifted to create a severe and unmarked speed hump. This is dangerous to cyclists.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.