Include in 20mph
Kirk Brae and Lasswade Rd at least up to Margiotta should be included in 20mph. It's very narrow, residential, and with many shops in Lasswade Rd.
It's also steep uphills and fast overtaking makes it very dangerous for cycling.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Stephan Matthiesen // 0 threads
Kirk Brae and Lasswade Rd at least up to Margiotta should be included in 20mph. It's very narrow, residential, and with many shops in Lasswade Rd.
It's also steep uphills and fast overtaking makes it very dangerous for cycling.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Stephan Matthiesen // 0 threads
Roundabout needs cycling and pedestrian provision, extremely difficult to turn right from Newcraighall Rd or cross from B&Q to Fort Kinnaird.
Created by Stephan Matthiesen // 1 thread
Terrifying stretch of Gilmerton Rd around Robin's Nest needs complete overhaul. Pinch points, blind corners, parking, cratered surface, and school exit, also on a hill where cycling and driving speeds vary a lot.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Stephan Matthiesen // 0 threads
A new path between Cameron March and Crawfurd Rd would be an enormous improvment as it would allow cyclists coming from Old Dalkeith Rd and Peffermill Rd to avoid Lady Rd (steep uphills, no cycle provision, much traffic) or Dalkeith Rd (steep uphills, no cycle provision, much traffic, plus parking).
This path would also connect naturally to the strange cycle path on the inside of Cameron Toll that just ends on Lady Rd. with a "cyclist dismount" sign.
Created by Stephan Matthiesen // 1 thread
Guardrails on W side of the toucan are unnecessary, restrict the footpath & lead to conflict between pedestrians and cyclists. They also block part of the dropped kerb.
Created by Stephan Matthiesen // 1 thread
No way to get a bicycle through these chicanes.
Created by Stephan Matthiesen // 0 threads
Important connection to get from Gilmerton Rd to Liberton Rd/Mayfield Rd/Kings Buildings, but road surface is badly cratered with some deep holes in blind corners.
Created by Stephan Matthiesen // 0 threads
Remove the railings at the steps, unnecessary street clutter that narrows the pavement and makes crossing Old Dalkeith Rad more difficult.
Created by Stephan Matthiesen // 0 threads
Dropped kerb needed at the end of Ravenswood Avenue, so that bicycles can get to the footpath that leads to the toucan.
Created by Stephan Matthiesen // 1 thread
The footbridge has lot of steps, even though it is a shallow ramp; apparently the designers did not expect that people with bicycles, wheelchairs, buggys or trolleys might ever want to use the bridge.
Created by Stephan Matthiesen // 0 threads
The Range supermarket has no cycle parking at all, and no railings or other things to lock a bike to. I usually lock it to a couple of shopping trolleys, but I'm sure that's not what the shop prefers.
Created by Stephan Matthiesen // 0 threads
Build a path (steps and alternative ramp) from the bus stop in Liberton Road to the Shopping Centre.
This would be an ENOURMOUS improvement for shoppers who use the bus, as currently you have to walk all the way to Gilmerton Rd and back across the car park.
The path would enable cyclists to avoid the busy and fast Lady Rd roundabout to get into the car park.
Created by Stephan Matthiesen // 0 threads
The underpass of Innocent under Milton Link is very dark (even during day); particularly unpleasant/dangerous as the path surface is badly damaged, cracked and uneven, and very often rubbish, stones or other obstacles are placed there by inconsiderate citizens.
Needs better lighting and resurfacing.
Created by Stephan Matthiesen // 0 threads
The cattle pen in the middle of York Place is too narrow and has awkward corners so that you can't even push a bike there when there are pedestrians.
Created by Stephan Matthiesen // 0 threads
It is really not clear how you get from the east end of George Street to York Place. The toucan leads you onto the pavement in the centre of St Andrews Square but then there is no sign or any hint how to get to NE corner of St Andrew Sq where the shared footpath starts again.
Created by Heather Coleman // 2 threads
I noticed a poster at the junction of Elm St and Clarendon St a few days ago. As I needed a rest this morning I stopped to read it. Apparently ONLY the residents of the Kite area (and not all of them according to the note pinned below the poster) are being consulted on the closure of Elm St, as far as I can tell, at the Elm Tree pub, to motor vehicles. Allegedly access by cyclists and pedestrians will be unaffected (although if it's some kind of rubbish narrow everyone having to give way to everyone else design, some regular users might wish to take issue with this, and suggest improvements to the design).
There is no reference to this anywhere I can find online. If I wish to reply to this consultation (and as I'm not a resident, will my views be taken into account?), I will have to go back to the poster and copy down the email address on a bit of paper. Deadline is tomorrow.
However, as a DAILY user of Clarendon St, I feel my democratic rights are being are being totally undermined. It may well be that a very large number of residents are against this proposal. Looking at it, it looks as if, for the vast number of cyclists who cycle along Clarendon St, it will probably improve safety as there may be fewer motor vehicles trying to use the Elm St crossroads which is probably the dodgiest bit of this route. Therefore regular users of Clarendon St may well wish to support this proposal.
My question is: how can they have a consultation that's secret and only open to those who actually live in an area rather than all those actually affected? As far as I am concerned this is totally undemocratic to the extreme.
If anyone is passing the area in the next couple of hours and has the technology to take a photo of the posters and start a thread on here regarding it and posting the posters so we can look at them at our leisure, it might be helpful for those of us who might like to drop a quick email in support of this plan.
Created by Stephan Matthiesen // 0 threads
Kirk Brae really needs a cycle lane uphills. There is enough space as the car lanes are fairly wide (sometimes with space wasted by hatching in the centre) but at the moment encourage dangerous overtaking.
Created by Stephan Matthiesen // 0 threads
Parked cars create narrow pinch points in front of the school, cycle lane becomes unusable so that cyclist can't pass the queuing cars.
Created by Stephan Matthiesen // 1 thread
Making the Park-Glenallan Drive connection unnecessarily awkward for trailers, wheelchair users and others.
Created by Stephan Matthiesen // 0 threads
The gate at the top of the cycle path, at Lasswade road, is very difficult to open when you're on a bicycle, and it swings into to path.
It is not clear why a gate is needed here in the first place (the whole fence is quite pointless), it could be removed.
Created by Stephan Matthiesen // 0 threads
Some kind of connection across Lasswade Rd (40mph!!), either an underpass or a toucan crossing, to connect the Burdiehouse Burn paths.
Created by Shaun McDonald // 2 threads
Suffolk County Council have put forward some plans for changes to Mulberry Corner, which Cycle Ipswich don't believe will help cycling.
Created by Stephan Matthiesen // 1 thread
There should be a walking/cycling connection between Lidl and the housing behind it (Craigmillar Castle Avenue area).
People living there are forced a long detour down to Niddrie Mains Rd then up to Lidl again. This encourages car use and discourages walking.
Niddrie Mains Rd is terrible for cycling so this connection would also benefit people cycling from Greendykes or Inch (through the park).
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Elizabeth E. // 1 thread
TfL are making changes to junction because of safety issues.
For Cyclists:
Two-stage right turns at the junction in the west to south and east to north directions
An early release at the traffic lights on all four arms of the junction
Deeper Advanced Stop Lines (ASLs)
Mandatory cycle lane on Camberwell Church Street westbound approach to operate at all times
St Giles bus stop moved further west from the Vicarage Grove junction to improve safety of left turning cyclists on the LCN 23 cycle route
Resurfacing throughout the junction.
Retention of the 20mph speed limit at the junction and on all the approaches.
Created by Andrea // 1 thread
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
Created by Jean Dollimore // 1 thread
Camden is consulting on improving safety for pedestrians in the vicinity of Hampstead School in Westbere Road.
See StreetView from Lichfield Road (Barnet) towards Westbere Road Camden showing Hampstead School on the left and the 20 mph sign
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Kate Ravilious // 2 threads
The Fishergate Gyratory is a complete nightmare for all cyclists and very dangerous. Crossing the lanes of the busy dual carriage-way is dangerous and drivers show little awareness or patience with cyclists. The entire junction needs rethinking.
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Created by North Devon Cycling Forum // 0 threads
Change of Road lay out on Long Bridge; NO new centre road line when road is due resurfacing and long term research into "shared space" alternative road surface
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by jpennycook // 1 thread
Erection of Class A1 and Class A3/A5 units. Provision of highway works and alterations to access; parking; landscaping; service infrastructure; and associated works and improvements.
St Michaels Retail Park The Harrow Way Basingstoke Hampshire
Basingstoke
Application reference : 16/04208/FUL
NCN45 across Peckforton Hill at risk of being closed
Created by Simon B // 1 thread
Adjacent to existing apartments on Sealand Road near the Cop is a new development currently under construction by Watkins Homes Ltd. Curently there is a barriered-off ramped access to Sealand Road to cross the Canal entrance to the river that leads around the exisiting apartments. This was originally envisaged as part of a continuous shared use riverside route.
The development of the site offers the opportunity to ensure that shared use access can be maintained, developed and improved along the riverside route that skirts the perimiter of the Racecourse and continues to the River Dee path that leads to Garden City and Queensferry. This could be before residents purchase properties who could well be resistant to a pathway near their new homes.
Whilst the access to the River Dee from the Shropshire Union Canal presents a barrier to a straightforward continuation of the riverside route to join the River Dee shared use path into Wales, the creation of a small extension around the permiter of the new development under construction would mean that an attractive continuous offroad route could be created with minimal additional works (widening of the existing footway for approximately 100mtrs).
It would be helpful to gather thoughts and ideas before the developers and Planning and Highways Department of the Local Authority are approached about this opportunity
Created by Roxanne (CEO) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Simon Nuttall // 3 threads
London Cycling Campaign's Space for Cycling campaign
Has a clear message - what can we learn from them?
Barriers, so many barriers, most of which should be removed.