23/04840/FUL ew office building off Maids Causeway
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Josh Grantham // 1 thread
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
Created by KW // 1 thread
23/04936/FUL | Full planning application for the construction of 91 new homes with associated infrastructure, internal roads, open space as part of phase 3 within the Marleigh development as a modification to outline permission S/2682/13/OL to increase the overall unit numbers across the site to 1,391 homes. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by KW // 1 thread
23/04930/REM | Reserved matters application detailing, appearance, landscaping, layout and scale for the construction of 332 new homes and commercial space with associated infrastructure, internal roads, open space as part of phase 3 pursuant to condition 5 (reserved matter) of outline permission S/2682/13/OL dated 30 November 2016. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by Gregory Williams // 1 thread
A tree has fallen blocking NCR1 at Duke's Meadow. In the meantime it is still possible to cut across the grass to continue the route.
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
Tom McKeown // 1 thread
First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.
Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE
South Cambridgeshire
Application reference : 23/04537/FUL
Created by Edward Bainton // 1 thread
Crossing from Bright Street to Geneva Street, the cycle lights do not sense the bike. You can sit through 10 phases and you never get a green light.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by Isaac // 1 thread
Recent roadworks have left the cycle lane entering Cambridge in an unusable state. There are large bumps across the width of the cycle lane which makes cycling along it dangerous. Needs to be fixed asap.
Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.
Land At Ditton Walk Cambridge Cambridgeshire
Cambridge
Application reference : 23/04380/FUL
Not shown in the plans, but suggested in the D&A: a pedestrian link between Ditton Walk and the Trail
Created by Campbell Mccaig // 1 thread
A real lack of strimming too making some paths nearly unuseable.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for the 2024 AGM are well-underway!
Please join us on Saturday 20 January, 2-5pm at Storey's Field Centre (main hall).
Created by Gregory Williams // 1 thread
The River Dour Greenway sign pointing into Lorne Road from the shared path beside Buckland Avenue is missing. Previous Google StreetView imagery shows the sign which has gone missing:
Created by Gregory Williams // 1 thread
Bollards on the path used by the River Dour Greenway between Alfred Road and Brookfield Place limit access for people with trailers or on tandems.
Created by Martin Wheatley // 1 thread
Absolutely disgraceful deposit of mud by tractor drivers hauling harvested beets on Fen Lane (the back way to the north of Swaffham Bulbeck which many of us use to bypass the unpleasant B1102 through the village). In my opinion it is not currently safely passable on a bike. I was on foot, in wellingtons, and found it hard to stay upright. The number of tractors and the aggressive speed at which they are being driven is an additional hazard. Until this is cleared up, the options are the main road through the village, or (somewhat longer but much less busy), divert via High Street, Quarry Lane and Heath Road back on to the B1102 and the Greenway to Swaffham Prior north of the village.
Created by Gregory Williams // 3 threads
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
Created by Gregory Williams // 1 thread
There is a comparatively new shared path linking Burgess Road to Alyesham's station. However the Burgess Road end of the shared path doesn't have a dropped kerb to allow a transition between road and path and vice-versa.
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
Created by Gregory Williams // 1 thread
The sign towards the Town Centre is missing. Previous view of the sign here:
Created by Gregory Williams // 1 thread
The sign pointing into Alfred Road at Lorne Road is missing.
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
Street Light FCND004 on Falala Way (NCN1) - Not Working Fault Number: 750068
Created by Owaldron // 1 thread
See Picture, Reported to CCC. However, I have a hunch that it may be the responsibility of 'LandMarc' on behalf of the MOD as I think they would own that land.
Created by Gregory Williams // 1 thread
A better cycle connection is needed to Rough Common, avoiding the need to use the A290 Whitstable Road or A2050 and Palmars Cross Hill.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Elizabeth E. // 1 thread
TfL are making changes to junction because of safety issues.
For Cyclists:
Two-stage right turns at the junction in the west to south and east to north directions
An early release at the traffic lights on all four arms of the junction
Deeper Advanced Stop Lines (ASLs)
Mandatory cycle lane on Camberwell Church Street westbound approach to operate at all times
St Giles bus stop moved further west from the Vicarage Grove junction to improve safety of left turning cyclists on the LCN 23 cycle route
Resurfacing throughout the junction.
Retention of the 20mph speed limit at the junction and on all the approaches.
Created by Andrea // 1 thread
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
Created by Jean Dollimore // 1 thread
Camden is consulting on improving safety for pedestrians in the vicinity of Hampstead School in Westbere Road.
See StreetView from Lichfield Road (Barnet) towards Westbere Road Camden showing Hampstead School on the left and the 20 mph sign
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Kate Ravilious // 2 threads
The Fishergate Gyratory is a complete nightmare for all cyclists and very dangerous. Crossing the lanes of the busy dual carriage-way is dangerous and drivers show little awareness or patience with cyclists. The entire junction needs rethinking.
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Created by North Devon Cycling Forum // 0 threads
Change of Road lay out on Long Bridge; NO new centre road line when road is due resurfacing and long term research into "shared space" alternative road surface
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by jpennycook // 1 thread
Erection of Class A1 and Class A3/A5 units. Provision of highway works and alterations to access; parking; landscaping; service infrastructure; and associated works and improvements.
St Michaels Retail Park The Harrow Way Basingstoke Hampshire
Basingstoke
Application reference : 16/04208/FUL
NCN45 across Peckforton Hill at risk of being closed
Created by Simon B // 1 thread
Adjacent to existing apartments on Sealand Road near the Cop is a new development currently under construction by Watkins Homes Ltd. Curently there is a barriered-off ramped access to Sealand Road to cross the Canal entrance to the river that leads around the exisiting apartments. This was originally envisaged as part of a continuous shared use riverside route.
The development of the site offers the opportunity to ensure that shared use access can be maintained, developed and improved along the riverside route that skirts the perimiter of the Racecourse and continues to the River Dee path that leads to Garden City and Queensferry. This could be before residents purchase properties who could well be resistant to a pathway near their new homes.
Whilst the access to the River Dee from the Shropshire Union Canal presents a barrier to a straightforward continuation of the riverside route to join the River Dee shared use path into Wales, the creation of a small extension around the permiter of the new development under construction would mean that an attractive continuous offroad route could be created with minimal additional works (widening of the existing footway for approximately 100mtrs).
It would be helpful to gather thoughts and ideas before the developers and Planning and Highways Department of the Local Authority are approached about this opportunity
Created by Roxanne (Cycling Campaign Officer) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Simon Nuttall // 3 threads
London Cycling Campaign's Space for Cycling campaign
Has a clear message - what can we learn from them?
Barriers, so many barriers, most of which should be removed.
Created by Fran Graham // 3 threads
TfL say:
We want your views on proposals to transform roads in Bermondsey, Rotherhithe, Deptford and Greenwich to make cycling and walking easier, safer and more appealing.
Cycle Superhighway 4 (CS4) would provide a continuous segregated cycle route between Tower Bridge and Greenwich, along with new pedestrian crossings, improved public spaces and a host of other improvements aimed at creating a more attractive environment for all users and accommodating the area’s future growth. This consultation does not include proposals for Lower Road, which will be consulted on at a later date (find out more).
CS4 would form part of London’s expanding network of Cycle Superhighways, an important part of the Mayor’s draft Transport Strategy and Healthy Streets Approach, which aim to encourage walking, cycling and public transport, making London greener, healthier and more pleasant.
Summary of proposed changes
Our proposals for CS4 include:
Two-way segregated cycle track on Tooley Street, Jamaica Road, Evelyn Street and Creek Road, providing a dedicated space for people who want to cycle
Five new signal-controlled pedestrian crossings and upgrades to over 20 existing pedestrian crossings, making it easier and safer to cross the road
Building on the recent short-term improvements at Rotherhithe Roundabout by redesigning the roundabout to improve safety as part of our Safer Junctions programme.
Installing a new eastbound bus gate on the Jamaica Road approach to Rotherhithe Roundabout, giving buses priority at the roundabout and improving bus access to Lower Road
New and improved public spaces at Deptford High Street and Rotherhithe Roundabout, including new paving and trees
New traffic restrictions, including banned turns on some side roads along Jamaica Road and at Deptford High Street
Changes to some bus stop layouts and locations, including new bus stop bypasses for cyclists (find out more about bus stop bypasses)
Why are we proposing CS4?
Around 3,500 trips are already being made daily by people cycling along the A200. In addition, this route has some of the highest numbers of pedestrian numbers in London. CS4 is designed to help us meet the target set out in the Mayor’s draft Transport Strategy of changing the way people choose to travel so that, by 2041, 80 per cent of all trips in London are made by walking, cycling or public transport, up from 64 per cent today.
Improving safety
Safety is one of the main barriers to cycling in London. Between September 2013 and August 2016, there were 93 recorded collisions involving cyclists and 49 recorded collisions involving pedestrians along this section of the A200. Our research shows that, were the route safer, more journeys could be made on foot or by cycle.
CS4 would separate cyclists from motor traffic by providing kerbed cycle tracks along its length. At major junctions, cycles would be separated from motor traffic using cycling-specific traffic light phases to reduce the risk of collisions. Our proposals also include major safety improvements at Rotherhithe Roundabout, which was identified as a priority for changes as part of our Safer Junctions programme.
Encouraging active travel in south-east London
Cycling is now a major mode of transport in London. There are more than 670,000 cycle trips a day in the capital, an increase of over 130 per cent since 2000. The introduction of the East-West and North-South Cycle Superhighways has seen a significant increase in cycling as a mode of transport along those routes.
An emerging network of Cycle Superhighways exists in north, south and east London, but none yet in south-east London. Our proposals would bring a high-quality cycle facility to south-east London, encouraging more people to start cycling. Our analysis shows that sections of Tooley Street and Jamaica Road are among the top one per cent of areas for cycle demand in London, while the entire CS4 route is in the top five per cent.
Improving facilities for cycling and walking along the proposed CS4 route would not only benefit those who currently walk and cycle, but could also have a positive effect on public health by increasing the levels of physical activity in the area. Our research shows that sections of the proposed route are in the top one per cent of London’s road network for its potential to switch from vehicles to cycling as a means of transport. The majority of the route is in the top five per cent. There is also great potential to encourage people to switch from making short vehicle trips to walking.
These proposals form part of the Mayor of London’s plan for Healthy Streets. This is a long-term vision to encourage more Londoners to walk and cycle by making London’s streets healthier, safer and more welcoming. Currently, only 34% of Londoners take 20 minutes of physical activity on any given day. The new cycle facilities and pedestrian improvements are designed to help encourage more people to use active and sustainable modes of transport.
Improving places
Our proposals would help connect Bermondsey, Rotherhithe, Deptford and Greenwich, linking important amenities and facilities, making them more pleasant places to live, work, shop and spend time. We would install new seating areas and cycle parking to provide space for people to rest and spend time in these town centres, along with other improvements such as new plants and trees. Our proposals aim to create more welcoming and inclusive streets for individuals and communities to enjoy.
Joined-up improvements to accommodate growth
London is growing and changing, with the city's population forecast to rise from 9 million people today to 10.5 million in 2041. We must find new ways to plan London's growth, including proposals like CS4 to encourage healthy and sustainable transport. CS4 is part of a package of planned and proposed improvements aimed at helping this part of south-east London accommodate expected growth, including the regeneration of Canada Water, recent improvements made to ease congestion at Rotherhithe Roundabout, and the proposed Rotherhithe to Canary Wharf river crossing.
Where would CS4 go?
The proposed route would run along Tooley Street, Jamaica Road, Evelyn Street and Creek Road, linking Bermondsey, Rotherhithe, Deptford and Greenwich.
Lower Road
This consultation does not include proposals for Lower Road, which will be consulted on at a later date. Lower Road is adjacent to Canada Water, an area that will see major regeneration and development in the next few years. To understand how these developments and future transport schemes would affect the existing road network, we have jointly commissioned a Strategic Transport Study with the London Borough of Southwark. When completed, this study will inform the design for Lower Road, ensuring that it meets the future needs of the community.
What is proposed for CS4?
Improvements for cycling
New two-way segregated cycle track on the north side of Tooley Street, Jamaica Road, Evelyn Street and Creek Road replaces some bus and general traffic lanes
Cycle track switches to the south side at the junction with Southwark Park Road to bypass Rotherhithe Roundabout
Proposals for the Lower Road section to be consulted on at a later date
Cyclists bypass traffic light controlled junctions at Abbey Street and Deptford Church Street
Cyclists are separately controlled by signals at all other junctions
Connection to proposed cycling Quietway 14 at Tanner Street (find out more about Tanner Street)
Road design and layout
Some general traffic lane replaced by new two-way segregated cycle track Redesigned and improved geometry of Rotherhithe Roundabout to encourage better lane discipline and assist all through movements
Left turn lane on Jamaica Road extended to reduce queueing time for buses and local traffic trying to access Brunel Road
Removal of some central reservation on Jamaica Road to accommodate new cycling facilities
Mini-roundabout replaces signalised junction at Oxestalls Road
Removal of centre line markings on some sections of Evelyn Street to improve road safety
Making Shad Thames one-way northbound to improve the performance of the junction and reduce pedestrian wait times
Banning the left turn from Jamaica Road into Bevington Street to provide a continuous eastbound bus lane and improve bus journeys
Making Cathy Street one-way northbound to remove through-traffic from residential roads, while allowing a new right turn into Cathay Street from Jamaica Road to improve local access
Making Marigold Street exit-only on to Jamaica Road to improve safety for all road users
Banning the right turn into Evelyn Street from Watergate Street and Deptford High Street, and banning the right turn into Deptford High Street from Evelyn Street
Change to buses
Some bus lane replaced by new two-way segregated cycle track on Jamaica Road, Evelyn Street and Creek Road
New eastbound bus gate on the Jamaica Road approach to Rotherhithe Roundabout to prioritise bus access to Lower Road
Changes to bus stop locations along Evelyn Street
Changes to some bus stop layouts, including new bus stop bypasses for cyclists (find out more about bus stop bypasses)
Improvements for walking
Five new signal-controlled pedestrian crossings, including three along Jamaica Road
Upgrades to existing pedestrian crossings including simpler 8-metre wide crossing outside Bermondsey Station
6-metre wide toucan crossing (for pedestrians and cyclists) outside Deptford Park Primary school
6-metre wide pedestrian crossing on desire line opposite Deptford High Street
Pedestrian crossing on the eastern arm of the Norway Street / Creek Road junction moved to the western arm and widened to 6 metres.
Pedestrian crossing time saving of over 1 minute expected outside Bermondsey Station and at the Jamaica Road junction with Tanner Street
Predicted impacts of our proposals
We are proposing major changes to the road layout to make cycling and walking easier, safer and more appealing. We have considered all road users throughout the design process so as not to have a disproportionate impact on any one group. This section summarises the impacts we predict our proposals to have on different road users.
General traffic and bus journey times
The reallocation of road space is expected to change some journey times and traffic movements. We have carried out traffic modelling to predict how the proposals might affect journey times and traffic movement through the area affected by the scheme. A summary of this analysis is available below:
We would actively monitor and manage traffic conditions following delivery of the scheme. We are investing in advanced traffic signal technology to allow us to better manage traffic depending on differing conditions at any given time, and we are working to improve road user information so people can make informed journey choices before they travel.
Parking and loading
Our proposals for CS4 include changes to the layouts of some of the parking and loading bays along the route. Double yellow lines (no parking at any time) would also replace single yellow lines along some sections of Evelyn Street and Creek Road.
During the consultation period, we will contact premises we think could be affected by these changes. If you think the proposals could affect you or your business, please contact us to let us know (contact details are at the bottom of this page). We encourage you to discuss these proposals with your suppliers.
Environment
Our proposals aim to improve the quality of life in the area by:
Reducing the dominance of motor traffic, allowing people to better enjoy the area
Improving pedestrian crossings and cycle facilities, to encourage more people to walk and cycle through the area
Protecting bus journey times to safeguard public transport as a mode of choice
Although not a traffic-generating scheme, our proposals would change how traffic moves around the area, which may result in some associated and localised changes in air quality and noise levels. Environmental surveys and modelling would take place as part of our ongoing evaluation of these proposals.
Air pollution is one of the most significant challenges facing London, affecting the health of all Londoners. As part of the plans for new measures to tackle London’s current poor air quality, we are consulting on proposals to bring forward the introduction of the London Ultra Low Emission Zone (ULEZ).
A number of other schemes to improve London’s air quality are planned, including taking steps to reduce air pollution from our bus fleet, reducing emissions from taxis and private hire vehicles, setting up five Low Emission Neighbourhoods, and expanding the electric vehicle charging network and making it simpler to use.
We are investing to make London’s streets healthy, safe and attractive places to walk and cycle. Enabling more journeys to be made on foot or by bike can help reduce private vehicle use and associated emissions. Read more about how we are creating Healthy Streets
Equalities
How we fulfil our obligations under the Equality Act 2010
We are subject to the general public sector equality duty set out in Section 149 of the Equality Act 2010, which requires us to have due regard to the need to eliminate discrimination, advance equality of opportunity and foster good relations by reference to people with protected characteristics. The protected characteristics are: age, disability, gender reassignment, marriage and civil partnership, pregnancy and maternity, race, religion or belief, sex and sexual orientation. As part of our decision-making process on the proposals for Cycle Superhighways, we have had due regard to any impacts on those with protected characteristics and the need to ensure that their interests are taken into account.
In considering the design of our streets, we closely consider the needs of all users throughout the design process. On significant infrastructure projects, such as Cycle Superhighways, we:
Complete Equality Impact Assessments (EQIAs) at the outset of the project, to review potential impacts on equality target groups, including disabled people
Carry out public consultations, including targeted engagement with specific users such as (among many others): Royal National Institute of Blind People, Guide Dogs, Age UK, Transport for All, and National Autistic Society
Ensure we comply with established guidance – such as the Design Manual for Roads and Bridges – which includes detailed requirements for disabled people
The EQIA completed for CS4 shows positive impacts for black and ethnic minority groups, females, disabled cyclists, and cyclists under 25 and over 65 years of age. Positive impacts have also been identified for disabled pedestrians, as the scheme involves a number of improvements to pedestrian facilities, including wider footways and new and improved crossings. Some negative impacts have been identified where footways are cut back or shared-use footway is introduced. However, the minimum 2-metre standard for footway widths has been maintained to allow two wheelchair users to pass safely. Kerb-protected cycle facilities, which lead to positive impacts for people with protected characteristics when they are cycling, work most effectively when they feature bus stop bypasses. Bus stop bypasses and their impacts are described below.
Bus stop bypasses
At bus stop bypasses, the cycle track continues behind the bus stop at carriageway level, providing continuous segregation from motor traffic for people cycling. Bus passengers access a waiting area by crossing the cycle track using a raised, marked crossing point. The waiting area would be at least 2.5 metres wide. Pedestrians would cross the cycle track at raised, marked crossing points to continue their journey.
Our research has found that bus stop bypasses are safe for all road users, including bus passengers. Routing cycle traffic away from the road is an effective way to create safe, attractive cycling facilities along bus routes. The risk of conflict between cycles and pedestrians has been found to be very low, while providing a dedicated crossing point for bus passengers and design features that encourage slower cycling help to make the bus stop area more comfortable for everyone to use.
Bus stop bypasses are used across Europe and there are a number of examples in operation or planned across the UK, including in Brighton, Cambridge and Manchester, as well as in London. We introduced some bus stop bypasses on the Cycle Superhighway 2 (CS2) extension between Bow and Stratford in Autumn 2013 and across other Cycle Superhighways in 2015-16.
We are continuing to engage with accessibility and cycling groups and carry out additional research into the type and layout of pedestrian crossings at bus stop bypasses. We have a dedicated working group overseeing on-street trialling of the use of zebra crossings over cycle tracks at bus stop bypasses. This group includes representatives from Transport for All, the Royal National Institute of Blind People, Guide Dogs, Age UK London, London TravelWatch, Cycling Embassy of Great Britain, Living Streets, the London Cycling Campaign and Cycling UK. We will incorporate findings of these further investigations, including the outcomes of discussions about the trial with the working group, into final proposals for CS4.
Find out more about bus stop bypasses
Tactile paving
We would use tactile paving on all crossings and traffic islands throughout CS4. Along the route, tactile paving would be designed according to Department for Transport guidance. Local standards would apply in the London Borough of Lewisham and the Royal Borough of Greenwich.
Accessibility for cyclists with disabilities
CS4 would be suitable for use by disabled cyclists using adapted cycles, such as hand cycles and tricycles. The designs adhere to the principles for inclusive cycling set out in our London Cycling Design Standards. Cycle tracks on CS4 would be as wide as possible and a smooth riding surface would be provided, with the entire cycle route to be resurfaced.
Next steps
We will analyse and consider all of the responses received to the consultation, and expect to publish our response early in 2018.
For the Lower Road section, we have jointly commissioned a Strategic Transport Study with the London Borough of Southwark to understand how developments and future transport schemes would affect the existing road network. When completed, this study will inform the design for Lower Road, ensuring that it meets the future needs of the community. Consultation on proposals for Lower Road will take place at a later date
Subject to the outcome of consultation and agreeing proposals with partner boroughs, we would aim to commence construction on CS4 in late 2018. We would plan construction carefully to minimise disruption to those who live, work and travel through the areas.
As part of this planning, we would coordinate closely with other construction works in the area, and consider alternative ways of working including advance works, weekends and evenings. We would also carry out an extensive communications and engagement campaign to ensure residents, businesses and others travelling through the works areas have the information they need to plan ahead and adapt their travel arrangements where necessary, reducing any impact on their journeys during the construction period.
Created by Sam Saunders // 1 thread
Vauxhall Bridge between Coronation Road and Cumberland Road has a channel provided for wheeling bicycles on one side of its stepped sections. The channel is so narrow and so close to the railings that a bike can only be wheeled along it at a severe tilt. In addition only one side has a channel so wheeling the bike in the opposite direction has to be done from the wrong side of the bike, making it even more awkward.