Norman Castle to Dane John - Connected Canterbury
Removal of wall, addition of cycle hub, and planters. Re-paving surfaces.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 1 thread
Removal of wall, addition of cycle hub, and planters. Re-paving surfaces.
Created by Gregory Williams // 1 thread
The plan appears to show that the proposed cycle hub will replace the existing cycle parking. I believe that the cycle hub is just for hire cycles, therefore it'd be a loss of capacity for non-hire cycles.
Created by Gregory Williams // 1 thread
Proposed changes to paving and addition of planters at St. George's Square. An opportunity to add cycle parking lost by the recent changes at St. George's Street the the north-west appears to have been missed.
Created by Gregory Williams // 1 thread
Proposals for changes to road and path surfaces, addition of cycle hub, planters, and trees. The pelican crossing is proposed to be retained. The cycle hub appears to be just for hire bicycles, without capacity for non-hire bicycles.
Created by Josh Grantham // 1 thread
23/03080/OUT | Outline application for demolition of existing structures and redevelopment for employment (office and laboratory) floorspace E(g)(i)(ii) alongside a new amenity building (including F2(b)(c)), country park and associated infrastructure with all other matters reserved for future determination apart from access, layout, scale. | Former Waste Water Treatment Facility Cambridge Road Hauxton Cambridgeshire CB22 5HT
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A project from Greater Cambridge Shared Planning to inform urban design.
Created by Josh Grantham // 1 thread
23/02696/FUL | Demolition of 3 residential properties (known as Fossdene, Winside and The Gables) and the erection of five residential buildings for postgraduate students as well as two storey and single storey extensions to The Knott for postgraduate accommodation and the provision of cycle and bin stores, landscaping and car parking including new boundary treatments. |Fossdene Whinside The Gables Mount Pleasant Cambridge Cambridgeshire CB3 0BL
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
sound+fury // 1 thread
Change of use from an office (Use Class E(g)(i)) to a state funded school (Use Class F1(a))
72 Hills Road Cambridge Cambridgeshire CB2 1LA
Cambridge
Application reference : 23/02904/PRIOR
Created by sarah // 0 threads
General overgrowth impinging on DNA path link to CBC; 2 bikes can no longer pass each other. Reported to CCC on 31st July.
Anon // 1 thread
Towards the west end of Love Lane, vegetation overhanging from the south does not allow an adult to pass (on foot or cycle) without bending. (Photo is looking west.)
Noticed on 13 July, confirmed still there 20 July.
Reported to Cambridgeshire County Council 19 July (ref 00438005). They closed the report 24 July, saying "The issue you raised with us is the responsibility of the landowner. Unfortunately we do not have records of who is responsible for this location and we are therefore unable to take any action."
(This area has been problematic previously -- see KW's reporting in March 2023 on the 'exclusionary barriers' thread. Not sure if exactly the same vegetation, but same general area.)
sound+fury // 1 thread
i) Demolition of 11-12 Burleigh Street and Abbeygate House, ii) Part demolition and alterations to the Grafton Centre, removal of existing facades, erection of new floorspace for life science use, new and replacement façades and shopfronts, provision of terraces at fourth floor level, installation of plant and enclosures, iii) Redevelopment of existing bus turning head and redundant service area to provide new hotel and leisure quarter, iv) New pedestrian access route from Christchurch Street to Burleigh Street, provision of cycle parking spaces, public realm and landscape improvements, v) Highway works to East Road providing new bus stops, pedestrian and cycle routes and other associated works.
Grafton Centre Fitzroy Street Cambridge Cambridgeshire
Cambridge
Application reference : 23/02685/FUL
Created by jack // 1 thread
The bushes/trees are pretty overgrown into the left side of the cycle path, meaning you have to move away from the edge at points, on an already narrow cycle track (fairly narrow for bidirectional travel, anyway).
Outline planning application for the erection of up to 38 Affordable Homes with associated access, parking and landscaping - all matters reserved except for Means of Access
Land South Of 44 Cambridge Road Stretham Cambridgeshire
East Cambridgeshire
Application reference : 23/00712/OUM
sound+fury // 1 thread
Concern about the bike/bin store for the CONDA application.
Created by Roxanne (CEO) // 1 thread
Cambridge City Council has launched its Environmental Improvement Programme (EIP) for 2024, which gives residents the opportunity to identify where they would like the council to fund small-scale improvements to the city’s streets and open spaces.
Cambridge residents are invited to put forward their ideas for the EIP through the council's online consultation platform. A total of £170,000 is available to be allocated to the proposed projects – up to £5,000 is available for local projects unless they are strongly supported in which case up to £10,000 could be made available. Up to £20,000 is available for projects that will enhance larger areas of the city.
sound+fury // 1 thread
They propose to add an eighth floor to Mayflower House, and to increase the cycle parking.
Created by wookey // 1 thread
New housing development of about 250 houses next to Barrington on the old cement works quarry land.
sound+fury // 1 thread
Change of use of the first floor only at 13-14 Burleigh Street, Cambridge from use falling within Class E (commercial, business and service) to two flats comprising one 1xbed unit and one Studio unit (Class C3 (dwellinghouse)).
13 - 14 Burleigh Street Cambridge Cambridgeshire CB1 1DG
Cambridge
Application reference : 23/01966/PRIOR
sound+fury // 1 thread
Created by cpax // 1 thread
Post removed , increased usage by cars .
Created by Robert Watson // 1 thread
Turning from Hills Road onto Glisson Road going east, there’s a “cycles only” lane on the left-hand side, with a concrete separate from traffic in the other direction. The camber is extremely steep in the cycle gap, and risks our cargo trike overturning. The barrier is well meant, but ultimately the steep camber means we have to enter on the wrong side of the barrier, which is less rather than more safe than not having a battier at all.
sound+fury // 1 thread
Created by sarah // 0 threads
The Heathfield Bridleway is generally a good piece of off-road provision that links Thriplow to Heathfield/Duxford whilst avoiding the A505. The sign is damaged; Cambs CC say it’s not their duty to repair/replace.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Stephan Matthiesen // 1 thread
A large number of brick strips have been installed across the path in Magdalene Glen in early 2017.
While these do nothing at all to deter fast cyclists, they are a real pain for slow cyclists, people with arthritic hands (due to the vibrations and need to grip the handlebar very strongly).
It is not clear if there has been any consultation about these measures. Neither Spokes nor anybody on the CEC forum seems to have been aware of the plans.
Created by Colin Wing // 2 threads
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by wookey // 2 threads
Out of the A1307 Linton Greenway consultation has come a plan for the section between Addenbrooke's roundabout and the Babraham P&R, which the county/GCP are keen to move forward. There was an initial invite-only consultation event on Thur 31st Jan for local residents/residents associations to comment.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Martin Lucas-Smith // 3 threads
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by Jon_B // 0 threads
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Stephan Matthiesen // 0 threads
Kirk Brae and Lasswade Rd at least up to Margiotta should be included in 20mph. It's very narrow, residential, and with many shops in Lasswade Rd.
It's also steep uphills and fast overtaking makes it very dangerous for cycling.
Created by MB // 1 thread
There is a useful but unmarked path from Queen's Road to Richmond Park and through to Sheen. It is used by pedestrians and cyclists & I have never seen it on any map! From Lower Grove Road, it takes you to the park via Bog Gate, or Sheen via Sheen Common.
If it were better marked on maps, better maintained & wider in places, it could form a useful section of Richmond's (paved, segregated, Dutch style?) cycling network.
Tom McKeown // 1 thread
Drivers ignoring the marked priority at Magdalene pinch point is a regular occurrence when faced with city bound riders. At times this can be very dangerous. Especially when large numbers of riders are forced into a very small gap between the vehicle and the bollards. I should imagine the situation is especially unpleasant travelling with small children. Also difficult to resolve with a wider cargo cycle, trailer or trike.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by Kevin Ablitt // 1 thread
As you can see in the photo there is a shared use path on river side of West End Rd just east of Bobby Robson bridge. But then where ? How far does it go ? It is certainly no good if you want to cross Princes Street- you cant unless you go up to the Burrel Road end of the bridge. And anyway once you get over Princes Street along Commercial Road and Grafton Way it is a narrow footpath which is not shared use.
It would be good to connect Bobby Robson Bridge and the Waterfront.
Directly and not by switching over to the other path and then over two toucans. Perhaps even a wide cycle crossing of the 4 lanes of Stoke St ? That would be brilliant.
Anon // 1 thread
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Peter Loader // 1 thread
This proposed Berry Lane Estate to Shepherd Primary School, Mill End cycle route follows:
* Chiltern Drive.
* Part of Shepherds Lane.
* Part of the south east path through King George V Playing Fields, Mill End.
* The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A key link for route 46 users, as well as people getting to/from Llanfoist village hall, is the strip of pavement on the north side of Merthyr Road. We believe there could be the width to allow this to be widened into a share-pavement allowing cyclists to avoid crossing the road twice in the space of a few hundred metres.
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.