Greater Anglia Cycle Strategy
Greater Anglia has just issued a consultation on cycles at stations and on trains
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by Al Storer // 4 threads
A citywide (and indeed beyond) problem is poor consideration given to the needs of cyclists and pedestrians during road works- eg "cylist dismount" sign use
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by aSemy // 0 threads
https://www.citizenspace.com/bristol/city-development/baldwin-street-cycle-safety-fund-scheme
Overview
The purpose of this scheme is to address the large number of crashes involving cycles on Baldwin St, at the junction with Queen Charlotte Street.
We propose extending the existing cycle track at Welsh Back and take it across the junction via a humped crossing. We have introduced a ‘floating bus stop’ to separate buses and cyclists. There will be a formal crossing point for pedestrians to access the stop from the footway.
A small number of parking places would be removed but loading, bus and taxi facilities are retained, although altered.
Created by Shaun McDonald // 0 threads
The legal pavement cycling is suddenly not allowed 3 car lengths before a cycle shop near this junction which has toucan crossings and cycle paths on all other sides of it. Why can't it be continued to the bike shop for a safe cycle route to/from the junction away from traffic?
Created by Shaun McDonald // 0 threads
The cycle cut through between Appold St and Worship St is often blocked by pedestrians or Taxis dropping off passengers. It's also too narrow, thus can only be used one way, and isn't suitable for higher levels of two way cycling.
Created by Jean Dollimore // 5 threads
Camden Council proposes major improvements to Cobden junction – the junction of Camden High Street with Crowndale Road and Hampstead Road at its southern end.
They propose the following measures:
- eliminate the unnecessary northbound road on the east side of the island
- gain extra footway space on the east side of the road (uses to include cycle parking, trees, seating)
- widen the footway outside Mornington Crescent Station
- safer, quicker and simpler pedestrian crossings
- improved link for cyclists to the Mornington Crescent quiet route (from Arlington Road).
- new ASL boxes with lead-in lanes on the approach to the junction from Eversholt Street, Crowndale Road and Hampstead Road.
- re-site the statue of Richard Cobden and the war memorial
Proposal for contraflow cycling on Crowndale Road:
A few months ago, we were shown designs for a contraflow on Crowndale Road between Hampstead Road and Bayham Street with some junction changes at the latter to accommodate it. Unfortunately, this was rejected by TfL on the grounds that it would delay buses. This consultation notes that the layout has been designed to accommodate the contraflow at a future date.
This consultation also says that in addition, alternative options for providing a west to east link are being explored at both Delancey Street / Pratt Street and Oakley Square. We need to encourage Camden to pursue these essential links. In the case of the latter, there is an urgent need to allow cyclists to make right turn right into Hampstead road from the southern end of Mornington Crescent.
See consultation on Camden Council website:
https://consultations.wearecamden.org/culture-environment/cobdenjunction
Created by Aidan Van de Weyer // 0 threads
The Hills Road / Regent Street axis of the Catholic Church junction was resurfaced overnight (28-29 August) as part of the junction upgrade.
Many of the damaged iron works (manhole covers, etc) have not been changed. Some are in a bad state and quite dangerous because they have worn smooth, sunk or tilted.
I have contacted the Traffic Signals team at CCC, as they seem to be responsible for the works, and they should be getting back to me.
If anyone else fancies having a go at finding out what is going on and whether anything can now be done, it would be very welcome.
Created by George Coulouris // 1 thread
For discussions on the design of the new website, following the CCC Committee decision to initiate the construction of a new CCC website.
A working party has been set up, consisting initially of George, Jean, Ben and Geoff.
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by Ben Edmonds // 1 thread
Redesign of street to include two-way for cyclists, one-way for motorists, light segregation and bus stop islands.
Martin Lucas-Smith // 1 thread
Changes to car parking in the Kite are proposed.
Cycle parking is not being included.
Created by Dan Doherty // 0 threads
Very narrow cycle lane between University Road and Violet Road and Broadlands Road. Encourages very close passes when cycling in the lane (with 10cm of your handlebars), or aggressive impatient driving if you cycle outside of the lane. Additionally to cycle within this cycle lane it is necessary to cycle closer to the kerb than the recommended 50cm from kerb (http://www.cyclescheme.co.uk/community/how-to/road-positioning)
Lane markings are extremely faded. Lane contains several drains.
No cycle lane would be better than the current cycle lane.
Created by Shaun McDonald // 0 threads
The railings here probably should be removed. They promote faster motor vehicle driving, as drivers think it's safer as nothing will walk out in front of them.
Created by Robin Heydon // 1 thread
Planning application for flats near the Busway Cycleway
Created by Martinn // 0 threads
There is a set of bollard which have been placed that prevent cycling as a family, in order to reduce car journeys. Negotiation without manhandling the Bike and dismounting is impossible when riding a Tandem, and requires even more effort when a Tag -along is connected. Can these obstructions be removed please
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Broken headlight glass from a couple cars has been there since 8th August
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by Shaun McDonald // 1 thread
Would it be possible to make the full length of Marchmont Street two way for cycling? The northern half doesn't seem to be now.
Created by Shaun McDonald // 0 threads
It's horrible to cycle along Old Street due to the number of cars/taxis/minicabs parked in the cycle lane. I usually find this a lot worse in the evening.
Created by Shaun McDonald // 0 threads
The toucan crossing for cyclists avoiding Old Street Junction are very slow to change for pedestrians and cyclists. Often people get fed up waiting and then dart across in a gap. Or once there is a gap, it takes until cars start appearing before they change.
If TfL is seriously interested in encouraging walking and cycling they need to change the timing of these lights so that they don't take forever to change.
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by WilliamNB // 1 thread
On Royal Parade, when traveling in an easterly direction, shortly before the pedestrian lights by the Theatre Royal there is a poorly repaired trench across the road.
In lane 2, the surface is reasonable, but in lane 1 the tar has shifted to create a severe and unmarked speed hump. This is dangerous to cyclists.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Marcus Howarth // 1 thread
see https://consultations.tfl.gov.uk/trams/sutton-link/?cid=sutton-link
Here's the overview from TFL:
Overview
We are consulting on proposals for a new, direct and quicker transport link between Sutton and Merton. We have called this the Sutton Link.
The Sutton Link would create a high-capacity route for people travelling between Sutton town centre and Merton using zero-emission vehicles. It would connect with other major transport services into central London and across south London, including National Rail, London Underground, existing tram and bus services. It would make journeys by public transport quicker and more attractive, and reduce the need for trips by private car.
Many of the neighbourhoods along the proposed routes have limited public transport options. The Sutton Link would support new homes being built and would improve access to jobs, services, major transport hubs and leisure opportunities across both boroughs and beyond.
Our work is at a stage where we would like to know your views about three potential routes. We are considering a tram or ‘bus rapid transit’ (BRT) for the Sutton Link and would also like to know your views on this.
BRT is similar to a tram but runs on road segregated from traffic where possible, not on rails, and carries fewer people in each vehicle. A full explanation is included below in the section titled ‘About trams and bus rapid transit’.
From LCC -
general principles would be ensure this doesn’t negatively impact cycle routes, that there are good routes to the stations/stops, that any places where cyclists will be crossing tracks are designed carefully with latest materials to avoid tramlining incidents, that the space comes from private car lanes.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Influencing positive changes in road user behaviour is key in providing a safe road environment for the community and although changes in road layout can’t fully resolve this, redesign of our streets can help. Therefore, Chrisp Street and the surrounding areas are currently being invested in with aims to improve road safety for the local community.
Please give us your feedback by filling in the survey (below the map). You may also like to add a comment to our interactive map of the wider area.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by Simon Munk // 1 thread
Havering council said:
"We wrote to you on 21st October setting out a series of safety proposals for Romford town
centre comprising of a 20mph zone for all streets within the Romford Ring Road (including
some traffic calming measures) and some changes to road markings on various
roundabouts on the Ring Road itself.
We sent out over 2,500 letters to people in the area, but only received 8 responses with 4
of these being from residents. This was reported to the Council’s Highways Advisory
Committee on 6th December where the decision on the scheme was deferred in order for
further discussions to take place with ward councillors.
As a result of these discussions, it has been decided to provide a further period of
consultation and any other comments received shall be reported to the Highways Advisory
Committee on 7th February 2017.
We would therefore like to extend the opportunity for you to provide any comments you
may have to the postal address above, via our email address highways@havering.gov.uk
or through an online form which we have provided at www.havering.gov.uk/consultations."
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Kate Ravilious // 0 threads
Like Fossgate, High Petergate needs to be made two-way for cyclists. Otherwise cyclists travelling north are forced to either get off and walk (not an option for disabled cyclists) or join the busy St Leonard's place via a difficult junction.
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by David K // 1 thread
At present this is a footpath but it could be widened onto the land owned by Network Rail in order to allow a shared use path.