Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
-
-
21/01065/FUL: 26 new private homes, Sandy Lane, Cambridge
21/01065/FUL | Construction of 26 new private homes | Land Adj Sandy Lane Cambridge Cambridgeshire
-
21/01142/FUL: alterations to create 3 new apartments on each floor, 65 Regent St
21/01142/FUL | Extensions and alterations to ground floor retail unit, conversion and extension of first floor offices and part of ground floor to create 3 new apartments on each floor. |
65 Regent Street Cambridge CB2 1AB
-
21/01219/FUL: erection of 2 storey dwelling, 72 Canterbury Street
21/01219/FUL | Demolition of existing garages and erection of a 2 storey dwelling and associated car parking |
Land On The South East Side Of 72 Canterbury Street Cambridge CB4 3QF
-
21/01151/FUL: 14 new dwellings, Ditton Walk, Cambridge
21/01151/FUL | Erection of 14 dwellings, including 4 affordable dwellings, and associated works including alterations to access to the site.
139 Ditton Walk Cambridge Cambridgeshire CB5 8QD
-
21/00946: erection of 3bed house, 17 Peverel Road, Cambridge
21/00946/FUL | Erection of three bedroom house in garden | 17 Peverel Road Cambridge Cambridgeshire CB5 8RN
-
21/01082/FUL: Change of use to a large HMO, 70 Coleridge Road
21/01082/FUL | Change of use to a large HMO (7 persons) (sui generis). | 70 Coleridge Road Cambridge CB1 3PJ
-
21/00915/REM: 26 new dwellings, Willingham, CB24 5EU
21/00915/REM | Reserved matters application for the approval of details of appearance, landscaping, layout and scale following outline planning permission S/2921/15/OL (Erection of 26 Dwellings including 10 Affordable Units & Ancillary Access Arrangements (All matters reserved apart from access)).
The outline planning application did not seek permission for EIA Development.
Land To The Rear Of 1B Over Road Willingham Cambridge Cambridgeshire CB24 5EU
-
Consultation: Sidney Street and Hobson Street, Cambridge
A consultation has opened concerning the potential and future of three adjoining sites at Sidney St and Hobson St in Cambridge city centre. The sites are:
- 16 – 17 Sidney Street;
- 18 – 19 Sidney Street; and
- 21 Hobson Street.
-
20/01992/FUL: 41 new dwellings, Toft, CB23 7EN
20/01992/FUL | Erection of 41 dwellings, including two self-build plots and associated development | Bennell Farm West Street Toft CB23 7EN
-
20/02504/S73: Varsity Hotel and Spa, 24 Thompsons Lane
The Varsity Hotel and Spa is seeking approvals from the planning committee
-
No cycling space on Marine Parade
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
-
Snettisham Circular Routes?
Not a problem - just looking for feedback please!
-
Dangerous cycle lane - Green Lanes/ Green Dragon Lane
I cycle on this cycle lane daily and have nearly been knocked off my bike on multiple occasions as I cross Green Dragon Lane on the cycle lane by cars turning from Green Lanes into Green Dragon Lane (see the cursor on image). I think this needs to be looked at as a priority as it is only a matter of time before somebody is injured. Perhaps deviating the cycle lane up Green Dragon Lane slightly or putting a pelican crossing in would help. Many thanks
-
Road safety and reducing carbon emissions
I was surprised that Rupert Moss-Eckart said that one of his interests is Formula One on Radio Cambridge this morning. For all his good words and intentions I personally feel that this kind of pursuit encourages speed by some members of our community and is damaging to our environment from a pollution point of view. Watching cars go round in circles seems to be a very boring thing to watch to me.
-
210753 - 1B House
Outline application for a proposed new two storey 1 bedroomed house. All matters reserved.
-
210797 Headgate Building
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
-
Glisson Road and Hills Road junction
How should the junction with Glisson Road and Hills Road be improved to improve safety for people cycling, walking and driving?
-
V16 Butt lane
Crow Ideal solution for Butt Lane
-
V51 Underpass to Landbeach road
This is an ideal solution to the flow at Landbeach road.
Mobility needs from Landbeach, highlighted in Milton community are to provide cycle crossing at the A10 for school kids and parents. -
Burlington Gardens, Sackville Street, Vigo Street experimental traffic order
Westminster City Council made an experimental traffic order on 8 February 2021, which will have effects including to:
"(a) prohibit all vehicles from entering or proceeding in Vigo Street, between Savile Row and Sackville Street (except pedal cycles which will be able to travel in both directions);
(b) introduce one-way working south-westbound in Burlington Gardens, between Savile Row and Cork Street (except pedal cycles);
(c) reverse the one-way working in Sackville Street so that it applies in a northwestbound direction"
-
Northern Gateway Sports Hub
Opening in Spring 2021, the Northern Gateway Sports Park is a 76 acre site providing both indoor and outdoor sport and leisure activities.
-
202771 - Turner Rise McD
Alterations to car park with the erection of a freestanding restaurant with drive-thru facility, car parking, landscaping and associated works, including Customer Order Displays (COD), Goal Post Height Restrictor and Play Frame.
-
Ipswich and Harwich Road Roundabouts
The scheme will see the replacement of the double roundabouts located at Ipswich Road and Harwich Road with a single roundabout at each location. The carriageway between Ipswich Road and Harwich Road junctions will also be widened to accommodate two formal lanes in each direction. The scheme will include upgrading existing pedestrian crossings to signal controlled crossings and general improvements to the current off-carriageway cycle and footway provisions.
The scheme will improve the performance of these two key intersections on the A133 and renewal of the infrastructure will reduce maintenance costs. It will also improve the existing highway assets including the strengthening of two retaining walls, one between Ipswich Road roundabout and the adjoining railway line and another between Ipswich Road roundabout and the Waitrose Car Park. The Scheme has also supported the Cowdray Bridge refurbishment, now being progressed separately through the structures capital maintenance programme.
-
New cyclepath
The current hardcore path is often not usable for walking / cycling during wet weather. The path is difficult to pass through due to water on the surface. A new tarmac option would be much better. A new drop kerb on Bell Court and widened access would also help improve this route. Note the path gives access to a local football pitch as well as a local park. Cycling and walking in the area would increase if this issue was fixed.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
Railway bridge at Ockford Road
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
-
Barrier to trikes and trailers
this old fashioned barrier on a major cycleway needs a rethink
-
SMALL SCHEMES, BIG CHANGES - BARNSTAPLE
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
-
St Leonards Streatham Consulation
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled. -
Consultation on Ashton Rd / Coronation Rd
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_viewSuggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing -
Proposed Trial Changes to Haverstock Hill and Rosslyn Hill
Camden proposes the following measures:
- New cycle lanes, protected by flexible wands, will be installed on both sides of Haverstock Hill and Rosslyn Hill (between Prince of Wales Road and Belsize Lane).
- On the northbound side, cyclists will have to use the existing bus lane from Belsize Avenue on – the bus lane times will be made 24/7.
- All parking and loading spaces are to be removed from this section of Haverstock and Rosslyn Hill to make space for the cycle lanes. Some will be replaced in side roads.
- All pedestrian refuges at informal crossings are being removed to make room for the cycle lanes. Five of the existing ‘uncontrolled’ crossing points on Haverstock Hill will be replaced with four new zebra crossings and one new signalised crossing .
- Shared use bus boarders will be deployed at the eight bus stops – bus stops will be moved into the carriageway to allow for the cycle lane to continue next to the kerb.
- At the junctions with England’s Lane and Pond Street ‘pedestrian countdown’ facilities, ‘early release’ for bikes and extended ‘Advanced Stop Lines’ will be provided subject to approval from TfL
- Timed loading bays (Mon-Sat 10 am - 2pm) along (on southbound side opposite Steeles Road Haverstock Hill and full time loading bay opposite Belsize Lane.
- If the consultation is agreed, cycle parking will be added at the shopping parades.
- New cycle lanes, protected by flexible wands, will be installed on both sides of Haverstock Hill and Rosslyn Hill (between Prince of Wales Road and Belsize Lane).
-
insufficient visibility due to solid building site boundary
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
-
Bike Parking Shortage at Hills Rd 6th Form College
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
-
Thames bridges counter-terrorism barriers
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
-
Cycle to school path: St Michaels' footpath
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
-
Holy Trinity School - inaccessible by bike for children
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
-
Haselbury Neighbourhood Statutory Consultation
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
-
Kingston to Barham cycle route
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
-
A316 Cycle Lane - Priority over side roads - Part2
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads -
Waitrose: missed opportunities for cyclists
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site? -
Make use of flashing front lights illegal again
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
-
tram accidents on Sheffield Road
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
-
Rumble strips instead of paint
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
-
A316 car park entrance
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
-
Brixton Liveable Neighbourhood - Winter 2020 engagement
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
-
Blake Hall Road crossing of A414 between North Weald and Ongar
Blake Hall Road is an important and pleasant north-south route for cyclists and is often used by groups avoiding the busy roads in North Weald and in Ongar. However, crossing the A414 can be very difficult due to fast moving traffic from both directions.
-
A1 Archway Road
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
-
Parking on uphill side of Potters Bank
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
-
No cycling space on Marine Parade
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
-
Joining Bath Spa Uni with Bristol-Bath Railway Path
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.