Engaging with election candidates
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 31 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by David Earl // 1 thread
'Except cycles' plates missing on No Left/Right turn signs at Mackenzie Road and Stockwell Street, and shared-use signs missing on Perne Road between Natal Road and Brookfields
Created by David Earl // 2 threads
The new franchise for the Kings Cross rail line started recently. We have been sent a letter of introduction.
Created by MJR // 1 thread
Basil Drive, Coriander Road and Bay Walk are residential streets that probably should be a 20mph zone, at least to avoid sat-nav routing cars that way in preference to Rosemary Way.
Created by Hester Wells // 1 thread
"Following a request for a vehicular access outside of 27 Tenison Avenue it is
proposed to revoke a 5 metre length of Residents Parking Bay and replace it with
double yellow lines.
If you wish to object to any of these proposals you should send the grounds for
objection in writing to policyandregulation@cambridgeshire.gov.uk to reach us by no
later than 19th September 2014 quoting reference PR0147."
Created by David Butler // 1 thread
Extensive package of measures which "aims to transform the accessibility and connectivity to and around Stockport town centre.
The plan considers access by all modes of travel and specifically aims to ease congestion for buses and general road traffic, as part of an ambitious vision and development framework for investment in the town centre"
Created by John Chamberlain // 3 threads
Camden are consulting residents, cyclists and others on their plans to extend the Royal College Street cycle facilities to the north, across Camden Road and up to Kentish Town Road. If it is approved, we think this will be a great improvement as it will provide protected two-way cycling all the way. Later there are plans to extend it south to Kings Cross.
We hope you will respond to Camden in support as there may be objections from residents, especially as it results in some loss/relocation of parking.
Details of the proposals can be found on Camden’s website at:
https://consultations.wearecamden.org/culture-environment/royal-college-street-walking-and-cycling-improveme
For cyclists, the main proposals are as follows:
- Two way cycling all the way up and down Royal College Street with no need to use St Pancras Way or Camden Street.
- Protected northbound and southbound cycle lanes with no loading or parking within the cycle lanes.
- A separate green phase for N-S and S-N bound cyclists at Camden Road.
The difficult areas are the Camden Road crossing, which we think Camden have handled in an effective and innovative way, and the southbound split at College Gardens, where motor traffic has to bear left but cyclists go straight. This is not easy to handle without the danger of left hooks, but we think that the suggested solution, which involves road narrowing and a raised junction to slow motor vehicles, is the best option.
Please feed your comments to us via the threads on this issue, or by email to john@camdencyclists.org.uk
Our response needs to be in by 3rd October so we'll take comments on board until the 28th.
Created by Tom B // 2 threads
Previously, there was an Advanced Stop Line on Kew Gardens Road (B353) where it joins Kew Road (A307). The junction was recently resurfaced, which removed the ASL markings, and they have not been replaced. I have attached a Google Streetview photo showing the ASL that was previously present.
The ASL marking was very useful, as the junction can become gridlocked in rush hour, so that only cycles can take advantage of the green signal from Kew Gardens Road without blocking the junction. Cyclists therefore need the space to be able to safely wait at the front of the queue.
It would be great if the ASL markings could be restored as soon as possible. If they have been removed for a reason, then I would like to understand what the justification is.
Created by George Coulouris // 4 threads
Full details of the consultation are at:
https://consultations.tfl.gov.uk/cycling/northsouth
closing date for comments is 19 October 2014.
Camden Cyclists we propose to send a response to this consultation on behalf of our members. This will focus only on the part within Camden (the section between Charterhouse Street and Euston Road - as detailed on the map attached). But note that the alignment of the route north of Greville Street is not agreed between Camden and TfL and is not formally considered a part of the consultation.
So it makes sense to have two discussion threads for the sections in Camden south and north of Greville Street.
Created by James Gilbert // 1 thread
The Astra Zeneca developers (I assume) have installed a chicane made from two plastic roadwork blocks, plus a little "Chicane Ahead" warning sign on the down slope of the guided busway path as it approaches Francis Crick Avenue.
I assume that the idea is to slow down cyclists, but I don't see why this is any more necessary than it was before their building site was created. I think it will make collisions between cyclists, or between cyclists and pedestrians, more likely.
Created by Clive // 1 thread
Herts County Council proposal to make currently two-way Vicarage Road a one-way street between j/w Scammell Way and Hagden Lane and provide a ''kiss and drop'' lay-by in Scammell Way. The one-way section will be for northbound traffic only (ie travelling towards the town centre).
For further details see:
http://www.watfordobserver.co.uk/news/11422333.Plans_to_make_part_of_Vicarage_Road_one_way_and_bring_in_parking_scheme_branded__ill_conceived__and_a_safety_risk/
Herts County Council will have a display at Watford Cycle Hub
====date and time to be confirmed====
Place: Watford Cycle Hub
The Pavilion
Chaffinch Lane
Watford
WD18 9QD
Map: http://www.openstreetmap.org/?mlat=51.6428&mlon=-0.4165#map=14/51.6428/-0.4165&layers=C
Created by David Butler // 1 thread
Salford Council/Urban Vision consultation on CCAG scheme. "The proposed cycle improvement between Station Road in Irlam and Astley Road in Cadishead will enable better sharing of the road space by all users and improve conditions for cyclists and pedestrians. Cycle parking facilities will be provided and cycle symbols on the road will be marked to highlight the presence of cyclists. Line markings and the construction of build outs and central reserves are proposed to narrow the road and reduce the overall speed of vehicles"
Created by David Butler // 1 thread
Salford Council/Urban Vision consultation on this CCAG scheme. "A new cycle lane will be implemented along Liverpool Street between Langworthy Road and Cross Lane, linking the neighbouring residential areas to employment and educational opportunities at Salford Quays, MediaCityUK, the University of Salford and Manchester City Centre"
Created by David Butler // 1 thread
Salford Council/Urban Vision consultation on CCAG funded scheme. "This route will provide new cycling facilities on Silk Street and North George Street, linking route one to the University of Salford and improving onward cycling links to Salford Quays and the regional centre, through the existing wider cycle network."
Created by David Butler // 1 thread
Consultation by Salford Council/Urban Vision on CCAG funded scheme. "This will provide a new cycle lane along the length of Great Clowes Street and Blackfriars Road, which will link the residential area of Broughton to Manchester city centre. Where possible the route will be segregated from traffic"
Created by David Butler // 1 thread
Consultation about cycling in Lyme Park, carried out by the National Turst
Created by David Butler // 1 thread
New cinema and car park next to Debenhams in Stockport centre. New open space on Bridgefield Street and Prince's Street. One of the objectives is "to provide enhanced public transport routes,cycle facilities and pedestrian access". Issues: cycle parking, shared space, link to wider cycle network.
Created by David Earl // 1 thread
This bus gate is a continuing problem. We first raised this when it was first installed in 2007. The problem hasn't gone away.
http://www.camcycle.org.uk/newsletters/70/article6.html
Created by George Coulouris // 1 thread
You probably remember that we began a new 'Quick Wins' campaign in November 2013.
http://camdencyclists.org.uk/camden/campaigns/quick-wins
I asked members for their suggestions for (very) minor improvements throughout the borough that will make cyclists feel better catered for. These are examples of the type of changes that Camden felt could be implemented without consultation of local residents/businesses:
⁃ dropped kerbs
⁃ obstructive barriers (i.e. anti-motor cycle barriers)
⁃ stretches of poor road surface
⁃ Feeders into ASLs that are too short or non-mandatory
The response from members was very good and we were able to assemble a list of suggestions and submit it to Camden in November 2013. Camden responded by assigning an officer to work on the entire list and he has worked hard to progress them.
The web page linked above includes a table showing the list of 17 suggestions that were submitted to Camden, updated to show the five suggestions that we know for sure to have been completed (those table entries are in italic with completion date and a photo). There may be one or two other items in the list that have been completed - I haven't been to check all of them recently ;-) I would be very grateful to anyone who can give me up-to-date information on the status of the other items.
Several other minor changes that we have suggested, outside the 'Quick Wins' list have also been completed this year.
As far as I know Camden still intend to progress most of the remaining items. It is worth noting that some of these relatively minor changes received significant 'push-back' from locals, making the process slower and more expensive than it might have been.
We and Camden are still very positive about this campaign. Camden are now asking us for a set of 'Phase 2' suggestions. The criteria for this are likely to include the types of changes suggested in the first phase but also include some new ones.
We are still clarifying with Camden the new categories that can be classified as 'quick wins' (i.e. can be implemented without consultation). They may include:
⁃ widening cycle lanes or converting them to mandatory (i.e. replacing a dashed with a solid white line). In some cases this might be a first step towards installing lightweight segregation.
⁃ widening existing cycle lanes where there is limited traffic impact.
⁃ widening bus lanes to 4.5m to allow safer overtaking of buses by cycles and vice-versa.
⁃ adding cycle lanes that link up sections of bus lane.
⁃ trial lane closures to provide better space for cycling.
⁃ more 2-way cycling on side roads.
I would be grateful for your feedback, commenting on the categories of changes or preliminary suggestions for actual changes.
I plan to construct a new list for submission to Camden in October, but I would be grateful for concrete suggestions by mid-September.
It helps if you can provide a link to the relevant location on Google maps. A photo is even more helpful.
George C.
Between the A10 cycleway and the Hardwick Road cycleway is a complex of sluggish crossings, narrow tracks and dangerous junctions which currently (early 2014) take 7 minutes if you wait for all the crossings. Of course, the red bike lights are only advisory, but then riders and drivers are hindered by the poor visibility at many of the crossings, plus some drivers mistakenly believe that riders should dismount and walk across, to the point of harassing riders who ride across.
Unsurprisingly, some commuters riding through this junction have developed a number of innovative and, eh, "interesting" approaches to it. This shouldn't be necessary. This junction between the Highways Agency's A47 and Norfolk County Council's A10 and A149 should be cycle-proofed as a high priority, before the planned housing at West Winch and North Runcton.
Created by MJR // 2 threads
The Parish Council have prepared the plan with the help of local residents, businesses and interest groups. A draft was prepared in February 2014 for consultation locally and with statutory bodies. When fully approved, it will take the place of many North Somerset Council planning policies which cover Long Ashton Parish. It will contain policies to:-
· protect areas of Local Green Space from development
· protect the open countryside between Long Ashton and Bristol
· protect and improve recreation and community facilities
· support the shops, services and businesses within the village
· reduce traffic speeds through the village and make it a more pedestrian friendly environment.
North Somerset Council http://www.n-somerset.gov.uk is currently preparing an Employment-Led Delivery at Weston-super-Mare Supplementary Planning Document(SPD). The SPD provides guidance on how the Council applies Core Strategy policy CS20 Supporting a Successful Economy.
Created by Rohan Wilson // 1 thread
Bike Bus Explorer tows a 30-bike(?) trailer. Picks/drops bikes at Cambridge Station, Brooklands Avenue, Barton Rd then a linear route to Wimpole, and a ring from Arrington via Hatley, Gamlingay, Gransdens, Longstowe.
It leaves the station Sunday and Bank Holidays at 09:00, 11:30, 14:30, 17:00. Last return to Cambridge arrives 19:12.
A leaflet gives info about the rural destinations including Wildlife Trust sites, and a map showing the bus route, stops and suggested rural cycle rides. Operations exclude Christmas Day, Boxing Day, New Year's Day, suggesting it operates all year.
Created by Stefan Kaye // 1 thread
For several weeks now, ever since part of the surface of the path was repaired, the cycle detector loops at the crossing of Maids Causeway from Midusummer Common to Fair Street have not been working. This means that cyclists using the crossing have stop and press the button unless the road is already completely clear. Does anyone know any more about this problem, and to whom should a complaint be addressed?
Created by Hester Wells // 3 threads
The Papworth Hospital is moving to Addenbrooke's.
There is a public consultation until 26th August 2014, ahead of a planning application in September.
http://www.papworthhospital.nhs.uk/content.php?/about/new_papworth_hospital/public_consultation
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Henry Lancashire // 1 thread
Info from survey:
"The London Borough of Brent and Sustrans are working together to explore ways in which the Kilburn High Road and surrounding area shown could be improved. Together we want to better meet the needs of the community to make it a more desireable place to walk, cycle and enjoy being in.
...
London Borough of Brent and London Borough of Camden will submit a joint application to Transport for London's Liveable Neighbourhood programme in November 2018, which will incorporate suggestions made by the community."
Brent Cyclists are forming our own response, to be sent by end of October 2018.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Created by Roxanne (CEO) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.