21/02954/FUL: change of use from office to flat. 190 Green End Road
21/02954/FUL | Change of use from office to flat. | 190 Green End Road Cambridge CB4 1RN
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02954/FUL | Change of use from office to flat. | 190 Green End Road Cambridge CB4 1RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03304/FUL: Retention of existing dwelling, erection of 1no. linked 2 bedroom dwelling and 1no. 1 bedroom detached dwelling, along with a new parking bay accessed from Suez Road and associated works
108 Suez Road Cambridge CB1 3QD
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial closures that were installed in Red Lion Street and Dane Street in June 2020.
They also propose to:
- create a pedestrian and cycle only zone on Red Lion Street south of the junction with Princeton Street with new trees and cycle parking
- stop southbound motor traffic on Bedford Row from accessing Sandland Street, introducing a wide build-out with new trees, seating and cycle parking
Created by Alex Jenkins // 1 thread
https://talk.towerhamlets.gov.uk/lsshadwell
The Liveable Streets Shadwell proposal aims to improve the look and feel of the Shadwell area whilst making it easier, safer, and more convenient to get around by foot and bike.
Overview map of proposals in Shadwell. Please click on the image to download a larger copy.
These proposals have been developed on feedback based on residents, businesses and the local community and aim to benefit all road users. This is achieved by improving accessibility to walking and cycling for all so that those with disabilities, people of all ages, cultures and genders can feel safe. Additionally, the reduction in through traffic in the area will improve the safety and air quality for all.
Our proposals include:
What is being proposed?
Five schemes have been developed to improve walking and cycling, create better public spaces, discourage through-traffic and improve air quality (click on each scheme to view details):
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Residents in particular parts of Cambridge are being asked to put forward proposals for improving open spaces and play areas via Cambridge City Council’s 2021 S106 funding round.
sound+fury // 1 thread
The application is for former offices to be turned into housing.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
According to the Combined Authority's Forward Plan (July 2021), the Transport and Infrastructure Committee are due to consider proposals for funding a Segregated Cycling Study for Holme to Sawtry and make recommendations to the Combined Authority on 8th September 2021. The lead officer is Paul Raynes, Director of Delivery and Strategy, and the decision will be made by Mayor Dr Nik Johnson.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02888/FUL | Change of use to a large HMO (8 persons)
87 Ditton Fields Cambridge CB5 8QQ
sound+fury // 1 thread
From Idox: Demolition of all buildings on site and erection of 1no. detached dwelling and 8no. 1 and 2 bed apartments Demolish Existing Bungalow and replace with 1No. Detached 2 Storey Dwelling at front of site. Demolish all outbuilding to rear currently used a flooring company and replace with 8No. 1 and 2 Bedroom Apartments. | 125 Scotland Road Cambridge CB4 1QL
Created by Jean Dollimore // 1 thread
TfL is planning to upgrade two of the existing signalised pedestrian crossings on Camden Road to Toucans.
These crossings are:
Rochester Road to Rochester Square
The crossing lines up with Rochester Square (south side of Camden Road) so TfL is proposing a section of shared-use footway on the north side of Camden Road from Rochester Road to the crossing.
Cantelowes Gardens to Cantelowes Road
The crossing almost lines up with the footway exit from Cantelowes Road (past the planter known locally as the ‘billiard table’). TfL is proposing a section of shared-use footway on the north side of Camden Road between the western exit from the Gardens and the crossing.
Details
Camden is being left to make the connections at both ends of the two crossings. These are tricky e.g. cycling isn’t even allowed in Cantelowes Gardens at the moment. But those issues are outside the scope of this consultation.
Toucans are signalised crossings where cycles and pedestrian share the surface of the crossing as well as an area of footway on both sides of the road. They are supposed to be at least 4m wide. (LTN 2/95).
The Rochester Road crossing width will be increased to 4m. The crossing at Cantelowes Road is already over 3.5m wide. In both case the island width will be increased to 2.5m
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02293/FUL | Construction of 2no 1bed dwellings.
15 Garlic Row Cambridge Cambridgeshire CB5 8HW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02862/FUL | Two storey rear extension and loft conversion of existing dwelling to create additional accommodation and development to side of existing dwelling to create two self contained 1-bed flats
15 Tillyard Way Cambridge CB1 8QT
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from single dwellinghouse (class C3) to 11 person house in multiple occupation (sui generis) including provision of cycle and refuse store
1 Selwyn Gardens Cambridge CB3 9AX
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02759/FUL: Demolition of existing buildings and erection of new commercial/retail floor space, 48 new residential apartments and houses, new car parking areas, new hard and soft landscaping, bin and bike stores and associated works
Colville Road Phase 3
Land At Colville Road
And Fishers Lane
High Street
Cherry Hinton
Cambridge Cambridgeshire CB1 9HT
Created by Jean Dollimore // 1 thread
Sandall Road Safe and Healthy Streets scheme
In May 2020, as a trial, bollards were placed across Sandall Road by the width restriction to prevent motor traffic from cutting through residential streets between Camden Road and Kentish Town Road or Leighton Road.
Camden is now consulting on whether the trail scheme should be made permanent. Drawing here.
The consultation and the Online Survey are here
https://consultations.wearecamden.org/supporting-communities/sandall-road/
Savernake and Cressy Road Safe and Healthy Streets scheme
In May 2020, as a trial, bollards were placed across Savenake Road by the entry to Saverrnake Bridge to prevent motor traffic from cutting through Constantine Road and Savernake Road to avoid the signals at the junction of Agincourt Road and Mansfield Road.
Camden is now consulting on whether the trail scheme should be made permanent with some enhancements - three separate water absorbing planting areas to include three new trees. Plans.
They are also proposing two-way cycling on Cressy Road between Agincourt Road and Constantine Road – a very welcome extension of the recently implemented two-way cycling on Cressy Road south of Agincourt Road.
And an electric vehicle charging point.
The consultation and the Online Survey are here
Created by Roxanne (CEO) // 1 thread
Anglian Water and Cambridge City Council, working with U+I and TOWN, are exploring the vision for a new sustainable urban quarter at the heart of the proposed new district of North East Cambridge.
The project is currently called the Core Site, North East Cambridge (shown on the attached map). The aim is to deliver over 5,000 new homes on the Core Site over the next 20 years, along with shops, workplaces, education, community and leisure facilities, and open spaces. This opportunity is enabled by the proposed relocation of Anglian Water’s Cambridge Waste Water Treatment Plant, with the support of Homes England, and the Cambridgeshire and Peterborough Combined Authority.
Cambridge City Council is currently bringing forward an Area Action Plan (AAP) for the wider district, within which the Core Site is located, which could deliver a total of 8,000 new homes in ‘an inclusive, walkable, low-carbon new city district with a lively mix of homes, workplaces, services and social spaces, fully integrated with surrounding neighbourhoods’. The Core Site has a key role to play in delivering this vision.
The landowners of the Core Site - Anglian Water and Cambridge City Council - have selected U+I, in partnership with TOWN, as master developers for the site will be working to bring forward proposals for the site and, eventually, a planning application.
Created by Steven Moseley // 1 thread
Conversion of existing first floor office accommodation into two 2 bedroom apartments along with ground floor refuse and cycle storage
Created by Jean Dollimore // 1 thread
On the 7th June 2021 Transport for London launched a trial on the use of rental electric scooters across some parts of London.
E.g. in Ealing, Hammersmith and Fulham, Richmond, Kensington and Chelsea and Tower Hamlets (ride through only) and Canary Wharf.
The City of London and Westminster plan to join the trial on the 5th July 2021.
Camden Council is now consulting on taking part in this trial.
Service operators Dott, Lime and Tier.
The e-scooters would be unlocked through the operator’s app on the user’s mobile phone and would be required to be parked within a designated parking bay at the end of a journey.
They would be permitted on public highways in Camden and cycle lanes and will share cycle contraflow facilities.
They would not be permitted on pavements or any public pedestrian space.
Riders would need to be 18 years of age or over and have a full or provisional driving licence to rent an e-scooter
Speed would be limited to 12.5mph. GPS managed speeds..
They would be parked on street in assigned dockless hire parking bays, GPS enforcement of using bays
Created by Finlay KM // 1 thread
Cambridge Biomedical Campus (CBC) is currently in the process of developing a new wayfinding system for the communal, external spaces within the campus. This system will include new maps and signage to improve navigation in public spaces for staff, patients and visitors to the site and help to reduce stress when visiting the campus. In order to fully understand how the campus is currently used and the key issues, we would like to gain your invaluable input.
Note that the new wayfinding system will be focussing on the public space rather than the internal space of individual buildings, please limit your feedback to your experience of finding your way through the external public space on campus. Thank you in advance.
Created by Roxanne (CEO) // 1 thread
The county is planning to put up bollards to stop drivers/cars from using the unofficial carpark at Skater's Meadow. This carpark has long been a source of danger to people walking and cycling to Granchester Meadows.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A thread for cycling issues and consultations in and around St Ives
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Part of the Darwin Green development.
Created by KW // 1 thread
Substantial proposed development next to the Technology Park on Fulbourn Road (ARM).
181 documents.
Lots of bike parking, mostly in double stackers.
Created by Gabriel // 1 thread
The plans for the improved shared pavement between Waterbeach and Milton have been added to the planning portal. Planning application: S/0559/17/COND29
Also please note the A10 SLO for a reduction of the speed limit on these sections from 50mph to 40mph.
https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-slo--reference-number-pr--------a---and-some-surrounding-roads-in-the-vicinity-of-milton--landbeach-and-waterbeach-18-0
From looking at the plans my main concerns
Narrow sections - less than 3m wide, which is not LTN 1/20 compliant and very unambitious seeing as 11,000 homes are being built in Waterbeach.
The separation from the carriageway is also very unambitious at 0,5m and not a properly segregated verge. 0,5m is the absolute minimum suggested in LTN 1/20. 1m is the minimum recommended.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Starting a thread about this application here so we can continue on from the previous planning list discussion.