Media Strategy
Under this issue are assembled various initiatives relating to our work with the media, representation in the media, access to media etc
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by velocipedus@gmail.com // 9 threads
Under this issue are assembled various initiatives relating to our work with the media, representation in the media, access to media etc
Created by cobweb // 1 thread
59 en suite rooms, gym, 4 one bed flats proposed by Lucy Cavendish.
Created by Gregory Williams // 1 thread
Both ends of the new cycle path between George Roche Road and Stuppington Lane in Canterbury do not have properly dropped kerbs. This makes joining / leaving the cycle path dangerous. Properly dropped kerbs should be installed.
Additionally the visibility to the SW at the junction with Stuppington Lane is poor due to a hedge immediately adjacent to the junction. The sightline needs to be improved here, since road users approaching from the SW will not be able to see cyclists and pedestrians about to emerge from the path. Likewise cyclists and pedestrians turning into the path will not be able to see anybody else on the path that's approaching the junction.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Kevin Ablitt // 1 thread
Total re-design of this important junction.
Very complicated junction with 4 routes entering/leaving .
Covers very large area.
Proposal is for one large oval to replace existing double roundabout.
The junction has an existing reported and unreported high level of vehicle/cyclist crash.
An ideal opportunity for Ipswich to have a radical design which protects the more vulnerable road users ?
Please post your opinion here.
Created by Kevin Ablitt // 0 threads
The straight through route at this roundabout seems to encourage people to assume priority and go against roundabout rules. This makes the r'bout particularly difficult for cyclists to negotiate safely.
This crash was luckily a minor one- http://www.eadt.co.uk/news/update_road_clear_after_collision_between_car_and_cyclist_in_ipswich_1_1738795
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by Shaun McDonald // 0 threads
When heading south along this track you miss a sign telling you to turn left, which means that you head straight on and potentially get confused and turn left to go back on yourself instead of going straight on and thus get lost.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by LeedsCyclists // 0 threads
Consultation on proposals for Harrogate Road. Option 2 is better for cycling as it includes a Northbound cycle lane.
The consultation closes on 10 December so please vote now!
https://consult.leeds.gov.uk/leeds/KMS/elab.aspx?noip=1&CampaignId=460
Created by Gregory Williams // 0 threads
There are no cycle route signs at the junction of North Holmes Road with Havelock Street in Canterbury despite two advisory on-road cycle routes meeting at this point. Cycle route signs should be installed to allow people to more easily follow and discover Canterbury's cycle network.
Created by Gregory Williams // 1 thread
The cycle link between Brymore Road and Forrester Close, Canterbury has two sets of cycle barriers. These make it difficult to cycle and impossible to take a tandem cycle along the route. They also cause difficulties to people pushing prams and those in wheelchairs and using mobility scooters. The cycle barriers should be removed.
Created by Gregory Williams // 1 thread
Planning application CA//10/00295 to provide three warehousing units at Marshwood Close, Canterbury has been essentially complete for a number of months now. However the cycle parking provision detailed in the plans has not been installed. This cycle parking provision needs to be installed to offer people working and visiting these units a location to securely park their bikes.
Created by Gregory Williams // 0 threads
The cycle parking at the bus station end of Canterbury Lane is full and has several bicycles parked against the railings. This means that people don't have places to park their bicycles and either choose not to cycle or park their bikes where they may cause a hazard or appear unsightly to others.
The cycle parking at the side of Wilkinsons, nearing the Zoar Chapel, does have spare capacity, but is poorly used because it has a low level of passive surveillance. Some of these stands could potentially be moved towards the bus station end of Canterbury Lane to satisfy the demand there.
Created by Gregory Williams // 1 thread
The cycle parking near the loading area at Rose Lane, Canterbury is often full or near full. This means that people don't have places to park their bicycles and either choose not to cycle or park their bikes where they may cause a hazard or appear unsightly to others.
Created by Gregory Williams // 1 thread
The cycle parking at Tesco's Whitstable store is of poor quality and badly placed to be hidden behind a trolley park. This means that it is not particularly well used or discoverable and adversely affects cycle security.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Shaun McDonald // 1 thread
Overview
Barclays Cycle Superhighways are cycle routes running between outer and central London. They provide new cycle lanes and other dedicated infrastructure so that cyclists can enjoy swift, direct, safer journeys around the city. We have developed plans for a new route and would like to hear your views.
What are we consulting on?
We’re proposing to introduce a new cycle route between New Cross Gate and Victoria. Barclays Cycle Superhighway Route 5 (CS5) would run via Peckham, Camberwell, Kennington and Vauxhall.
Proposed road layout changes
The new route would bring substantial changes to the road layout to improve safety for cyclists, including:
More space for cyclists and buses, through reallocation of road space
New mandatory cycle lanes, all at least 1.5 metres wide
Improvements for cyclists at 52 junctions, including new Advanced Stop Lines, cycle feeder lanes, and speed reduction measures
An innovative cycle ‘early-start’ facility at Vauxhall Bridge Road/Millbank to help cyclists get ahead of traffic
Banning some turns for cars and lorries to reduce conflict with cyclists
Extended 20mph speed limit in New Cross
Other benefits
Over 3,000 new cycle parking spaces along the route
Cycle safety checks
Free cycle training
Industry-recognised safety training for drivers of large goods vehicles
Proposed route
Click here to download a larger map of Barclays Cycle Superhighway Route 5.
How do I view the proposals and have my say?
Detailed proposals
Find out more about the proposals for each section of the new route by clicking the links below.
► Section 1 – Vauxhall Bridge Road north (Neathouse Place to Charlwood Street)
► Section 2 –Vauxhall Bridge Road south (Charlwood Street to Millbank)
► Section 3 – Vauxhall Bridge Road / Millbank junction
► Section 4 – Vauxhall Bridge
► Section 5 – Vauxhall Gyratory
► Section 6 – Kennington Oval / Harleyford Street
► Section 7 – Oval Junction
► Section 8 – Camberwell New Road
► Section 9 – Camberwell Green (consultation in January 2013)
► Section 10 – Peckham Road west (Benhill Road to Southampton Way)
► Section 11 – Peckham Road east (Lyndhurst Way to Peckham Bus Station)
► Section 12 – Peckham High Street / Queen's Road west (Peckham Bus Station to Carlton Grove )
► Section 13 – Queen's Road (Carlton Grove to Pomeroy Street)
► Section 14 – Queen's Road east (Pomeroy Street to Pepys Road)
► Section 15 - New Cross (and other local cycling improvements in Lewisham)
To request a paper copy of our proposals, please email barclayscyclesuperhighways@tfl.gov.uk
Public Exhibitions
You can also view the plans at our public exhibitions. Dates and locations are given below.
Saturday 8 December 11:00-15:00, Peckham Library, SE15 5JR (view map)
Tuesday 11 December 15:00-19:00, Oval House Theatre café, SE11 5SW (view map)
Wednesday 12 December 15:00-19:00, Parnell House, SW1V 1LW (view map)
Created by Rohan Wilson // 1 thread
Cambridge Science Park though in the northern edge of the city, is administratively in South Cambs.
I propose to attach a thread relating to a new planning application for the Bard Pharma site, northeast corner.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by TMiles // 0 threads
St Michael's Road can be a useful local route for west-bound cyclists avoiding the central junction in Headingley and its approach roads, dominated by queuing traffic or parked cars.
The current configuration could be improved to allow cyclists approaching the junction to cross directly from St Michael's Rd into the cycle box immediately in front of the traffic lights at the northern extremity of Cardigan Road.
A dedicated traffic signal, coordinated with the parallel pedestrian crossing (to the extreme right of the image), would allow cyclists to cross from the island in the foreground to the advanced stop line in the far lane.
These improvements would require very little actual ground work, instead making use of smarter signal control. Further adjustments to the sequencing could see cyclists granted a synchronized left turn into Kirkstall Lane.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by T Harris // 1 thread
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Roxanne (CEO) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Belle Vue Road is very steep for a recommended cycle route."
It's marked on the Ipswich Cycle Route Map.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Lewisham Cyclists // 1 thread
Royal Borough of Greenwich consultation on improvements to road junction at Blackheath Gate of Greenwich Park for Quietway 1 extension.
Consultation closes 19th April 2019.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Heather Rainbow // 1 thread
A proposed cross country route from North Waltham via Level lane and farm tracks and the ROW to Kempshott and the Roman road. Parts of the route are ROWs on footpaths and need upgrading to restricted byeway and parts are private tracks which could be permissive paths. Some of the land crossed has been registered on the SHEELA as available for development and some is on the boundary of Hounsome fields and Kennel farm.
It is proposed that this route is adopted as part of the North Waltham Neighbourhood plan so that CIL and section 106 money can be used to develop it.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by Mike Comerford // 1 thread
Those of us living in the area marked have no safe access to the cycle network in order to cycle in and out of Dumfries. There are many keen cyclists in this area (as evidenced by the Toirthorwald Cycle Sportive for example).
I live with my family in a cluster of houses close to the A75 (Mouswald Banks) end of Linns Road. There are a number of cyclists at this location and we wish to cycle to Dumfries for work and for social / leisure reasons.
Our Options are:
- the A75 - definitely not safe
- to Torthorwald then along the A709 - narrow, full of heavy trucks, no pavement and very unsafe
- through Torthorwald, across the A709, onwards to Tinwald and then onto the A701 towards Dumfries until able to join the Caledonian Cycleway at Locharbriiggs. This stretch of the A701 is narrow and full of heavy trucks. Where there is a pavement it is too narrow to cycle along it. This is also a long way round to get to Dumfries.
The best solution would be to create a cycle path from Torthorwald along the A709 and through Heathhall woods to connect with the cycle network. This would serve Torthowald, Collin and surrounding hamlets. There is land along the side of the A709 to allow space to make a cycle path.
The shortest in terms of building new infrastructure, would be to make a cycle path along the A701 from the Tinwald road end to Locharbriggs. However space at the roadside along the A701 is very limited, and the route is a long way round for the communities from Torthorwald and Collin.
Building a cycle path along the A75 is an unlikely and unattractive proposition and would cause disruption along a major Trunk road.
Active travel is a priority for the Scottish Government to increase physical activity and reduce traffic emissions. Funding is available through Sustrans.
'Sustrans Scotland's Community Links programme provides funding for the creation of infrastructure that makes it easier for people to walk and cycle for everyday journeys. The programme is funded by Transport Scotland and has funded hundreds of projects across Scotland since 2010.
Through the Scottish Government's Programme for Government 2017-18, the active travel budget has been doubled to £80 million per year, from 2018-19. Community Links will help deliver a key action from this by supporting projects that make our towns and cities friendlier and safer places for people to walk and cycle.'
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by Shaun McDonald // 0 threads
Further to http://www.cyclescape.org/issues/928-paper-mill-lane-alterations-planning-application I think it would be useful to campaign for a cycle and walking link from the site through to the retail park with major supermarket and other amenities, and also other links to that western part of Ipswich.
In my quick skim through the planning application I've not seen any consideration to this route.
Created by Charles Martin // 1 thread
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"