S/2060/13/FL Closure of level crossing, replacement with footbridge
Network Rail planning application for replacement of level crossing with footbridge
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Richard Moss // 1 thread
Network Rail planning application for replacement of level crossing with footbridge
Created by Paul L // 1 thread
Between the practically traffic free road through Bushy Park and the quiet roads of Hampton is the busy High Street. This could be a route for all cyclists by segregation as a two-way widened shared footway and conversion of an existing pelican to a toucan crossing.
Created by Paul L // 0 threads
Burtons road has been part of the borough cycle network usually acting as a quiet parallel to Queens Rd. Unfortunately growth of traffic has led to it being a rat-run at peak times despite numerous road humps. As parking leaves space for only one vehicle this makes it unpleasant to cycle.
Created by Gareth Evans // 0 threads
This roadworks is very extensive. There are many cones. However this lorry just blocks not only the lane but the sight lines just next to St Kilda avenue
Created by David Earl // 2 threads
The new flats at the fire station seem to be attracting delivery vehicles to unload in the cycle lane at the west end of East Road. The wide lane here is separated from the road by cross hatching. Should we ask for physical segregation on this short length, e.g armadillos. Would delivery vehicles still bump over them to park are make matters worse to get round them? Would a barrier be effective?
Created by vlejd // 2 threads
The marked lengths of the path has several breaking points (legally dismounting is obligatory), but for no good reason. Needs some paving and marking. Preferably convert to 2-way, there's plenty of space.
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by aSemy // 1 thread
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by Jenine // 1 thread
We need some cycle racks outside the Asda store here. I've asked Asda but they say it's up to the Council.
Created by Shaun McDonald // 1 thread
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
The road between Hogg End Lane and Three Cherry Trees Lane is closed to all traffic. It should be opened to cyclists to provide a convenient route to the Maylands industrial estate and NE Hemel from the Redbourn Road.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by BrianInBeeston // 1 thread
There have been tacks thrown on the path in this area which cause punctures. Residents have put up signs saying 'no cycling'. This is a defacto bridleway & has been used as such as long as anyone can remember. A local resident has made a witness statement to this effect which is being dealt with by Nottinghamshire County Council rights of way officers.
Created by Claydon & Whitton Parish Council // 0 threads
Cyclists using footpath between Newell Rise & Church Lane Claydon, past bus stop. Potentially dangerous for pedestrians particularly waiting for buses.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
Route along St Albans Road providing a direct link between St Albans and Sandridge. This would connect to the footpath/bridleway conversion from Sandridge to No-Man's land and to a potential route from No-man's land to Wheathampstead providing a route from St Albans to Wheathampstead.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by Andrew Clegg // 1 thread
The excellent cyclepath alongside St Mary's stadium joins onto Melbourne Street via an awkward and narrow gap which is often blocked by cars. This is annoying for regular users as well as making it harder for people to follow the NCN23.
Created by Andrew Woodward // 0 threads
There is room for more bike parking here - to encourage people to stop fly parking on the railings of the bridge.
Created by Andrew Woodward // 0 threads
Cycling north down church rd; and wanting to go east on the A316, cyclists can avoid Richmond Circus by makin a right turn onto St. Johns Rd. However, this right turn is on a bend and there are frequently queues of north bound traffic that obscure the view of oncoming vehicles until you reach the bend - see streetview here http://goo.gl/maps/dvlKe ; coupled with a downhill gradient cyclists are tempted to cut across Church Rd at this point at speed despite poor visibility.
Reversing the direction of the Larkfield Rd / St Johns Rd one way system would allow northbound cyclists to make a right turn into Larkfield rd to cycle round and pick up the A316 - with much better view of oncoming traffic. Coming the other way, westbound cyclists heading for Richmond Station could then use St Johns Road to get to Richmond Station - which is slightly shorter and easier route.
Created by Andrew Woodward // 0 threads
Sandpits Rd Ham is closed to through traffic, creating an opportunity for a quiet cycling route. However the closure has been made with a bench and a kerb that would obstruct anyone wanting to cycle between Sandpits Rd and the rest of Ham. This could easily be replaced by bollards.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Created by Andrew Woodward // 1 thread
This short stretch of cycletrack links Leybourne Park to Cumberland Rd - its very narrow and has street furniture in the path, making pretty much unusable.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?