More cycle parking needed near Clocktower Square area of Canterbury
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Shaun McDonald // 1 thread
Overview
Barclays Cycle Superhighways are cycle routes running between outer and central London. They provide new cycle lanes and other dedicated infrastructure so that cyclists can enjoy swift, direct, safer journeys around the city. We have developed plans for a new route and would like to hear your views.
What are we consulting on?
We’re proposing to introduce a new cycle route between New Cross Gate and Victoria. Barclays Cycle Superhighway Route 5 (CS5) would run via Peckham, Camberwell, Kennington and Vauxhall.
Proposed road layout changes
The new route would bring substantial changes to the road layout to improve safety for cyclists, including:
More space for cyclists and buses, through reallocation of road space
New mandatory cycle lanes, all at least 1.5 metres wide
Improvements for cyclists at 52 junctions, including new Advanced Stop Lines, cycle feeder lanes, and speed reduction measures
An innovative cycle ‘early-start’ facility at Vauxhall Bridge Road/Millbank to help cyclists get ahead of traffic
Banning some turns for cars and lorries to reduce conflict with cyclists
Extended 20mph speed limit in New Cross
Other benefits
Over 3,000 new cycle parking spaces along the route
Cycle safety checks
Free cycle training
Industry-recognised safety training for drivers of large goods vehicles
Proposed route
Click here to download a larger map of Barclays Cycle Superhighway Route 5.
How do I view the proposals and have my say?
Detailed proposals
Find out more about the proposals for each section of the new route by clicking the links below.
► Section 1 – Vauxhall Bridge Road north (Neathouse Place to Charlwood Street)
► Section 2 –Vauxhall Bridge Road south (Charlwood Street to Millbank)
► Section 3 – Vauxhall Bridge Road / Millbank junction
► Section 4 – Vauxhall Bridge
► Section 5 – Vauxhall Gyratory
► Section 6 – Kennington Oval / Harleyford Street
► Section 7 – Oval Junction
► Section 8 – Camberwell New Road
► Section 9 – Camberwell Green (consultation in January 2013)
► Section 10 – Peckham Road west (Benhill Road to Southampton Way)
► Section 11 – Peckham Road east (Lyndhurst Way to Peckham Bus Station)
► Section 12 – Peckham High Street / Queen's Road west (Peckham Bus Station to Carlton Grove )
► Section 13 – Queen's Road (Carlton Grove to Pomeroy Street)
► Section 14 – Queen's Road east (Pomeroy Street to Pepys Road)
► Section 15 - New Cross (and other local cycling improvements in Lewisham)
To request a paper copy of our proposals, please email barclayscyclesuperhighways@tfl.gov.uk
Public Exhibitions
You can also view the plans at our public exhibitions. Dates and locations are given below.
Saturday 8 December 11:00-15:00, Peckham Library, SE15 5JR (view map)
Tuesday 11 December 15:00-19:00, Oval House Theatre café, SE11 5SW (view map)
Wednesday 12 December 15:00-19:00, Parnell House, SW1V 1LW (view map)
Created by Rohan Wilson // 1 thread
Cambridge Science Park though in the northern edge of the city, is administratively in South Cambs.
I propose to attach a thread relating to a new planning application for the Bard Pharma site, northeast corner.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Shaun McDonald // 1 thread
Further safety improvements at Bow roundabout
Overview
Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions.
Why We Are Consulting
As part of this work, we have developed proposals to further improve safety at Bow roundabout.
What we’re proposing and why
Bow roundabout is a key junction for cyclists travelling between central and east London.
Cycle Early Start
A cycle early-start would operate at the traffic signals on the westbound approach to Bow roundabout.
This would provide a dedicated green light to allow cyclists to wait ahead of other traffic before moving onto the roundabout.
A new mandatory cycle lane on the westbound approach would allow cyclists to get to the roundabout entrance without having to filter through traffic.
The early-start area would be 18 metres deep, so there's a clear space for cyclists in front of any traffic.
This cycle early-start would improve safety, due to the reduced risk of conflict between cyclists travelling straight ahead and vehicles turning left. It would also provide a quick and direct route through the roundabout for cyclists.
The eastbound early-start was completed in June 2012. Our provisional monitoring to date shows that the eastbound early-start has been effective in reducing the left turning conflict risk that it was designed to address. It also shows that the cycle lane on the approach is well-used, with significantly fewer cyclists using the footway than before. We will continue to monitor and analyse the operation of these facilities.
Cycle Bus Stop By-Pass
TfL is proposing to introduce a new cycle lane around the back of the bus stop on the approach to the roundabout to help cyclists get ahead of other traffic and reduce the risk of conflict between cyclists and buses pulling in and out of the bus stop.
To accommodate the new cycle lane, the bus lay by would be filled in so buses would stop on the carriageway instead. .
Please click here to see the map for further information on the proposals.
We continue to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Bow area.
We intend to begin work at the roundabout in January 2013. We’ll write to residents and businesses nearer the time to advise on the timing and impact of construction work.
https://consultations.tfl.gov.uk/betterjunctions/bow_roundabout/consult_view
Created by velocipedus@gmail.com // 12 threads
Resources, opportunities, ideas and opinions about bicycle culture in Cambridge
Created by Rohan Wilson // 2 threads
Next meeting is Thursday 6 Dec at Trumpington Village Hall
(Informal Drop-In 15:30 - 18:30, followed by Forum 19:00 - 20:30)
Though the above page indicates it's about residential developments, Addenbrooke's was covered in a presentation on previous 6 Sep meeting. Bell School was not covered.
The main discussion was around schools and young people.
Created by cobweb // 32 threads
e.g.
https://www.gov.uk/government/news/cash-boost-to-get-england-cycling--2
Govt announces £20 million for cycling infrastructure improvements.
Marshall reveals plan for 1,500 homes
http://www.cambridge-news.co.uk/News/New-plan-for-1500-homes-27112012.htm
Created by George Coulouris // 1 thread
Camden are contemplating a re-design of this junction (the one adjacent to Mornington Cresent Station). We hope to get in early and try to ensure that the junction and its surrounding streets are made as safe and pleasant for cycling as possible.
This CycleScape issue is intended as a forum for discussion of improvements or a total redesign.
Martin Lucas-Smith // 2 threads
There are rumours that the AJC will be scrapped.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jim Chisholm // 5 threads
There is a suggestion of a group looking at issues for those cycling in the A10 corridor between M11 J11 and Royston. This is, in part about cycling along the corridor, but mainly about access between villages and access to rail stations. Of course the A10 north of Cambridge has LSTF money, but there are currently few funds available for improvements in this area.
Created by David Earl // 1 thread
Road closures - but will cycle parking be OK?
Created by velocipedus@gmail.com // 1 thread
Forwarded message:
I noticed that half of the bicycle shelter was fenced off, and I wondered whether we may be getting some new racks. In Connect I read the Trust was considering two tier bike racks so I was half expecting we would get these. Today however I learnt that the area will be transformed into a smoking shelter! Is this true?
I think it is fair to state 30% of the people working in the S-block cycle into work. Losing half of our cycle parking facilities is not very helpful. The area is heavily used and often overflowing with bikes.
If the area will indeed be turned into a smoking shelter, can you please explain why this decision was made and why it was not communicated to the staff concerned?
This is outrageous and a good press story. Robin - are you up for this?
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions. As part of this work, we have developed proposals for further safety improvements at the junction of Battersea Park Road and Havelock Terrace. This follows the introduction of a new signalised pedestrian crossing and cyclist Advanced Stop Line at the junction in June 2012.
Why We Are Consulting
About the proposed changes:
Our review of the current junction layout showed that the two narrow general traffic lanes on Battersea Park Road southbound mean that cyclists are sometimes squeezed towards the kerb by motorists. It also identified conflict between cyclists and motorists merging across lanes when approaching the junction southbound from Battersea Park Road.
Our proposed improvements have been designed to address the above issues. They include:
A new central cycle lane to help cyclists turning right from Battersea Park Road into Prince of Wales Drive. This would mean two lanes of traffic on the southbound approach from Battersea Park Road instead of three. These proposals may mean a slight increase in journey times at busy periods.
One wider southbound general traffic lane on the Battersea Park Road exit instead of two narrow ones. This would reduce the likelihood of cyclists being squeezed against the kerb by motorists
A new traffic island at the junction of Prince of Wales Drive to segregate westbound cyclists and motorists
New sections of eastbound and westbound mandatory cycle lane on Prince of Wales Drive to provide more space for cyclists. The eastbound cycle lane would replace one of the general traffic lanes on the approach to the junction
Widening the existing mandatory cycle lane on Battersea Park Road (northbound) to provide more space for cyclists
Removing the existing yellow box marking from the junction, as the proposed new lane layout would mean it was no longer needed.
Please click here to see the attached map for further information on our proposals. We plan to start work in late December 2012.
How to comment on the proposals:
Please let us know your views completing the online consultation form below by 30 November 2012.
About the Better Junctions programme:
TfL is making it easier and safer for people to cycle in London. As part of this work, we’re meeting with a number of different organisations to review and improve junctions on the Barclays Cycle Superhighways and the Transport for London Road Network (TLRN). We’re planning a variety of improvements, ranging from initial upgrades at some locations, to more substantial and innovative redevelopment at others. Please see www.tfl.gov.uk/betterjunctions for more information.
https://consultations.tfl.gov.uk/betterjunctions/battersea-park
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Barriers, so many barriers, most of which should be removed.
Created by Fran Graham // 3 threads
TfL say:
We want your views on proposals to transform roads in Bermondsey, Rotherhithe, Deptford and Greenwich to make cycling and walking easier, safer and more appealing.
Cycle Superhighway 4 (CS4) would provide a continuous segregated cycle route between Tower Bridge and Greenwich, along with new pedestrian crossings, improved public spaces and a host of other improvements aimed at creating a more attractive environment for all users and accommodating the area’s future growth. This consultation does not include proposals for Lower Road, which will be consulted on at a later date (find out more).
CS4 would form part of London’s expanding network of Cycle Superhighways, an important part of the Mayor’s draft Transport Strategy and Healthy Streets Approach, which aim to encourage walking, cycling and public transport, making London greener, healthier and more pleasant.
Summary of proposed changes
Our proposals for CS4 include:
Two-way segregated cycle track on Tooley Street, Jamaica Road, Evelyn Street and Creek Road, providing a dedicated space for people who want to cycle
Five new signal-controlled pedestrian crossings and upgrades to over 20 existing pedestrian crossings, making it easier and safer to cross the road
Building on the recent short-term improvements at Rotherhithe Roundabout by redesigning the roundabout to improve safety as part of our Safer Junctions programme.
Installing a new eastbound bus gate on the Jamaica Road approach to Rotherhithe Roundabout, giving buses priority at the roundabout and improving bus access to Lower Road
New and improved public spaces at Deptford High Street and Rotherhithe Roundabout, including new paving and trees
New traffic restrictions, including banned turns on some side roads along Jamaica Road and at Deptford High Street
Changes to some bus stop layouts and locations, including new bus stop bypasses for cyclists (find out more about bus stop bypasses)
Why are we proposing CS4?
Around 3,500 trips are already being made daily by people cycling along the A200. In addition, this route has some of the highest numbers of pedestrian numbers in London. CS4 is designed to help us meet the target set out in the Mayor’s draft Transport Strategy of changing the way people choose to travel so that, by 2041, 80 per cent of all trips in London are made by walking, cycling or public transport, up from 64 per cent today.
Improving safety
Safety is one of the main barriers to cycling in London. Between September 2013 and August 2016, there were 93 recorded collisions involving cyclists and 49 recorded collisions involving pedestrians along this section of the A200. Our research shows that, were the route safer, more journeys could be made on foot or by cycle.
CS4 would separate cyclists from motor traffic by providing kerbed cycle tracks along its length. At major junctions, cycles would be separated from motor traffic using cycling-specific traffic light phases to reduce the risk of collisions. Our proposals also include major safety improvements at Rotherhithe Roundabout, which was identified as a priority for changes as part of our Safer Junctions programme.
Encouraging active travel in south-east London
Cycling is now a major mode of transport in London. There are more than 670,000 cycle trips a day in the capital, an increase of over 130 per cent since 2000. The introduction of the East-West and North-South Cycle Superhighways has seen a significant increase in cycling as a mode of transport along those routes.
An emerging network of Cycle Superhighways exists in north, south and east London, but none yet in south-east London. Our proposals would bring a high-quality cycle facility to south-east London, encouraging more people to start cycling. Our analysis shows that sections of Tooley Street and Jamaica Road are among the top one per cent of areas for cycle demand in London, while the entire CS4 route is in the top five per cent.
Improving facilities for cycling and walking along the proposed CS4 route would not only benefit those who currently walk and cycle, but could also have a positive effect on public health by increasing the levels of physical activity in the area. Our research shows that sections of the proposed route are in the top one per cent of London’s road network for its potential to switch from vehicles to cycling as a means of transport. The majority of the route is in the top five per cent. There is also great potential to encourage people to switch from making short vehicle trips to walking.
These proposals form part of the Mayor of London’s plan for Healthy Streets. This is a long-term vision to encourage more Londoners to walk and cycle by making London’s streets healthier, safer and more welcoming. Currently, only 34% of Londoners take 20 minutes of physical activity on any given day. The new cycle facilities and pedestrian improvements are designed to help encourage more people to use active and sustainable modes of transport.
Improving places
Our proposals would help connect Bermondsey, Rotherhithe, Deptford and Greenwich, linking important amenities and facilities, making them more pleasant places to live, work, shop and spend time. We would install new seating areas and cycle parking to provide space for people to rest and spend time in these town centres, along with other improvements such as new plants and trees. Our proposals aim to create more welcoming and inclusive streets for individuals and communities to enjoy.
Joined-up improvements to accommodate growth
London is growing and changing, with the city's population forecast to rise from 9 million people today to 10.5 million in 2041. We must find new ways to plan London's growth, including proposals like CS4 to encourage healthy and sustainable transport. CS4 is part of a package of planned and proposed improvements aimed at helping this part of south-east London accommodate expected growth, including the regeneration of Canada Water, recent improvements made to ease congestion at Rotherhithe Roundabout, and the proposed Rotherhithe to Canary Wharf river crossing.
Where would CS4 go?
The proposed route would run along Tooley Street, Jamaica Road, Evelyn Street and Creek Road, linking Bermondsey, Rotherhithe, Deptford and Greenwich.
Lower Road
This consultation does not include proposals for Lower Road, which will be consulted on at a later date. Lower Road is adjacent to Canada Water, an area that will see major regeneration and development in the next few years. To understand how these developments and future transport schemes would affect the existing road network, we have jointly commissioned a Strategic Transport Study with the London Borough of Southwark. When completed, this study will inform the design for Lower Road, ensuring that it meets the future needs of the community.
What is proposed for CS4?
Improvements for cycling
New two-way segregated cycle track on the north side of Tooley Street, Jamaica Road, Evelyn Street and Creek Road replaces some bus and general traffic lanes
Cycle track switches to the south side at the junction with Southwark Park Road to bypass Rotherhithe Roundabout
Proposals for the Lower Road section to be consulted on at a later date
Cyclists bypass traffic light controlled junctions at Abbey Street and Deptford Church Street
Cyclists are separately controlled by signals at all other junctions
Connection to proposed cycling Quietway 14 at Tanner Street (find out more about Tanner Street)
Road design and layout
Some general traffic lane replaced by new two-way segregated cycle track Redesigned and improved geometry of Rotherhithe Roundabout to encourage better lane discipline and assist all through movements
Left turn lane on Jamaica Road extended to reduce queueing time for buses and local traffic trying to access Brunel Road
Removal of some central reservation on Jamaica Road to accommodate new cycling facilities
Mini-roundabout replaces signalised junction at Oxestalls Road
Removal of centre line markings on some sections of Evelyn Street to improve road safety
Making Shad Thames one-way northbound to improve the performance of the junction and reduce pedestrian wait times
Banning the left turn from Jamaica Road into Bevington Street to provide a continuous eastbound bus lane and improve bus journeys
Making Cathy Street one-way northbound to remove through-traffic from residential roads, while allowing a new right turn into Cathay Street from Jamaica Road to improve local access
Making Marigold Street exit-only on to Jamaica Road to improve safety for all road users
Banning the right turn into Evelyn Street from Watergate Street and Deptford High Street, and banning the right turn into Deptford High Street from Evelyn Street
Change to buses
Some bus lane replaced by new two-way segregated cycle track on Jamaica Road, Evelyn Street and Creek Road
New eastbound bus gate on the Jamaica Road approach to Rotherhithe Roundabout to prioritise bus access to Lower Road
Changes to bus stop locations along Evelyn Street
Changes to some bus stop layouts, including new bus stop bypasses for cyclists (find out more about bus stop bypasses)
Improvements for walking
Five new signal-controlled pedestrian crossings, including three along Jamaica Road
Upgrades to existing pedestrian crossings including simpler 8-metre wide crossing outside Bermondsey Station
6-metre wide toucan crossing (for pedestrians and cyclists) outside Deptford Park Primary school
6-metre wide pedestrian crossing on desire line opposite Deptford High Street
Pedestrian crossing on the eastern arm of the Norway Street / Creek Road junction moved to the western arm and widened to 6 metres.
Pedestrian crossing time saving of over 1 minute expected outside Bermondsey Station and at the Jamaica Road junction with Tanner Street
Predicted impacts of our proposals
We are proposing major changes to the road layout to make cycling and walking easier, safer and more appealing. We have considered all road users throughout the design process so as not to have a disproportionate impact on any one group. This section summarises the impacts we predict our proposals to have on different road users.
General traffic and bus journey times
The reallocation of road space is expected to change some journey times and traffic movements. We have carried out traffic modelling to predict how the proposals might affect journey times and traffic movement through the area affected by the scheme. A summary of this analysis is available below:
We would actively monitor and manage traffic conditions following delivery of the scheme. We are investing in advanced traffic signal technology to allow us to better manage traffic depending on differing conditions at any given time, and we are working to improve road user information so people can make informed journey choices before they travel.
Parking and loading
Our proposals for CS4 include changes to the layouts of some of the parking and loading bays along the route. Double yellow lines (no parking at any time) would also replace single yellow lines along some sections of Evelyn Street and Creek Road.
During the consultation period, we will contact premises we think could be affected by these changes. If you think the proposals could affect you or your business, please contact us to let us know (contact details are at the bottom of this page). We encourage you to discuss these proposals with your suppliers.
Environment
Our proposals aim to improve the quality of life in the area by:
Reducing the dominance of motor traffic, allowing people to better enjoy the area
Improving pedestrian crossings and cycle facilities, to encourage more people to walk and cycle through the area
Protecting bus journey times to safeguard public transport as a mode of choice
Although not a traffic-generating scheme, our proposals would change how traffic moves around the area, which may result in some associated and localised changes in air quality and noise levels. Environmental surveys and modelling would take place as part of our ongoing evaluation of these proposals.
Air pollution is one of the most significant challenges facing London, affecting the health of all Londoners. As part of the plans for new measures to tackle London’s current poor air quality, we are consulting on proposals to bring forward the introduction of the London Ultra Low Emission Zone (ULEZ).
A number of other schemes to improve London’s air quality are planned, including taking steps to reduce air pollution from our bus fleet, reducing emissions from taxis and private hire vehicles, setting up five Low Emission Neighbourhoods, and expanding the electric vehicle charging network and making it simpler to use.
We are investing to make London’s streets healthy, safe and attractive places to walk and cycle. Enabling more journeys to be made on foot or by bike can help reduce private vehicle use and associated emissions. Read more about how we are creating Healthy Streets
Equalities
How we fulfil our obligations under the Equality Act 2010
We are subject to the general public sector equality duty set out in Section 149 of the Equality Act 2010, which requires us to have due regard to the need to eliminate discrimination, advance equality of opportunity and foster good relations by reference to people with protected characteristics. The protected characteristics are: age, disability, gender reassignment, marriage and civil partnership, pregnancy and maternity, race, religion or belief, sex and sexual orientation. As part of our decision-making process on the proposals for Cycle Superhighways, we have had due regard to any impacts on those with protected characteristics and the need to ensure that their interests are taken into account.
In considering the design of our streets, we closely consider the needs of all users throughout the design process. On significant infrastructure projects, such as Cycle Superhighways, we:
Complete Equality Impact Assessments (EQIAs) at the outset of the project, to review potential impacts on equality target groups, including disabled people
Carry out public consultations, including targeted engagement with specific users such as (among many others): Royal National Institute of Blind People, Guide Dogs, Age UK, Transport for All, and National Autistic Society
Ensure we comply with established guidance – such as the Design Manual for Roads and Bridges – which includes detailed requirements for disabled people
The EQIA completed for CS4 shows positive impacts for black and ethnic minority groups, females, disabled cyclists, and cyclists under 25 and over 65 years of age. Positive impacts have also been identified for disabled pedestrians, as the scheme involves a number of improvements to pedestrian facilities, including wider footways and new and improved crossings. Some negative impacts have been identified where footways are cut back or shared-use footway is introduced. However, the minimum 2-metre standard for footway widths has been maintained to allow two wheelchair users to pass safely. Kerb-protected cycle facilities, which lead to positive impacts for people with protected characteristics when they are cycling, work most effectively when they feature bus stop bypasses. Bus stop bypasses and their impacts are described below.
Bus stop bypasses
At bus stop bypasses, the cycle track continues behind the bus stop at carriageway level, providing continuous segregation from motor traffic for people cycling. Bus passengers access a waiting area by crossing the cycle track using a raised, marked crossing point. The waiting area would be at least 2.5 metres wide. Pedestrians would cross the cycle track at raised, marked crossing points to continue their journey.
Our research has found that bus stop bypasses are safe for all road users, including bus passengers. Routing cycle traffic away from the road is an effective way to create safe, attractive cycling facilities along bus routes. The risk of conflict between cycles and pedestrians has been found to be very low, while providing a dedicated crossing point for bus passengers and design features that encourage slower cycling help to make the bus stop area more comfortable for everyone to use.
Bus stop bypasses are used across Europe and there are a number of examples in operation or planned across the UK, including in Brighton, Cambridge and Manchester, as well as in London. We introduced some bus stop bypasses on the Cycle Superhighway 2 (CS2) extension between Bow and Stratford in Autumn 2013 and across other Cycle Superhighways in 2015-16.
We are continuing to engage with accessibility and cycling groups and carry out additional research into the type and layout of pedestrian crossings at bus stop bypasses. We have a dedicated working group overseeing on-street trialling of the use of zebra crossings over cycle tracks at bus stop bypasses. This group includes representatives from Transport for All, the Royal National Institute of Blind People, Guide Dogs, Age UK London, London TravelWatch, Cycling Embassy of Great Britain, Living Streets, the London Cycling Campaign and Cycling UK. We will incorporate findings of these further investigations, including the outcomes of discussions about the trial with the working group, into final proposals for CS4.
Find out more about bus stop bypasses
Tactile paving
We would use tactile paving on all crossings and traffic islands throughout CS4. Along the route, tactile paving would be designed according to Department for Transport guidance. Local standards would apply in the London Borough of Lewisham and the Royal Borough of Greenwich.
Accessibility for cyclists with disabilities
CS4 would be suitable for use by disabled cyclists using adapted cycles, such as hand cycles and tricycles. The designs adhere to the principles for inclusive cycling set out in our London Cycling Design Standards. Cycle tracks on CS4 would be as wide as possible and a smooth riding surface would be provided, with the entire cycle route to be resurfaced.
Next steps
We will analyse and consider all of the responses received to the consultation, and expect to publish our response early in 2018.
For the Lower Road section, we have jointly commissioned a Strategic Transport Study with the London Borough of Southwark to understand how developments and future transport schemes would affect the existing road network. When completed, this study will inform the design for Lower Road, ensuring that it meets the future needs of the community. Consultation on proposals for Lower Road will take place at a later date
Subject to the outcome of consultation and agreeing proposals with partner boroughs, we would aim to commence construction on CS4 in late 2018. We would plan construction carefully to minimise disruption to those who live, work and travel through the areas.
As part of this planning, we would coordinate closely with other construction works in the area, and consider alternative ways of working including advance works, weekends and evenings. We would also carry out an extensive communications and engagement campaign to ensure residents, businesses and others travelling through the works areas have the information they need to plan ahead and adapt their travel arrangements where necessary, reducing any impact on their journeys during the construction period.
Created by Sam Saunders // 1 thread
Vauxhall Bridge between Coronation Road and Cumberland Road has a channel provided for wheeling bicycles on one side of its stepped sections. The channel is so narrow and so close to the railings that a bike can only be wheeled along it at a severe tilt. In addition only one side has a channel so wheeling the bike in the opposite direction has to be done from the wrong side of the bike, making it even more awkward.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by North Devon Cycling Forum // 0 threads
Removal of difficult barrier on cycle path NCN3 ending on Rose Lane; hardly possible to pass by bike, let alone trikes/tandems/mobility vehicles,
note this is NCN!
Created by Dawes Jaguar // 0 threads
This crossing is a problem for all road users, and it's quite common to hear blaring horns and screeching tyres. Pedestrians have a Puffin crossing, but for cyclists there is nothing. There is good reason for cyclists to cross Linden Road here, as it connects the bulk of the Bournville housing with the Worcester and Birmingham canal and the Rea Valley cycle route, and the motor traffic levels on Mary Vale Road are tolerable. Linden Road, on the other hand, is busy with motor traffic, including trucks. So the crossing needs to be improved, especially for cyclists heading along Mary Vale Road. Helpful to cyclists would be changing the priority in favour of Mary Vale Road. This would also encourage motorists to slow down on Linden Road. Unravelling routes in this way (so that cyclists cross main roads at a right angle and giving the cycling route priority) is one of the ways the Dutch encourage people to cycle rather than drive. Other possibilities are traffic lights or a mini-roundabout.
Created by Alex Jenkins // 1 thread
The consultation page states "A review of the Cheshire Street North 20mph zone has been undertaken and a number of improvements have been suggested making the roads safer and encouraging more walking and cycling in the area. The proposals include new cycle facilities, a one-way system on Wood Close, road closures and new crossings, as well as planting new trees in the area."
Link here: https://www.pclconsult.co.uk/projects/cheshire-street/
Created by Finlay KM // 1 thread
Cambridge Biomedical Campus (CBC) is currently in the process of developing a new wayfinding system for the communal, external spaces within the campus. This system will include new maps and signage to improve navigation in public spaces for staff, patients and visitors to the site and help to reduce stress when visiting the campus. In order to fully understand how the campus is currently used and the key issues, we would like to gain your invaluable input.
Note that the new wayfinding system will be focussing on the public space rather than the internal space of individual buildings, please limit your feedback to your experience of finding your way through the external public space on campus. Thank you in advance.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Shaun McDonald // 1 thread
http://www.travelipswich.co.uk/what-is-happening-and-where/orchard-street-area/
What’s Proposed:
January 2014
* New cycle facilities to allow cyclists to travel northbound on Orchard Street.
* A 'No Entry except for cyles' sign to be placed on the St Helen's Street/Orchard Street junction.
Created by Roxanne (CEO) // 1 thread
A children's hospital is planned for the Biomedical Campus (Addenbrookes) and is planned to open in 2025.
Anon // 0 threads
The cycle parking on Parliament Street is great even though there isn't enough of it on a weekend, but when events are on such as the Christmas Market or Food Fairs it's a nightmare to get your bike down Parliament Street past the crowds of people to only find all but one row of racks is blocked by tents. It would be much better if all the racks were moved down to the Pavement end of Parliament Street.
Created by MikeC // 1 thread
As part of the highways 'improvements' associated with the proposed New Monks Farm development in Lancing, the existing minor road N-S crossing of the A27 by the Sussex Pad (Coombes Road to Old Shoreham Road) is to be closed and replaced by a large multi-lane light controlled roundabout some 400m west of the existing crossing. The only assistance for vulnerable road users will be several Toucan crossings as part of the roundabout light controls.
Net result will be an additional 1km diversion for anyone going south into Shoreham, plus additional time waiting at Toucans. An underpass on the existing crossing alignment would be the preferred solution, as recommended in IAN195.
Created by Kevin Ablitt // 1 thread
Twice in the past week I have been cycling up St Johns to make a rh turn onto Cauldwell Hall and nearly been taken out by a driver taking the corner too fast as they travel north bound along Cauldwell Hall and turn down St Johns Rd.
The problems are too fast traffic on Cauldwell Hall and poor design at that junction , need an island to separate traffic.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Jean Dollimore // 3 threads
From time to time, we receive consultations on Play Streets and rather debating each one as it comes in, I think it could be helpful to have a policy as to whether CCC want to respond as a group and the position we should take.
Play Streets are achieved by the occasional closures of a stretch of road to enable children to play (e.g. twice a month for a couple of hours).
The road closures are usually operated by local residents using ‘road closed’ signs, advanced warning signs and barriers.
Play Streets are not directly connected to cycling. But, as they may give people an idea that it would improve the area to have longer term road closures, I would like to support such schemes.
Hamish F // 1 thread
Quoting from the proposal: "This short section will provide an initial link from the A105 major scheme to the Salmons Brook cycle route." Part of Quietway 18.
The main feature is an improved junction at Bury Street West and Church Street, with a 2.5m wide two-way cycle track to take cyclists from that junction to Blakesware Gardens (and onto the Salmons Brook cycle route).
Also some rain gardens and other improvements.
What's not to like, comments please ...
Created by George Coulouris // 7 threads
This issue is intended to act a repository for material that can be used to back-up the LCC's 2014 Local Election Campaign 'Asks'. There are 6 'asks' that were finalised and agreed at the LCC's AGM on 19 October 2013:
1. Safe routes to schools
2. Areas without through motor traffic (AWTTs)
3. Protected space on main roads/major junctions
4. Safe cycle routes via parks and canals (Greenways)
5. 20mph speed limits
6. Liveable town centres
so we'll have 6 threads under this Cyclescape issue where we can collect explanations, discussions and most importantly concrete illustrations of what is meant by each ask.
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
Created by Chris Peck // 1 thread
With the welcome completion of the cycle path linking Marshall Road to Bridge Road, the weaknesses of links on either side of the route become more apparent.
Bridge Road is a busy, narrow main road. Traffic mostly has to wait behind cyclists, creating uncomfortable conditions for all but the brave. Both roundabouts (at the Chalk Road/Meadrow and the Bridge Street/Wharf Street junctions) are difficult for cyclists (and pedestrians).
An alternative route, either running parallel to the road (a widened shared use footway?) or a raised boardwalk across the Lammas Lands, are alternatives, but both are expensive, challenging options, which require new or wider bridges over Hell Ditch and the River Wey.
Created by David Butler // 3 threads
The Bridgewater Way aims to provide a high quality route for walkers and cyclists over the complete 65km length of the Bridgewater Canalbetween Runcorn, Leigh and Manchester City Centre. The cornerstone of the project is a major upgrade to the canal towpath, which as well as greatly improving conditions for pedestrians, will make it easier for cyclists to use the tow path.
The Deansgate / Whitworth Street West Street junction is also proposed to be revised to provide toucan crossing points and easier access to the canal from Whitworth Street West withsignal controlled cycle movements running past Deansgate station. The proposed works at the
junction are also intended to provide improved “on street” facilities to assist cyclists travelling towards and away from Manchester city centre.
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
Kate Ravilious // 1 thread
Car parking obstructs cyclists travelling uphill, forcing them to stop and start on a steep uphill section, or move into the path of oncoming traffic travelling downhill.
It would be safer to have car parking on the other side of the road.