Sign this route
This route should be signed. It's a very nice quiet bicycle-walking connection between Liberton and Gilmerton, but very difficult to find, especially the footpaths between all the curved bits of Malbet Park/Wynd.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Stephan Matthiesen // 0 threads
This route should be signed. It's a very nice quiet bicycle-walking connection between Liberton and Gilmerton, but very difficult to find, especially the footpaths between all the curved bits of Malbet Park/Wynd.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by Stephan Matthiesen // 0 threads
Drum Street is very narrow in Gilmerton, many shops and pedestrians. Should really be included in 20mph.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by Stephan Matthiesen // 1 thread
Cars and buses southbound often cut the corner at the traffic lights (road bends to left), driving over the cycle lane.
The cycle lane leads up to the lights but ends there and restarts some distance along the road.
It is dangerous because drivers think that cyclists are out of the way in their own lane, even larger vehicles overtake here without realising that they easily move into the bike lane. Attached a photo where that happened to me, on 21 October 2014, the bus overtook and cut me off, I had to slam the brakes in order not to be squashed.
The bike lane should be clearly separated here, bypassing the traffic lights completely.
Created by Stephan Matthiesen // 0 threads
Drivers often cut the corner at the Bank of Scotland, driving over the cycle lane. The current layout encourages drivers to overtake without giving people on bicycles the necessary distance. Parking is also a dangerous problem here.
It would be easy to install plastic highway bollards here along the cycle lane which would encourage drivers not to encroach on the cycle lane.
Created by Stephan Matthiesen // 1 thread
Very difficult to cross here, coming from Brunstane Burn Walkway to turn right towards Musselburgh.
The timing of the traffic lights seems to be such that there is almost always traffic from one direction, so one often has to wait for very long here.
Created by Stephan Matthiesen // 0 threads
Lady Rd needs a segregated cycle path uphills. It's very steep uphills with dense&fast traffic, and it is particularly difficult to turn right.
Created by Stephan Matthiesen // 0 threads
Apparently it is not possible to close the road to through-traffic, but it could be significantly discouraged by making it a less convenient ratrun.
I suggest at the entrance to the carpark of Inch House the road could be changed to create a very tight corner. This would not affect people going to Inch House from either direction, but it would make it less convenient to drive through, and slow down the cars (there is a blind corner behind the house).
Created by Stephan Matthiesen // 1 thread
The road through Inch Park has a lot of very high/short speed bumps which are total bone-shakers for people on bicycles - dunno how many eggs I have broken cycling home from the shopping centre.
I realise aggressive speed bumps are there to remind drivers of the 10mph speed limit.
Perhaps they could be changed to have a gap or a shallower ramp in the centre so that they are easier on bicycles. Some actually have pothole repairs which essentially created such a ramp and they are much nicer.
Presumably this would also be better for users of mobility scooters.
Created by edge // 1 thread
When approaching this junction from the East on Widney Lane (and possibly other directions as well), the traffic lights do not detect the presence of waiting cycles.
Since the default priority at this junction is for traffic on the Blossomfield Rd / Marshall Lake Road axis, this means that cycles heading from Widney Lane to Longmore Road have to wait indefinitely to cross the junction.
In busy times this is not a problem, because a waiting car will trigger the traffic lights to change.
However, at quiet times this effectively means cycles cannot cross this junction legally at all. I have experimentally waited more than 5 minutes for the lights to change. Unless a car comes to trigger the change, cyclists are stuck.
This "bike-blindness" built into the road signalling infrastructure is unfortunately not uncommon. As well as being inconvenient for and disrespectful of cyclists, it reinforces the notion that bicycles are second-class road-users - indeed that they do not really belong on the road at all.
Created by Stephan Matthiesen // 0 threads
It would be great to have a pedestrian/bicycle entrance in the South East corner of Kings Buildings. This would be of much benefit to everybody coming from the south, as you can avoid the steep, busy Mayfield Road.
Created by Stephan Matthiesen // 0 threads
The shared footpath under the bypass ends at the bottom of Loanhead Rd and then there is no suitable connection into the Straiton Retail Park area.
Loanhead Rd is very steep with fast cars. Straiton Rd is fast dual road with unconnected bits of narrow painted cycle lanes. Both are total barriers for other than high-risk extreme sports enthusiasts. No way families could cycle to the shopping centre here.
The connections into Edinburgh (Burdiehouse Burn, or the new Loanhead-Lasswade path) are actually really good, so it's particularly sad that you're dumped in a car hell on the last few hundred metres.
Created by Stephan Matthiesen // 0 threads
Need considerably more bicycle parking at the shopping centre. The few racks here are often overfull.
Created by Stephan Matthiesen // 0 threads
Need proper bike parking in front of Summerhall. Bikes chained to the guardrails are a hazard for pedestrians.
Some should be right at the entrance, some more could be at the front of Summerhall Square (please not tugged away somewhere at the back of Summerhall Square where it would be perfect for thieves).
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
Created by Stephan Matthiesen // 0 threads
Contraflow here would make it much easier to get from Pleasance and Geography Dept in Drummond Street to South Bridge and avoid the uphills detour to Hill Place.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane to make it easier to get from University to East Crosscauseway (St Leonhards, Innocent etc.) and St Patrick Square.
Created by Stephan Matthiesen // 0 threads
Make more pedestrian friendly and discourage car use. There has been a fatal collision in 2012 but near hits are common.
Remove the fence around the garden, or add additional entrances on all four corners, to open it up and enable pedestrians to use the garden to cross the square in East-West direction and diagonally. At the moment it doesn't have an exit in the west, making it a dead end and barrier for people moving between Nicolson St and Potterrow.
The pavement on the south (from Mosque kitchen to the libanese restaurant) are far too narrow. Double yellow lines regularly ignored, creating blind corners, making it difficult for pedestrians to cross.
Marshall Street should be narrowed considerably to one lane, as it's really only used for a few bus lines, no need to have two fairly wide lanes here. The southern pavement far too narrow, but it is very busy with pedestrians.
It is used a lot as ratrun between Nicolson Street and Potterrow.
Created by Stephan Matthiesen // 0 threads
These racks are too close to the wall so you can't actually lean a bicycle against them in a stable way.
Also why only so few in such a central and busy location?
Created by Stephan Matthiesen // 0 threads
Need much more bicycle parking here, also to access Nicolson Street.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Stephan Matthiesen // 0 threads
Cobbles, tarmac patches etc almost impossible to cycle on.
These streets are key connections between centre and the Innocent Path.
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.