Potters Bar to South Mimms research institutes
A possible route from Potters Bar via Dame Alice Owen School, NCN12 at South Mimms, Cancer Research at South Mimms and then on via Blanche Lane to join the existing cycle path alongside the A1.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Adam Edwards // 1 thread
A possible route from Potters Bar via Dame Alice Owen School, NCN12 at South Mimms, Cancer Research at South Mimms and then on via Blanche Lane to join the existing cycle path alongside the A1.
Created by Adam Edwards // 1 thread
Porposed but never built links between the Royal Veterinary College and Potters Bar and Brookmans Park stations. The route parallel to the railway exists as a footpath which would need upgrading to a bridleway with good surface and ideally lit to allow all year use. (Vets work well beyond 9-5)
The Alban Way is unlit and isolated from main roads. Thus it does not provide a safe commuter route in the winter months.
WelHatCycling believes there should be an all year route alongside the A1057 along the route shown, linking Hatfield to the St Albans Green Ring at Fleetville and then continuing in to the city centre.
This will be a challanging route where streets are narrow and car use is high. The priority therefore might be University of Hertfordshire - Oaklands College - Fleetville to encourage cycling to these two key educational institutions.
Created by Adam Edwards // 1 thread
WelwHatCycling believes there should be shared use pavements along Digswell Road to link the north of the town to the town centre. This would connect to our proposed North - South and East- West routes described in other entries.
Created by Adam Edwards // 1 thread
The cycle route from WGC to Hertford is an unlit isolated former railway. Whilst an excellet ride on a sunny Sunday, it is of little use in the dark winter months for cycle commuting.
The route shown would comprise:
A new shared use pavement along Cole Green Lane / Birchall Lane from the end of the current cycle path to the A414.
A light controlled crossing of the A414 or bridge.
Signed us of the Old Coach Road to the outskirts of Hertford.
Shared use pavement plus signed routes into the centre of the town.
Created by Adam Edwards // 1 thread
The east side of WGC is currently served only by the NCN61 route. In 2014 work was done on Heronswood road to add safety markings due to high incidences of accidents involving bikes. There are local concerns about cyclists using pavements to avoid busy local roads.
There should as a minimum be a route from WGC station to the new QE2 hospital, ideally directly via Woodhall shops. The other routes show other useful possible links to create a cohesive network to serve this section of town.
Created by Adam Edwards // 1 thread
A long standing missing link in WHBC area cycle routes. The current Bessemer Way cycle path ends where the road becomes a busy dual carriage way. There is no off road cycling link to Welwyn village which prevents the children of the town cycling to Monks Walk School (yet it is possible for Hatfield children to get there virtually the whole way on cycle path!)
Created by Adam Edwards // 1 thread
This route would use a combination of 20 mph road (Fretherne Road, Stonehills) plus upgraded crossings to create a north south route through the centre of Welwyn Garden City. It would share a common section around the Welwyn Hatfield Borough Council Offices and the Campus with the east west route described in another section.
The route would link NCN57 south of the town with the existing link from Campus East to Shirepark, thus enabling commuters from this business park to access the station. Going further north the link over the White Bridge would then open up the quiet residential streets of north WGC for cycling to and from the town centre. Via the east west route their would be a better connection to NCN12 avoiding the busy Parkway.
Created by Adam Edwards // 1 thread
Welwyn Garden City has no off road town centre cycle routes. This east west route would link the network of cycle paths to the east of the town centre to NCN12 to the west and enable cyclists to avoid The Campus, a deceptively green gyratory which is difficult for cyclists to navigate.
It would connect with a north south route at the Welwyn Hatfield Borough Council offices, encouraging staff to cycle to work. It would encourage commuters to cycle from west WGC to the station and to work places off Broadwater Road and at the Mundells.
Created by Adam Edwards // 1 thread
The Sustrans map erroneously shows part of this route as an on road cycle path. No such path exists.
The Common is one way south west bound. In order to spare cyclist having to use the on road cycle lane on Queensway which is badly engineered, especially at the Woods Ave roundabout, WelHatCycling believe there should be a contraflow cycle lane or shared use pavement along this route, extending accross Lemsford Road and connecting with the existing cycle path on St Albans Road West. This would create a route through the town centre to connect north and south Hatfield.
The photo shows the north end of the Common as currently arranged for cycling.
Created by Adam Edwards // 1 thread
Just two (2!) metres of tarmac would legally connect Dellfield Road to the Woods Ave cycle path. With no other work than this it would allow cyclists heading west to avoid the nasty on road cycle path along Queensway parallel to this route.
Ideally works would also be done to allow cyclists heading east to use this route and then continue along the planned Queensway cycle path (see other entry) to avoid Queensway entirely.
Created by Adam Edwards // 1 thread
Hertfordshire County Council announced plans in 2014 to improve the walking route from Hatfield town centre to the railway station. We lobbied successfully for the section from the Market Place toucan to the French Horn Lane pelican crossing to be reubuilt as dual use, completing a vital link from the station to the University.
This would be even better if officially extended round the skateboard park and accross Link Drive to join up with the Woods Ave off road cycle path, thus enabling cyclists to avoid the dangerous roundabout at the junction of Woods Ave and Queensway. This is shown in the map to the west (left) end of the route shown.
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by Roxanne (CEO) // 3 threads
Thread for County Council Economy and Environment Committee meetings
http://www2.cambridgeshire.gov.uk/CommitteeMinutes/Committees/Committee.aspx?committeeID=74
Created by Chris Peck // 1 thread
Woodside Park is a commercial area which the developers wish to turn into an 87 dwelling residential area, comprised of 61 flats and 26 houses, with up to 235 residents. An additional office space area could also be turned into a further 20 2-bed flats, resulting in a total of 107 dwellings.
The developers' transport assessment suggest this:
"Whilst there are no formal facilities for cyclists, the local roads are suitable for use
by cyclists, and Catteshall Lane is identified as a recommended cycle route by SCC
and Sustrans. This cycle route links with Godalming town centre and Godalming
railway station, which is approximately five minutes from the site by bicycle."
This is patently not true, as the route to Godalming station via the town centre is one-way!
Car parking
135 car parking spaces are planned, however, the assessment suggests that, comparing equivalent car ownership in the local area, only 86 spaces are actually required (because there are only 0.8 cars per flat in central Godalming, and 1.42 cars per house).
While it is accepted that a few extra spaces are required for visitors, is 56% extra parking really needed?
Cycle parking
No numbers are provided, but houses are expected to accommodate cycles in sheds or garages, while there will be covered cycle storage for the flats.
More detail is required on how secure this storage will be.
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
Created by Chris Peck // 1 thread
With the welcome completion of the cycle path linking Marshall Road to Bridge Road, the weaknesses of links on either side of the route become more apparent.
Bridge Road is a busy, narrow main road. Traffic mostly has to wait behind cyclists, creating uncomfortable conditions for all but the brave. Both roundabouts (at the Chalk Road/Meadrow and the Bridge Street/Wharf Street junctions) are difficult for cyclists (and pedestrians).
An alternative route, either running parallel to the road (a widened shared use footway?) or a raised boardwalk across the Lammas Lands, are alternatives, but both are expensive, challenging options, which require new or wider bridges over Hell Ditch and the River Wey.
Created by Bracken VanRyssen // 1 thread
The path between Smith's Wood and Water Orton could be a key cycling and walking link and a way to avoid the only other crossing of the A452 and M6, which is the busy and fast Water Orton Road. However the route is blocked off with concrete blocks and is in an extremely poor state of repair with overgrown bushes and an exceedingly unpleasant subway.
Martin Lucas-Smith // 3 threads
The City Council has been working on a City Centre Access Strategy to deal with the problem of obstructions, including inconsiderately-parked bikes. This is to be considered formally by a City Council Committee.
Created by Jon_B // 0 threads
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
Created by Iain Lane // 2 threads
Dear Consultee,
Nottingham City Council (Radford Road Area, Nottingham) (Prohibitions of Waiting and Parking Places (Specified Classes of Vehicles)) Traffic Regulation Order 2015 (TMP 7115)
Please find attached a consultation letter and associated drawings, SN/TMP7115/01/A, SN/TMP7115/01/B and SN/TMP7115/01/C which relates to the above Radford Road Area, Nottingham – Traffic Regulation Order (TMP 7115).
Created by Dawes Jaguar // 0 threads
The pointless pedestrian gate here is really awkward for pedestrians and cyclists alike, as it's hung on the wrong post and the area of bitmac that has been laid for it is ludicrously small. This area normally ends up a muddy mess in the winter. People simply don't move in sub one metre angular movements, shunting back and forth to avoid the grass. Note the track in the grass that shows what one cyclist did shortly before the Google car got there.
Remove all three gates and replace them with a removable bollard.
Created by Dawes Jaguar // 0 threads
There are regular collisions at this junction because motorists speed on Bournville Lane and the site-lines are very, very poor. The simple solution is to change the priority. This would solve the problem for motorists, and make it easier for cyclists to use Hay Green Lane as part of a cycle route.
I have suggested the change of priority to BCC but was given a list of excuses why this cannot possibly be done. One of these was that Bournville Lane is a blue route. I see no benefit in an emergency journey ending here because someone pulling out of Hay Green Lane couldn't see the approaching police car.
Created by Dawes Jaguar // 0 threads
Cotteridge town centre has been allowed to degenerate into a hostile place for cyclists and pedestrians. Motorists have multiple lanes for driving and parking, whilst pedestrians are blocked from crossing the road by steel railings. Cyclists are given nothing. Watford Road and Rowheath Road are both OK for cycling, but their junction with Watford Road is horrendous. Midland Road has no contra-flow, so it is obstructive to cyclists trying to avoid the multi-lane horror of the Pershore Road. The two lane double-roundabout is difficult to negotiate even in a car.
This whole area needs to be redesigned, putting cyclists and pedestrians first. I'm sure I'm not the only person who doesn't shop in Cotteridge because the environment is /vile/.
Created by Dawes Jaguar // 0 threads
Birdcage Walk is fitted with Cycling Prohibited signs and barriers, yet it is as wide as some roads. Talking to a PCSO on a bike I saw cycling there, he told me Cadbury's were happy for people to cycle on Birdcage Walk if they did so responsibly. So how about replacing the signs with "Share with Care" signs, and the barriers with bollards spaced wide enough to allow cyclists through but not motor vehicles?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.