Burnside/Brookfields Parking issue
The proposal is to put in double yellow lines and no waiting restrictions at this entrance to the Tins.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
The proposal is to put in double yellow lines and no waiting restrictions at this entrance to the Tins.
Created by cobweb // 2 threads
EIP's from the East Area Committee. Two schemes proposed here, one at the Riverside end of the Tesco path, the other near Stanley Road. For the first, double yellow lines are suggested, for the second, double yellow lines and residents only parking.
Scheme 3, page 5.
Created by cobweb // 0 threads
Not sure if this is something or nothing but in the East Area Committee agenda (EIP Appendix B) there's discussion of Coleridge Community College (Parkside Federation is probably the right name now) installing bollards on the verge.
(Scheme 6, page 11)
Created by Gerhard Weiss // 1 thread
How St is Walthamstow's artery. It carries way too much motor traffic for its size. Many bus routes run through it. Recent improvement plans are looking ok, but are as usual a mixed bag.
This is a general, over-arching issue for discussion of helmet-related and cycle safety promotion strategic matters in Cambridge that periodically (and continually) arise.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by velocipedus@gmail.com // 0 threads
CN Letters 30 July 2012:
"If the Lady whose bottom was smacked by a passenger in a green Ford KA as she cycled along Cambridge Rd, Shelford, towards Trumpington at 11 am on July 25, would like to do anything about it, please get in touch with me via this newspaper. I was following and have the details of the car" (Name withheld in CN)
CCC to local police
"CCC would like to encourage the local police force to get in touch with the informant and take the necessary steps. Such behaviour is degrading, it is extremely dangerous, potentially life threatening, and must not be allowed to become a local custom. We look forward to read in the newspaper that the necessary steps have been taken and that such behaviour will be punished, including revoking of driver's license."
Suggestions?
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by Chris Peck // 0 threads
Major development for around 140 dwellings. Godalming Cycle Campaign has written to the developer requesting matters to be taken into consideration to ensure that the development improves access around the site for cyclists.
Some changes to the junctions nearby have been proposed.
http://www.waverley.gov.uk/info/200074/planning/1282/godalming_key_site
Created by Heather Coleman // 6 threads
The Addenbrooke's site is a poor cycling environment in so many ways. A full set of proposals for change are needed.
Created by David Earl // 2 threads
Expansion of the site by 510 vehicles
Martin Lucas-Smith // 2 threads
Large gyratory, which needs removal and replacement with cycle-friendly measures.
Created by Gregory Williams // 1 thread
Cycle parking is required at Bekesbourne railway station. The issue photo is evidence of this.
From the EIP programme for the South Area Committee, a proposal to put in a signalised crossing. (The report mentions Fulbrooke Road (which is in Newnham and not part of this patch) but I think it means here instead.) It's likely to get South Area Transport Corridor funding. No more details given.
Created by Rohan Wilson // 2 threads
Parcels either side of Spine Road's junction with Long Road, and one along eastern edge of housing, west side of proposed secondary school site. http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=M5YZKKDX07900 Official deadline 19 July
12/0794/REM | Reserved matters for 231 dwellings (outline approval 07/0620/OUT) Parcels 1B, 2 And 5 Clay Farm, near Long Road
Created by Rohan Wilson // 0 threads
Cycle parking in lean-to's in rear gardens, access via narrow rear alleys, while cars are in front, across driveway. Site far behind Esso, Aldi and modern factory building. Deadline 25 July
Created by Rohan Wilson // 0 threads
"... office development adjoining Unex House (Savills), providing 5 storeys of B1(a) office space (4688m2) and two storeys of associated parking spaces (3102m2). Providing a total of 7790m2 gross internal floorspace of development. | Car Park Unex House 132 - 134 Hills Road..."
Created by cobweb // 1 thread
The proposal is to retain the CB1 café and reconfigure the two upper floors to include 10 studio flats.
Created by Rohan Wilson // 1 thread
New development:
Phase 1 reserved matters for the layout, scale and appearance of 201 dwellings, hard and soft landscaping and associated infrastructure and works including a means of access from Church Road
Martin Lucas-Smith // 10 threads
The route from the Royal Cambridge Hotel junction to Newmarket Road is a catalogue of hostile junctions, squeezed road situations, narrow cycle lanes, high collisions, and slow progress through this crucial part of the ring road. What is needed is a total overhaul of this route to add either a Danish or Dutch -style cycle route (2m+ could be achieved in most sections, with only one or two sections a squeezed 1.5m) that would encourage a massive shift of people from cars to bikes. To be clear: this is a proposal that a proper, strategic cycleway, that forms a coherent, uninterrupted route is needed, not bits of random infrastructure. See: http://www.camcycle.org.uk/newsletters/103/article4.html
Created by cobweb // 1 thread
I noticed today that there were notices on the racks outside Trinity College asking users to remove their bikes by 27th June but not giving a reason.
Martin Lucas-Smith // 1 thread
12/0783/FUL Barclays Bank, Bene't Street
Change to approved scheme 11/1421/FUL
to omit 21 bike store and replace with fitness room and laundry
Needs checking out.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Gregory Williams // 1 thread
Overgrown vegetation encroaching on the cycle path.
Created by Gregory Williams // 1 thread
A dropped kerb is needed for the cycle path where it links to Star Lane at the back of the retail park, near Gordon Road.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Created by Richenda // 1 thread
Apparently TfL commissioned "...to explore the opportunity of a pedestrian river crossing ....". They may not think bikes should also be included, but they should!
http://www.telegraph.co.uk/luxury/travel/4162/a-garden-bridge-across-the-thames.html
http://www.gardenbridgetrust.org/index.html
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
Created by HVS // 3 threads
The A5117 at this point has some sections of non-protected cycle lane, but they are not continuous, and they disappear at a number of pinch points. The road carries a lot of very fast moving heavy traffic, and is dangerous and unpleasant to cycle on. It would be a useful route for people travelling by bike to or from Stanlow Refinery, Cheshire Oaks, the University of Chester at Thornton Science Park, and Ince & Elton villages, but is currently only used by a tiny number of very brave and confident cyclists. This situation could be improved by making the cycle lane continuous along the whole route.
Created by Andrew Woodward // 0 threads
Pinch-point at zebra crossing where cyclists are forced to share space with traffic that is often speeding. Cars try to squeeze past cyclists or brake suddenly.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Frenchie // 0 threads
This is one of the prime candidate for a cycle contraflow in Newcastle City Centre. Currently one way for all traffic from Percy Street to Strawberry place. Allowing cyclists down from Strawberry Place to Percy Street would improve permeability and connectivity for cyclists. Note: not a lot of traffic, space not an issue, short uphill section so speeding not an issue.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Ned Harrison // 1 thread
Holywells Park has a section of cycle route 51 running through it, linking South East Ipswich to the centre with a pleasant and safe route down to the waterfront.
During Winter, the park is closed at dusk, sometimes as early as 4, meaning that just when the roads are most dangerous (dark and wet) cyclists are forced onto steep and busy routes either along Cliff Lane or up Bishops Hill.
The closures are largely at the request of the Park Friends group. I've spoken to them, and their concerns seem to be largely about what might go on after dark. It's not clear that there is any evidence for this, nor that the current situation of locking the main gates but leaving others would do anything to deter misbehaviour.
Keeping it open as a cycle route would ensure a legitimate presence in the park, and help provide less confident cyclists in the area with a safe route to and from town.
I'd propose either locking later, or for a trial period leaving the park unlocked.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.