Burnside/Brookfields Parking issue
The proposal is to put in double yellow lines and no waiting restrictions at this entrance to the Tins.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
The proposal is to put in double yellow lines and no waiting restrictions at this entrance to the Tins.
Created by cobweb // 2 threads
EIP's from the East Area Committee. Two schemes proposed here, one at the Riverside end of the Tesco path, the other near Stanley Road. For the first, double yellow lines are suggested, for the second, double yellow lines and residents only parking.
Scheme 3, page 5.
Created by cobweb // 0 threads
Not sure if this is something or nothing but in the East Area Committee agenda (EIP Appendix B) there's discussion of Coleridge Community College (Parkside Federation is probably the right name now) installing bollards on the verge.
(Scheme 6, page 11)
Created by Gerhard Weiss // 1 thread
How St is Walthamstow's artery. It carries way too much motor traffic for its size. Many bus routes run through it. Recent improvement plans are looking ok, but are as usual a mixed bag.
This is a general, over-arching issue for discussion of helmet-related and cycle safety promotion strategic matters in Cambridge that periodically (and continually) arise.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by velocipedus@gmail.com // 0 threads
CN Letters 30 July 2012:
"If the Lady whose bottom was smacked by a passenger in a green Ford KA as she cycled along Cambridge Rd, Shelford, towards Trumpington at 11 am on July 25, would like to do anything about it, please get in touch with me via this newspaper. I was following and have the details of the car" (Name withheld in CN)
CCC to local police
"CCC would like to encourage the local police force to get in touch with the informant and take the necessary steps. Such behaviour is degrading, it is extremely dangerous, potentially life threatening, and must not be allowed to become a local custom. We look forward to read in the newspaper that the necessary steps have been taken and that such behaviour will be punished, including revoking of driver's license."
Suggestions?
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by Chris Peck // 0 threads
Major development for around 140 dwellings. Godalming Cycle Campaign has written to the developer requesting matters to be taken into consideration to ensure that the development improves access around the site for cyclists.
Some changes to the junctions nearby have been proposed.
http://www.waverley.gov.uk/info/200074/planning/1282/godalming_key_site
Created by Heather Coleman // 6 threads
The Addenbrooke's site is a poor cycling environment in so many ways. A full set of proposals for change are needed.
Created by David Earl // 2 threads
Expansion of the site by 510 vehicles
Martin Lucas-Smith // 2 threads
Large gyratory, which needs removal and replacement with cycle-friendly measures.
Created by Gregory Williams // 1 thread
Cycle parking is required at Bekesbourne railway station. The issue photo is evidence of this.
From the EIP programme for the South Area Committee, a proposal to put in a signalised crossing. (The report mentions Fulbrooke Road (which is in Newnham and not part of this patch) but I think it means here instead.) It's likely to get South Area Transport Corridor funding. No more details given.
Created by Rohan Wilson // 2 threads
Parcels either side of Spine Road's junction with Long Road, and one along eastern edge of housing, west side of proposed secondary school site. http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=M5YZKKDX07900 Official deadline 19 July
12/0794/REM | Reserved matters for 231 dwellings (outline approval 07/0620/OUT) Parcels 1B, 2 And 5 Clay Farm, near Long Road
Created by Rohan Wilson // 0 threads
Cycle parking in lean-to's in rear gardens, access via narrow rear alleys, while cars are in front, across driveway. Site far behind Esso, Aldi and modern factory building. Deadline 25 July
Created by Rohan Wilson // 0 threads
"... office development adjoining Unex House (Savills), providing 5 storeys of B1(a) office space (4688m2) and two storeys of associated parking spaces (3102m2). Providing a total of 7790m2 gross internal floorspace of development. | Car Park Unex House 132 - 134 Hills Road..."
Created by cobweb // 1 thread
The proposal is to retain the CB1 café and reconfigure the two upper floors to include 10 studio flats.
Created by Rohan Wilson // 1 thread
New development:
Phase 1 reserved matters for the layout, scale and appearance of 201 dwellings, hard and soft landscaping and associated infrastructure and works including a means of access from Church Road
Martin Lucas-Smith // 10 threads
The route from the Royal Cambridge Hotel junction to Newmarket Road is a catalogue of hostile junctions, squeezed road situations, narrow cycle lanes, high collisions, and slow progress through this crucial part of the ring road. What is needed is a total overhaul of this route to add either a Danish or Dutch -style cycle route (2m+ could be achieved in most sections, with only one or two sections a squeezed 1.5m) that would encourage a massive shift of people from cars to bikes. To be clear: this is a proposal that a proper, strategic cycleway, that forms a coherent, uninterrupted route is needed, not bits of random infrastructure. See: http://www.camcycle.org.uk/newsletters/103/article4.html
Created by cobweb // 1 thread
I noticed today that there were notices on the racks outside Trinity College asking users to remove their bikes by 27th June but not giving a reason.
Martin Lucas-Smith // 1 thread
12/0783/FUL Barclays Bank, Bene't Street
Change to approved scheme 11/1421/FUL
to omit 21 bike store and replace with fitness room and laundry
Needs checking out.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Gregory Williams // 1 thread
Overgrown vegetation encroaching on the cycle path.
Created by Gregory Williams // 1 thread
A dropped kerb is needed for the cycle path where it links to Star Lane at the back of the retail park, near Gordon Road.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by David Butler // 1 thread
Consultation of cycle lanes and junction changes by Manchester City Council
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Marcus Howarth // 1 thread
see https://consultations.tfl.gov.uk/trams/sutton-link/?cid=sutton-link
Here's the overview from TFL:
Overview
We are consulting on proposals for a new, direct and quicker transport link between Sutton and Merton. We have called this the Sutton Link.
The Sutton Link would create a high-capacity route for people travelling between Sutton town centre and Merton using zero-emission vehicles. It would connect with other major transport services into central London and across south London, including National Rail, London Underground, existing tram and bus services. It would make journeys by public transport quicker and more attractive, and reduce the need for trips by private car.
Many of the neighbourhoods along the proposed routes have limited public transport options. The Sutton Link would support new homes being built and would improve access to jobs, services, major transport hubs and leisure opportunities across both boroughs and beyond.
Our work is at a stage where we would like to know your views about three potential routes. We are considering a tram or ‘bus rapid transit’ (BRT) for the Sutton Link and would also like to know your views on this.
BRT is similar to a tram but runs on road segregated from traffic where possible, not on rails, and carries fewer people in each vehicle. A full explanation is included below in the section titled ‘About trams and bus rapid transit’.
From LCC -
general principles would be ensure this doesn’t negatively impact cycle routes, that there are good routes to the stations/stops, that any places where cyclists will be crossing tracks are designed carefully with latest materials to avoid tramlining incidents, that the space comes from private car lanes.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Sam Saunders // 0 threads
A twenty metre stretch of advisory cycle lane at the end of Whiteladies Road, from a zebra crossing to its junction with Queens Road, encourages cyclists to take a position near to the curb as they enter the and leave the junction. This puts them exposed to frequent buses turning immediately left into Queens Avenue and in a vulnerable position from which to continue a journey south west towards Park Street or Park Row.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Jean Dollimore // 1 thread
Fleet Road is a one-way street with heavy motor traffic and no protected cycle infrastructure. This means that people cycling through the area face unpleasant interactions with motor vehicles as well as needing to make diversions to reach destinations in the area,