A660 Covid measures
Proposals for trial infrastructure along the A660
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Proposals for trial infrastructure along the A660
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03519/FUL | Change of use of an existing two-storey residential extension to form a separate two-bed dwelling. | 72 Ramsden Square Cambridge CB4 2BL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03535/FUL | Demolition of existing and construction of eight dwellings and associated external works | Good Technology 355 Newmarket Road Cambridge CB5 8JG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03501/FUL | Demolition of existing garages and hardstanding and the construction of 7 No. modular homes. | Land At Barnes Close Cambridge CB5 8RR
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The government said that it expects Combined Authorities to lead the restart of the transport system following the Covid lockdown. The Transport Restart Group is chaired by the Combined Authority (its leads are James Palmer and Paul Raynes) and brings together the two highways authorities, police and public health colleagues, the two main city councils, a representative bus operator, Network Rail, Highways England, and the Department for Transport. It has met weekly since 1 June.
The group has three main tasks:
(a) ensuring the public transport restarts to as near 100% of pre-Covid network as possible;
(b) ensuring a package of active travel measures is implemented to mitigate potential increases in private car use;
(c) monitoring data in relation to the impact of Covid – 19 on transport and considering what further measures might be needed to maintain the transport recovery.
Outline Planning with all matters reserved, except for the vehicular accesses onto Station Road, for the demolition of a single dwelling and associated buildings and development of up to 107 dwellings (including affordable housing) and employment/ community/ cafe/ development together with parking areas, landscaping and all associated infrastructure.
Land West Of Station Road Longstanton Cambridge CB24 3DS
Cambridge
Application reference : 20/03598/OUT
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Redevelopment of office building
Created by Steven Moseley // 0 threads
"We’re widening the A12 between junction 19 (Chelmsford) and junction 25 (A120 interchange) to ease congestion and cope with increasing traffic demands."
Created by Steven Moseley // 0 threads
This single carriageway section of the A120 is regularly very busy and there have long been calls for it to be improved, as the section between the M11 and Braintree was in the early 2000s.
ECC has worked up and consulted on its favoured route to "create a modern dual carriageway link connecting Braintree and the A12" to recommend to Highways England.
Given that the proposed route bypasses the current A120, there should be scope for improving provision for cyclists and pedestrians both along the new road and along the newly de-prioritised `old'-A120, especially around Marks Tey and its station.
Construction is currently slated for 2023-6.
Created by Simon Still // 1 thread
https://www.lcc.org.uk/articles/finding-your-way-on-londons-cycle-infrastructure-1
none of the apps that use OpenStreetMap as a base - Citymapper, Cyclestreets and Cycle.Travel amongst them - offer a great user experience and they all tend to prioritise complex back street rat run routes over Londons main road infrastructure. There's a real need to tweak these app routing algorithms so that new cyclists can benefit from the high quality infrastructure thats being built.
In future theres also the potential to do more with OSM - we would love to see “accessibility graded” routing as a future capability using information about path surfaces, gradients or things like width restrictions that are a problem for some types of cycle or rider
Created by John Chamberlain // 0 threads
From 17th August to 2nd October North Gower Street will be closed to all except pedestrians at the Euston Road junction. This blocks the signed cycle route between the Hampstead Road and the Euston Road pop-up lanes.
Created by John Chamberlain // 0 threads
From September 14th for 6-8 weeks, Tavistock Place will be closed to motor traffic between Herbrand Street and Marchmont Street. Cyclists will be diverted into the main carriageway.
20/03254/OUT | Outline planning with all matters reserved except for access for redevelopment of land for 44 residential units with public open space provision, landscaping, means of access and associated works following demolition of No's. 30 and 32 New Road, Over - Resubmission of S/1279/18/FL | Land At And To The Rear Of 30 & 32 New Road Over Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of garage to habitable space and erection of bike store in front garden.
2 Wilding Walk Cambridge CB4 1RH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of Community Cafe.
Chesterton Methodist Church, Green End Road, Cambridge, CB4 1RW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no. 1.5 storey dwellings and retention of existing flats, together with bin & cycle store and landscaping.
30 Davy Road Cambridge CB1 3QW
Created by Steven Moseley // 0 threads
EIA Scoping Opinion Request for a new link road between the A120 and A133 comprising dual two-lane carriageway; at grade junction connecting the proposed link road to the A133; two potential intermediate roundabout locations giving access between Allen’s Farm and the Garden Community development, and Tye Road (NW) and the Garden Community development; an underpass for future proposed Rapid Transit System and a diverted public right of way (PRoW); one grade separated dumbbell junction (two roundabouts linked by a single bridge) connecting the link road to the A120; new access road to Colchester Waste Transfer Station north west of the proposed A120 junction; and new two-way access to an existing petrol station west of the proposed A120 junction
Land between the A120 and A133, to the east of Colchester and west of Elmstead Market
Essex
Application reference : CC/TEN/94/20/SPO
sound+fury // 1 thread
This unusual application is just for the cycle parking and bollards for the former Sally Ann's shop.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
Created by Rosamund Humphrey (Admin Officer) // 0 threads
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
(Moved related thread created 2 months ago.)
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Further expansion of the Biomedical Campus
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of four dwellings, including a dropped kerb and associated infrastructure following the demolition of the existing buildings on site. | 8 Kings Hedges Road Cambridge CB4 2PA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Retrospective change of use from Hotel (C1 Use) to House In Multiple Occupation (HMO) (sui-generis) | Oakley Lodge 627 - 631 Newmarket Road Cambridge Cambridgeshire CB5 8PA
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Martin Lucas-Smith // 27 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Simon Nuttall // 16 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.