Ponding
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Iain Lane // 1 thread
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
Created by Iain Lane // 1 thread
The city council received a £6.1m grant from the D2N2 LEP to construct 4 radial routes. This is the first, a mixture of a physically segregated and a shared route.
I use this route twice every day and the cycle lane is always blocked by cars parked to use the shops or hotels on this street.
It makes the cycle lane pointless as I can't use it.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Richard G // 1 thread
There seems to be a number of cars parking half in the cycle lane on the new Addenbrooke's road (Dame Mary Archer Way)
Is parking in a cycle lane an offence of some sort, and would it make a difference on what I think is a private road? (I think that those roads around Addenbrooke's are not normal in terms of ownership)
Vegetation breaking through the surface of a, basically brand new, shared use path surface at Smeaton Bing.
Created by Jenny Barnes // 2 threads
If the level crossings either side of farncombe station were cycle/ ped only, with bollards in nightingale rd at the farncombe street end, and on frith hill, farncombe would be divided into 3 areas for cars, each of which would need to come out onto distributor roads. Further, if the New pond rd end of summers Rd as far as Brioadwater school were made one way southwest bound, any traffic trying to bypass the a3100/ Meadrow would be unable to.
Access Walden is a campaign group based in Saffron Walden.
Their objective is to create a safe walking and cycling link between their town centre and Audley End railway station, a journey of two miles.
Created by Bracken VanRyssen // 1 thread
The Brook Lane road badly needs cycle infrastructure and there is definitely the space available and small changes here have the potential to have a big impact on the route. Easy changes would be to resurface and open up the ends of the Brook Lane service road to allow continuous movement along it, as well as putting in a crossing for the Yardley Wood road. On the easterly section a protected bicycle lane for cyclists ascending and descending the hill could be created by moving the parking in the left lane further away from the pavement and using the resulting space (especially important for cyclists travelling up the steep hill).
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The path running in front of Petersfield Mansions (identified below in red) is only 1.2m wide. This means that when passing each other pedestrians and cyclists often have to use the grass which is problematic when it is wet and muddy. It is also difficult for residents of Petersfield Mansions when exiting their properties as there is very little space for people to manoeuvre around each other.
Usage of this path has increased over the years with more cyclists using the path to access the cycle racks which have been installed on Bradmore Street as part of the expansion of Anglia Ruskin University. It is therefore proposed to widen the path by 1metre to cater for this increased usage and to improve access from Mill Road with the removal of a short section of railing and the installation of a flush kerb.
Petersfield is owned by the City Council and the path in question is maintained by the County Council as highway.
The cost of these works is approximately £20,000 and this project will be joint funded by Cambridge City Council and Anglia Ruskin University.
The path marked in blue is maintained by the City Council and we hope to improve the surface of this path at the same time if funding can be identified.
If you have any comments regarding the widening of this path or would like more information please contact cyclingconsultations @ cambridge.gov.uk by 14th September 2015.
Anon // 1 thread
KCC consultation on reduction in speed limit to 40mph
http://consultations.kent.gov.uk/consult.ti/40mphspeedlimitheadcorn/consultationHome
Consultation closes 28 Sept 2015.
Created by Dexter Johnstone // 1 thread
Weston Street is an advisory cycle route and should link up with the University of Sheffield concourse. However, it does not and you currently have to cross 3 lanes of traffic. The road is often very busy. There should be a toucan crossing instead of the pedestrian crossing, a short off road cycle path across the large grass verge could link the crossing to Weston Street.
Created by Chris Paton // 0 threads
City of Edinburgh council have done good work trialling a segregated path for NCN1 on George Street. Although the trial is coming to an end it's clear from their documents and consultations that George Street will remain the primary east-west route for cyclists travelling through the city centre and more investment is planned.
The problem is that there is very poor access to this route from the West End for any cyclists who have come along Shandwick Place or Rutland Square (including cyclists from the big offices nearby). Heading east, cyclists have to go through the busy West End road junction and then brave cars sweeping into South Charlotte Street as they turn left while simultaneously needing to find a way across two lanes of traffic to the middle of the road to turn right onto George Street -- scary stuff even for a competent cyclist.
Space is always at a premium but there do seem to be options for improving this with minimal loss of road space. A two-way cycle path could be constructed across the paving to link Hope Street with Rutland Place. With careful design this could be done to minimise impact to the pedestrian space and with reconfigured light timings cyclists could emerge from Hope Street to turn left or right, and likewise cyclists from Shandwick Place and Princes Street could turn into the new path. In addition, a left turn strip at Lothian Road onto Rutland Place would provide access to this new path for cyclists from Rutland Square and Lothian Road.
Created by Bracken VanRyssen // 1 thread
The only cycle access to the train platforms at Solihull station is an extremely small lift, otherwise your only option is carrying your bicycle up and down the stairs which can be quiet challenging. A simple solution would be a wheeling rail at the edge of the stairway to guide wheels down slowly. I see quite a few people with bicycles using the train and I myself do so on a weekly basis and two flights of stairs with a laden bicycle certainly make things tricky.
Created by WildNorthlands // 1 thread
Generally I'd say Brunswick St works well as a bike route but the gate between these two roads and the junction is poorly placed - in order to get through it you need to be on the wrong side of the road on a blind bend and it is common to find yourself coming head to head with a car coming the other way. if there were too gates for each direction, and the northbound was lined up with the cycle lane, it might help.
Created by Dominic Fee // 1 thread
Westminster City Council is undertaking a statutory consultation on the Traffic Management Orders (TMOs) needed to implement the East West Cycle Superhighway at Parliament Square. You can find a description and drawings of the proposals here:
http://westminstertransportationservices.co.uk/tmo/tmo_details.php?tt=2&id=909&cid=1
In Westminster Cycling Campaign we rarely respond to statutory TMO consultations because the proposals are either insignificant or, if they are significant, they've usually been subject to an earlier public consultation. It would be inappropriate for us to repeat points we've made previously, and we wouldn't be listened to.
Nevertheless I would encourage interested people to take a look at the Parliament Square drawings to check that the earlier design has been taken forward properly into a detailed design for construction. We have had a recent example where we did respond to a statutory TMO consultation in which the connection between part of the EWCS proposals (Savoy Street) and the rest of the highway network (a left-in left-out junction on the Strand) hadn't really been thought through. If we need to submit a response regarding Parliament Square, the deadline is 21 September 2015.
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Single storey front, side and rear extensions.
58 Willingale Road Loughton Essex IG10 2DB
Epping Forest
Application reference : EPF/1025/15
Created by Heather Coleman // 4 threads
I can't find anywhere sensible to put such things so this is a general issue for people to start specific threads pertaining to temporary closures.
Created by Donald Noble // 1 thread
A barrier has been erected when the NCN7 cycle path joins the A86, presumably to stop children from cycling onto this busy road. However, this blocks the dropped kerb at this location, and no alternative is available without cycling some distance into Kingussie on a footpath which is not marked as shared use.
The barrier also limits the entrance to the cycle track, which could make it difficult for people with trailers or alternative bikes
Phil Wigglesworth // 1 thread
They're building lots of flats off Rustat Road, which is on a major cycle route and also is the main area for freloading railway station users.
There are some issues with control of the building work, specifically:
- trucks blocking Fanshawe and Rustat Road at peak times causing dangers to cyclists
- mud on the road making the Fanshawe/ Rustat road junction dangerous
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Outline application for the demolition of existing industrial and office units and 5 dwellings and the erection of up to 90 dwellings, together with associated garaging, parking, public open space, landscaping, access, highways drainage and infrastructure works. All matters reserved except access.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Demolition of Daedalus House and construction of a new 7 storey office building comprising of 9026 sqm (GEA) of office floorspace (class B1); cycle parking spaces; associated plant; hard and soft landscaping; a basement with 51 car parking spaces and 7 motorcycle bays; infrastructure works. | Daedalus House Station Road Cambridge Cambridgeshire CB1 2RE
Created by Jean Dollimore // 1 thread
Official title: "CENTRAL LONDON CYCLE GRID - PRATT ST AND DELANCEY ST PROPOSED WALKING AND CYCLING IMPROVEMENTS"
This consultation proposes the construction of an important two-way east-west cycle route across Camden Town.
It will run from St Pancras Way along Pratt Street, across Royal College Street to Camden High Street, where a two-way cycle crossing will be provided.
It will then run two-way along Delancey Street as far as Mornington Terrace.
A later consultation on the continuation of this route to Regents Park is promised.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by North Devon Cycling Forum // 0 threads
Removal of difficult barrier on cycle path NCN3 ending on Rose Lane; hardly possible to pass by bike, let alone trikes/tandems/mobility vehicles,
note this is NCN!
Created by Dawes Jaguar // 0 threads
This crossing is a problem for all road users, and it's quite common to hear blaring horns and screeching tyres. Pedestrians have a Puffin crossing, but for cyclists there is nothing. There is good reason for cyclists to cross Linden Road here, as it connects the bulk of the Bournville housing with the Worcester and Birmingham canal and the Rea Valley cycle route, and the motor traffic levels on Mary Vale Road are tolerable. Linden Road, on the other hand, is busy with motor traffic, including trucks. So the crossing needs to be improved, especially for cyclists heading along Mary Vale Road. Helpful to cyclists would be changing the priority in favour of Mary Vale Road. This would also encourage motorists to slow down on Linden Road. Unravelling routes in this way (so that cyclists cross main roads at a right angle and giving the cycling route priority) is one of the ways the Dutch encourage people to cycle rather than drive. Other possibilities are traffic lights or a mini-roundabout.
Created by Alex Jenkins // 1 thread
The consultation page states "A review of the Cheshire Street North 20mph zone has been undertaken and a number of improvements have been suggested making the roads safer and encouraging more walking and cycling in the area. The proposals include new cycle facilities, a one-way system on Wood Close, road closures and new crossings, as well as planting new trees in the area."
Link here: https://www.pclconsult.co.uk/projects/cheshire-street/
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Shaun McDonald // 1 thread
http://www.travelipswich.co.uk/what-is-happening-and-where/orchard-street-area/
What’s Proposed:
January 2014
* New cycle facilities to allow cyclists to travel northbound on Orchard Street.
* A 'No Entry except for cyles' sign to be placed on the St Helen's Street/Orchard Street junction.
Anon // 0 threads
The cycle parking on Parliament Street is great even though there isn't enough of it on a weekend, but when events are on such as the Christmas Market or Food Fairs it's a nightmare to get your bike down Parliament Street past the crowds of people to only find all but one row of racks is blocked by tents. It would be much better if all the racks were moved down to the Pavement end of Parliament Street.
Created by MikeC // 1 thread
As part of the highways 'improvements' associated with the proposed New Monks Farm development in Lancing, the existing minor road N-S crossing of the A27 by the Sussex Pad (Coombes Road to Old Shoreham Road) is to be closed and replaced by a large multi-lane light controlled roundabout some 400m west of the existing crossing. The only assistance for vulnerable road users will be several Toucan crossings as part of the roundabout light controls.
Net result will be an additional 1km diversion for anyone going south into Shoreham, plus additional time waiting at Toucans. An underpass on the existing crossing alignment would be the preferred solution, as recommended in IAN195.
Created by Kevin Ablitt // 1 thread
Twice in the past week I have been cycling up St Johns to make a rh turn onto Cauldwell Hall and nearly been taken out by a driver taking the corner too fast as they travel north bound along Cauldwell Hall and turn down St Johns Rd.
The problems are too fast traffic on Cauldwell Hall and poor design at that junction , need an island to separate traffic.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Jean Dollimore // 3 threads
From time to time, we receive consultations on Play Streets and rather debating each one as it comes in, I think it could be helpful to have a policy as to whether CCC want to respond as a group and the position we should take.
Play Streets are achieved by the occasional closures of a stretch of road to enable children to play (e.g. twice a month for a couple of hours).
The road closures are usually operated by local residents using ‘road closed’ signs, advanced warning signs and barriers.
Play Streets are not directly connected to cycling. But, as they may give people an idea that it would improve the area to have longer term road closures, I would like to support such schemes.
Hamish F // 1 thread
Quoting from the proposal: "This short section will provide an initial link from the A105 major scheme to the Salmons Brook cycle route." Part of Quietway 18.
The main feature is an improved junction at Bury Street West and Church Street, with a 2.5m wide two-way cycle track to take cyclists from that junction to Blakesware Gardens (and onto the Salmons Brook cycle route).
Also some rain gardens and other improvements.
What's not to like, comments please ...
Created by George Coulouris // 7 threads
This issue is intended to act a repository for material that can be used to back-up the LCC's 2014 Local Election Campaign 'Asks'. There are 6 'asks' that were finalised and agreed at the LCC's AGM on 19 October 2013:
1. Safe routes to schools
2. Areas without through motor traffic (AWTTs)
3. Protected space on main roads/major junctions
4. Safe cycle routes via parks and canals (Greenways)
5. 20mph speed limits
6. Liveable town centres
so we'll have 6 threads under this Cyclescape issue where we can collect explanations, discussions and most importantly concrete illustrations of what is meant by each ask.
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
Created by Chris Peck // 1 thread
With the welcome completion of the cycle path linking Marshall Road to Bridge Road, the weaknesses of links on either side of the route become more apparent.
Bridge Road is a busy, narrow main road. Traffic mostly has to wait behind cyclists, creating uncomfortable conditions for all but the brave. Both roundabouts (at the Chalk Road/Meadrow and the Bridge Street/Wharf Street junctions) are difficult for cyclists (and pedestrians).
An alternative route, either running parallel to the road (a widened shared use footway?) or a raised boardwalk across the Lammas Lands, are alternatives, but both are expensive, challenging options, which require new or wider bridges over Hell Ditch and the River Wey.
Created by David Butler // 3 threads
The Bridgewater Way aims to provide a high quality route for walkers and cyclists over the complete 65km length of the Bridgewater Canalbetween Runcorn, Leigh and Manchester City Centre. The cornerstone of the project is a major upgrade to the canal towpath, which as well as greatly improving conditions for pedestrians, will make it easier for cyclists to use the tow path.
The Deansgate / Whitworth Street West Street junction is also proposed to be revised to provide toucan crossing points and easier access to the canal from Whitworth Street West withsignal controlled cycle movements running past Deansgate station. The proposed works at the
junction are also intended to provide improved “on street” facilities to assist cyclists travelling towards and away from Manchester city centre.
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
Kate Ravilious // 1 thread
Car parking obstructs cyclists travelling uphill, forcing them to stop and start on a steep uphill section, or move into the path of oncoming traffic travelling downhill.
It would be safer to have car parking on the other side of the road.
Created by Gingineer // 1 thread
I work near the station and the area out the front of the new building has short term cycle spaces for the shops there. These spaces are specifically for the retail units (ratios of this is in the planning application I understand). so the racks have to be installed and wont be policed by the retail units (such as the ones by Microsoft which are for employees) yet they fill with commuters who should be using the cycle park.
I have been thinking that Cambridge CC needs to agree a system (bye law?) to create short term racks. The colour should be different and signage provided but for racks that need controlling like this it is essential to stop antisocial cyclists piling up bikes.
Of course its difficult to police, and a heavy handed approach should be avoided but I see a growing issue across the city where racks for specific short term purposes are created but then filled with long term cyclists who should accept if they are parked all day that the extra 2 minutes walk for them to a proper cycle park is reasonable to expect. Otherwise this puts people off cycling the short distances as they fear they wont get a rack or will spend a lot of time scrambling for a spot.
Cyclists could be stickered and if caught again then fined. Or clamped to the rack with a fee to unlock (yes I know that sounds like it defeats the object but it should work after a while).
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf