Westbrook centre redevelopment
There are plans to redevelop the Westbrook Centre to a life sciences campus.
There is a "listening event" today Wednesday 17th May 3pm at St Luke's Church, Victoria Road.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Nick Flynn // 1 thread
There are plans to redevelop the Westbrook Centre to a life sciences campus.
There is a "listening event" today Wednesday 17th May 3pm at St Luke's Church, Victoria Road.
Created by KW // 1 thread
Eight flats, six car parking spaces, eight bike parking spaces. Access from Cherry Hinton Road, within the queue region for the 'Robin Hood' junction, across the existing shared-use path.
sound+fury // 1 thread
Change of use of first, second and third floors from office (Class E) to student accommodation (Class C2) comprising 8 student rooms and ancillary facilities. External works comprising the installation of an external staircase and entrance, PV panels to the roof and an Air Source Heat Pump at ground floor level. Installation of two openings into the listed wall for means of access and daylight to the rear.
First Floor And Second Floor And Third Floor 98 Regent Street Cambridge Cambridgeshire CB2 1DP
Cambridge
Application reference : 23/01701/FUL
Created by Ruth Corns // 1 thread
I noticed that on the plans for the ongoing Milton Road development, the plan for a new double split cycle/pedestrian crossing across Milton Road near Chesterton Hall Crescent/Ascham Road has the cycle crossing on the East side and the pedestrian crossing on the West side. The problem with this is it is the opposite way round from the way cyclists/pedestrians approach the crossing from Chesterton Hall Crescent (cyclists on the West, pedestrians on the East). In the mornings, this crossing is extremely busy with pedestrians and cyclists travelling from South to North (to reach Milton Road primary school and Chesterton Community College), and at the north side of the crossing, cyclists need to be on the West side to travel up Ascham Road and the pedestrians tend to walk on the east pavement. The new crossing plan would mean cyclists having to cross the flow of pedestrians on both sides of Milton Road. This would lead to queues of bikes on the crossing (in the road) and seems quite dangerous. I think it would create a natural flow if the crossings were switched to have the cycle crossing on the west (and this is how cyclists and pedestrians naturally organise themselves on the current toucan crossing)? I've included a photo where I've drawn arrows showing the cyclist/pedestrian flow lines in the current plan and if the crossings were switched. It hasn't been built yet so I wondered if there is a way to suggest this to GCP and do you think a change would be considered at this stage?
Created by cpax // 1 thread
Hi ! , I am writing to you to voice my concerns that the Bridleway ( Mile Road ) between the Roman Road and the A 1307 is
under threat .
As a regular user of this route ( cycle ) I first noticed that the finger post on the A 1307 had been removed some weeks ago
and on passing that way today found mounds of earth had been pushed up to the large gate making it almost impossible to
pass through . This route is heavily used by people wanting to go from Fulbourn to Babraham or just for walking . It is a well
defined route on all the maps / cycling Apps . I am incredulous that this threat to this route can so easily be blocked .
Created by Anna Williams – Head of Campaigns & Engagement // 4 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for commitments to active travel and sustainable transport.
Hybrid Planning Application at Land South of Coldhams Lane comprising: Full Application for 'Parcel A' Building 1 (Use Classes E(g)(i) (Offices), E(g)(ii) (Research and Development)) and the Hub Building (sui generis) with associated car and cycle parking, Outline Application for the remainder of 'Parcel A' for E(g) uses including office, research and development, car and cycle parking, landscaping, infrastructure and associated works, with all other matters reserved except for access, Full Application for ecological enhancements to 'Parcel B', Full Application for landscape improvements and access to 'Parcel C'.
Land South Of Coldhams Lane Cambridge Cambridgeshire
Cambridge
Application reference : 23/01683/SCOP
Created by Heather Coleman // 1 thread
Temporary fencing, for no apparent purpose, that then becomes a hazard as it falls over or degrades.
Created by Jonny Camp // 1 thread
How can we tell whether a bicycling environment is good or bad? How many times have you been cycling along a piece of existing infrastructure only to find the word 'end' written on the pavement and yourself forced back onto the road into traffic?
With this in mind, I am undertaking a piece of research as part of my masters dissertation at Queens College, University of Cambridge. I am gathering primary data of existing users of the current cycling network across Cambridge. From this data I will be able to assess the coherence and directness of the existing cycle network and identify potential 'bottlenecks' and issues from the point of view of the users.
Created by Martin Wheatley // 1 thread
Because of a combination of subsidence and grass tussocks growing through the path, my wife's e-trike tipped over on the Greenway path between Lode and Longmeadow this afternoon. Fortunately she is only bruised and shaken but it could clearly have been a lot worse. I have reported it to Cambs Highways as an emergency.
Unless and until it is repaired, I would advise extreme caution on this section of the Greenway or use the Bottisham Greenway, Tunbridge Lane, Park End and Swaffham Bulbeck High Street instead. The on-road sections of the latter are usually pretty quiet.
sound+fury // 1 thread
The area covered includes the cycle route to Church Road. It may also be useful to look at the cycle parking.
Martin Lucas-Smith // 1 thread
Downing College are proposing to extend and rework the old 'Pizza hut building' on the corner of Parker's Piece.
I can't see any obvious issues other than making sure that sufficient cycle parking is created. I think they are intending to put this within the main college grounds themselves, over the road, which probably makes most sense.
sound+fury // 2 threads
This (apparently) revised draft leaves little/nothing for any other forms of transport and continues a policy of road expansion.
Martin Lucas-Smith // 1 thread
Change of us from Class E to a composite restaurant (Class E) and takeaway use together with external changes
56 St Andrews Street Cambridge Cambridgeshire CB2 3DA
Application reference : 23/00795/FUL.
The plans indicate that the existing heavily-used cycle parking will, at least in part, be removed.
sound+fury // 1 thread
Not much information yet, but Hills Road Sixth Form College are hoping to create a second base to the north/east.
Plaza adjacent to proposed primary school on key phase 1
Waterbeach Barracks Key Phase 1 Primary School Plaza Denny End Road Waterbeach Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 23/00872/REM
I haven't spotted whatever it is that is supposed to provide "access for picking up and dropping off pupils". There seems to be a 5-Sheffield toastrack ("exact product TBC") on what looks like the 'drive' (next to 'He' which means heritage surface coarse asphalt). I do not see anything that would encourage use of Bakfiets etc.
Image is a crop from LANDSCAPE GENERAL ARRANGEMENT PLAN
I have noticed that especially since the congestion charge there has been a lot of aggression towards Camcycle in social media comments. Notably on Facebook, Nextdoor, etc. I am aware that angry aggressive people have always been on the internet but I do feel the level has increased since congestion charge notoriety, with many people's opinions degenerating into conspiracy theories about Camcycle and the council.
I do worry about the effect this can have on increasing "us vs them" mentality and increasing aggressive behaviour towards cyclists on the road.
sound+fury // 1 thread
We might need to look at the road layout proposed here.
Created by Richard Holton // 0 threads
Works on the Greenway on east side of the Horningsea Road. No provision for cyclists to pass safely. Only option is to cross at previous pedestrian crossings, though there is no signage to indicate this.
Created by George Lund // 1 thread
Improvements required for safe crossing of walkers, cyclists and horseriders using the main path through the forest.
Created by Gabriel // 1 thread
The County Council is proposing some of those cheap and nasty speed cushions at Birdwood Rd. Link: https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-tro--reference-number-pr--------proposed-speed-cushions-in-birdwood-road--cambridge--9-0
Closing date for comment is 17 March 2023. Email to: policyandregulation@cambridgeshire.gov.uk
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a container issue for event threads.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cambridge City Council have launched this new consultation as part of the Our Cambridge programme which aims to shape the council of the future. This may be relevant to our work because it includes thinking about how the council works with its stakeholders.
sound+fury // 1 thread
A previous application was refused in part because of the cycle parking provision. What's the new one like?
Created by David Green // 1 thread
Are you confident at what to do if something goes wrong with your bike when you're miles from home? Could you repair a puncture by the side of the road? Yes? Great! No need to read on.
No? You may be interested in the following Saturday workshop I am running again. This will be a repeat of the popular workshop held last year where attendees gave feedback such as:
"Excellent - would recommend it to all inexperienced riders."
"Following the course I really feel I understand the workings of my cycle."
"It was very clearly explained and covered very useful topics."
"Thoroughly informative workshop. To be highly recommended."
David Green
===
Survival Skills for Cyclists
Venue: Coleridge Community College, Radegund Road, Cambridge CB1 3RJ
Date: Sat 25 March 2023, 10am to 4 pm
Description: A one day bike maintenance course for local cyclists. Bring your bike and get confident you can cope with common roadside cycling breakdowns. Women members especially encouraged to sign up! Places are limited to ensure you learn in a small friendly group and get all the assistance you need. Topics will include: checks before you set off, tools to take along, fixing punctures, handling chain problems, gear and brake adjustments.
Equipment: Your own bike to work on, pump, puncture repair kit, and any tools you normally ride with.
Refreshments: hot and cold drinks provided, but please bring your own lunch!
Fee: £20 (CTC and CamCycle members) £50 (non-members). Subsidy available for those on a low income - please don't be put off by the price. Primarily funded and supported by CTC Cambridge.
Enrolment: To book a place, email da...@guertler-green.co.uk with subject 'Survival Skills for Cyclists 25 March 2023'.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
There are relatively shallow paths that run from both ends of the bridge down to the A4143, but both have shallow steps that stop them being useful to cyclists. This means that people heading out of the hospital wanting to cycle down the A4143 towards Llanfoist have to cross the road with the traffic, rather than the safer alternative of crossing the bridge and coming down the ramp.
Note that openstreetmap's map of this is incorrect. I'll submit a correction (11-04-2014)
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by T Harris // 1 thread
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by Roxanne (CEO) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Belle Vue Road is very steep for a recommended cycle route."
It's marked on the Ipswich Cycle Route Map.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Lewisham Cyclists // 1 thread
Royal Borough of Greenwich consultation on improvements to road junction at Blackheath Gate of Greenwich Park for Quietway 1 extension.
Consultation closes 19th April 2019.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Charles Martin // 1 thread
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by Mike Comerford // 1 thread
Those of us living in the area marked have no safe access to the cycle network in order to cycle in and out of Dumfries. There are many keen cyclists in this area (as evidenced by the Toirthorwald Cycle Sportive for example).
I live with my family in a cluster of houses close to the A75 (Mouswald Banks) end of Linns Road. There are a number of cyclists at this location and we wish to cycle to Dumfries for work and for social / leisure reasons.
Our Options are:
- the A75 - definitely not safe
- to Torthorwald then along the A709 - narrow, full of heavy trucks, no pavement and very unsafe
- through Torthorwald, across the A709, onwards to Tinwald and then onto the A701 towards Dumfries until able to join the Caledonian Cycleway at Locharbriiggs. This stretch of the A701 is narrow and full of heavy trucks. Where there is a pavement it is too narrow to cycle along it. This is also a long way round to get to Dumfries.
The best solution would be to create a cycle path from Torthorwald along the A709 and through Heathhall woods to connect with the cycle network. This would serve Torthowald, Collin and surrounding hamlets. There is land along the side of the A709 to allow space to make a cycle path.
The shortest in terms of building new infrastructure, would be to make a cycle path along the A701 from the Tinwald road end to Locharbriggs. However space at the roadside along the A701 is very limited, and the route is a long way round for the communities from Torthorwald and Collin.
Building a cycle path along the A75 is an unlikely and unattractive proposition and would cause disruption along a major Trunk road.
Active travel is a priority for the Scottish Government to increase physical activity and reduce traffic emissions. Funding is available through Sustrans.
'Sustrans Scotland's Community Links programme provides funding for the creation of infrastructure that makes it easier for people to walk and cycle for everyday journeys. The programme is funded by Transport Scotland and has funded hundreds of projects across Scotland since 2010.
Through the Scottish Government's Programme for Government 2017-18, the active travel budget has been doubled to £80 million per year, from 2018-19. Community Links will help deliver a key action from this by supporting projects that make our towns and cities friendlier and safer places for people to walk and cycle.'
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.