Cycle parking at Cambridge North
How exactly more secure cycle parking will work.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Martin Wheatley // 1 thread
How exactly more secure cycle parking will work.
Created by Gregory Williams // 1 thread
The cover has gone from the cycle parking opposite B&M Home Store, leaving cycles more exposed to the weather.
Created by Gregory Williams // 1 thread
Each winter the Crab & Winkle Way gets a puddle across the full width of the route a little south of Tyler Hill Road. This can freeze over as ice and mask potholes in the surface beneath.
Created by Josh Grantham // 1 thread
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
Created by KW // 1 thread
23/04936/FUL | Full planning application for the construction of 91 new homes with associated infrastructure, internal roads, open space as part of phase 3 within the Marleigh development as a modification to outline permission S/2682/13/OL to increase the overall unit numbers across the site to 1,391 homes. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by KW // 1 thread
23/04930/REM | Reserved matters application detailing, appearance, landscaping, layout and scale for the construction of 332 new homes and commercial space with associated infrastructure, internal roads, open space as part of phase 3 pursuant to condition 5 (reserved matter) of outline permission S/2682/13/OL dated 30 November 2016. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by Gregory Williams // 1 thread
A tree has fallen blocking NCR1 at Duke's Meadow. In the meantime it is still possible to cut across the grass to continue the route.
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
Tom McKeown // 1 thread
First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.
Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE
South Cambridgeshire
Application reference : 23/04537/FUL
Created by Edward Bainton // 1 thread
Crossing from Bright Street to Geneva Street, the cycle lights do not sense the bike. You can sit through 10 phases and you never get a green light.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by Isaac // 1 thread
Recent roadworks have left the cycle lane entering Cambridge in an unusable state. There are large bumps across the width of the cycle lane which makes cycling along it dangerous. Needs to be fixed asap.
Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.
Land At Ditton Walk Cambridge Cambridgeshire
Cambridge
Application reference : 23/04380/FUL
Not shown in the plans, but suggested in the D&A: a pedestrian link between Ditton Walk and the Trail
Created by Campbell Mccaig // 1 thread
A real lack of strimming too making some paths nearly unuseable.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for the 2024 AGM are well-underway!
Please join us on Saturday 20 January, 2-5pm at Storey's Field Centre (main hall).
Created by Gregory Williams // 1 thread
The River Dour Greenway sign pointing into Lorne Road from the shared path beside Buckland Avenue is missing. Previous Google StreetView imagery shows the sign which has gone missing:
Created by Gregory Williams // 1 thread
Bollards on the path used by the River Dour Greenway between Alfred Road and Brookfield Place limit access for people with trailers or on tandems.
Created by Martin Wheatley // 1 thread
Absolutely disgraceful deposit of mud by tractor drivers hauling harvested beets on Fen Lane (the back way to the north of Swaffham Bulbeck which many of us use to bypass the unpleasant B1102 through the village). In my opinion it is not currently safely passable on a bike. I was on foot, in wellingtons, and found it hard to stay upright. The number of tractors and the aggressive speed at which they are being driven is an additional hazard. Until this is cleared up, the options are the main road through the village, or (somewhat longer but much less busy), divert via High Street, Quarry Lane and Heath Road back on to the B1102 and the Greenway to Swaffham Prior north of the village.
Created by Gregory Williams // 3 threads
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
Created by Gregory Williams // 1 thread
There is a comparatively new shared path linking Burgess Road to Alyesham's station. However the Burgess Road end of the shared path doesn't have a dropped kerb to allow a transition between road and path and vice-versa.
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
Created by Gregory Williams // 1 thread
The sign towards the Town Centre is missing. Previous view of the sign here:
Created by Gregory Williams // 1 thread
The sign pointing into Alfred Road at Lorne Road is missing.
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (CEO) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821