No dropped kerb
Need a dropped kerb to allow access to East Craigs Path Network
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by HankChief // 0 threads
Need a dropped kerb to allow access to East Craigs Path Network
Created by HankChief // 0 threads
Poor set of partially dropped kerbs here across entrances to shell garages.
To get from the Toucan crossing of Maybury Road to North Gyle Terrace you have to bump down & up 2 sets of bad kerbs
Created by HankChief // 0 threads
Needs a dropped kerb to exit this cut-through onto the road
Created by Andrew Woodward // 0 threads
The section of the cycle network from Boileau Rd to Hammersmith Bridge is poorly signposted, inconvenient and suffers from poor subjective safety.
Created by HankChief // 0 threads
No dropped kerb to enter or exit the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to enter or exit the East Craigs Path Network.
Created by TMiles // 0 threads
St Michael's Road can be a useful local route for west-bound cyclists avoiding the central junction in Headingley and its approach roads, dominated by queuing traffic or parked cars.
The current configuration could be improved to allow cyclists approaching the junction to cross directly from St Michael's Rd into the cycle box immediately in front of the traffic lights at the northern extremity of Cardigan Road.
A dedicated traffic signal, coordinated with the parallel pedestrian crossing (to the extreme right of the image), would allow cyclists to cross from the island in the foreground to the advanced stop line in the far lane.
These improvements would require very little actual ground work, instead making use of smarter signal control. Further adjustments to the sequencing could see cyclists granted a synchronized left turn into Kirkstall Lane.
Created by timlennon // 0 threads
Facilities to cycle to school are extremely limited, mostly involving sharing pavements which are busy in the morning. Lots of dropping of by car in a very restricted area, and disjointed, incomplete routes, especially around the South Circular, where no-one really wants to cycle, least of all with children.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
This re-design (incl re-alignment) is a pure 1960s motorway scheme. Very disappointing.
Pedestrians and cyclists are virtually NOT considered here.
http://newcycling.org/sites/default/files/105_salters_church.pdf
Some rejigging
There some flaws in the design. Pedstrian desire lines are ignored leading to staggered / staged crossings. The whole design does not do much for the public realm in general and the area remains an 'urban motorway'.
The cycle lanes (width unknown) are an inadequate separation for the volume/speed of traffic and not even elephant footprints across to guide cyclists across the wide opening of the Regent bus stop entry have been included.
Regent Farm Road entry should be closed down.
We do not hold out much hope for the traffic light phasing. They will likely to be conventional highway design too.
Plan is downloadable here
http://newcycling.org/sites/default/files/104_regent_christon.pdf
Created by Katja Leyendecker // 0 threads
Major re-design
There are many flaws in this conventional highway road design. Pedestrian desire lines are disregarded. No cycle-specific light phasing has been included it seems. ASL are a token effort. No elephant footporints. But the biggest mistake is to keep the left-turn filter. It really puts cyclists directly at risk and in conflict with drivers - we urge council to remove that filter.
There also is a new right-turn lane into Knightsbridge which puts cyclists at risk of turning drivers. The entrance to Knightsbridge should also be necked-down for pedestrian and cyclist safety and comfort.
Plan is downloadable here
http://newcycling.org/sites/default/files/103_hollywood_pale_.pdf
Some re-adjustments. Includes cycle space and necking-down on Park Avenue are good.
Not so good is inconsistency in the cycle infrastructure design, and disregard to pedestrian desire lines over Park Avenue (which could be rectified by moving the raised table), and no necking-down of Harewood Road.
Plan is downloadable here
http://newcycling.org/sites/default/files/102_park_harewood.pdf
Created by Katja Leyendecker // 1 thread
Large scale re-design.
Looks okay, even quite innovative, some design clarificaitons are needed re: turning speeds / neckdowns, separation types, transitions
Plan is downloadable here http://newcycling.org/sites/default/files/101_broadway.pdf
Created by MJR // 1 thread
Downham Market has National Route 11 running through it roughly north-south but doesn't have much of a signposted cycle network otherwise. There are some useful cut-throughs so this looks like it could be an ideal market town for cycling with relatively little work.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
20 mph speed limit for Newport area, enclosed by the river Taw, The Square, Belle Meadow Road, Inner Relief Road, Hollowtree Road, South Street and Park Lane.
Created by North Devon Cycling Forum // 0 threads
20 mph speed limit in Ashleigh Road area, especially on route Ashleigh Road-Barbican Lane
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath and widening to shared path on north side of Ashleigh Road Approach Road (requiring NEW lay out of one-way Approach Road, moving parking bays to disused opposite south side of Approach Road). Current vegetation can be replanted as buffer between new shared path and main carriageway, so nice look of road won't be affected.
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Inner Relief Road to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath and widening to shared path between Oakleigh Road and pelican crossing on Inner Relief Road
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath to shared space on triangle at start Summerland Street; natural feeding route on/off triangle to pelican crossing on Belle Meadow Road
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Belle Meadow Road to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
Upgrade footpath on east side of Queen Street and Queen Street Roundabout to shared path, from Hardaway Head to Pelican Crossing Belle Meadow Road (taking space from main carriage way)
Created by North Devon Cycling Forum // 0 threads
20 mph speed limit in Chanters Hill area, especially on route Sunset Heights-Sowden Lane
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.