Contraflow on Queen's Road
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by fh // 1 thread
At busy times of day, it is very difficult for cyclists to turn out of Pembroke Street when turning right onto Trumpington Street. Trumpington street has priority and there are no traffic lights. This creates the following problems:
1) Cyclists turning out of Pembroke Street right onto Trumpington street when there is not enough space/time to do so. This causes a lot of braking and it is common to see a lot of people braking or hear a car horn because of this.
2) Build-ups of cyclists waiting to turn out of Pembroke Street get in the way of buses turning into Pembroke street (as buses need more turning space).
This is particularly bad around 9am.
Created by Andrew Woodward // 0 threads
Can we include the Star and Garter Hill in our list of shared footpaths (actually a footway in this case). Slow-moving cyclists travelling up the hill from Petersham Gate to Richmond Gate have difficulty with fast passing cars on the hill who overtake too closely. This does not occur in the downhill direction because cyclists can travel much faster. The suggested solution is to permit cycling on the footway up the hill only. There are very few pedestrians and in any case the cyclists will necessarily be travelling very slowly so they would cause no problems. The traffic signals at the bottom of the hill would need some alteration to facilitate cyclists crossing from the Petersham Road onto the footway up the hill.
Created by christhebull // 0 threads
The northbound approach to this junction poses a significant hazard for cyclists bearing right onto Gloucester Road, due to the poorly delineated approach and potential conflicts with traffic taking other exits, namely:
1) Cyclists are at risk of being left hooked by vehicles turning left into Zetland Road, and adopting a more central road position may result in the unsettling experience of having faster traffic pass on both sides
2) Cyclists using the central filter lane to access Gloucester Road are at risk of colliding with traffic continuing into Elton Road from the right hand lane - this is because there are no arrow markings painted in the approach lanes, nor any markings in the junction itself to tell road users which lanes to adopt so as to avoid this conflict.
Therefore, I consider it necessary for this junction to have, as a minimum, arrow markings showing which movements are permissible from which approach lane, and markings within the junction to further clarify this. The left hand lane ought to be used by traffic turning left or continuing straight, and the right hand lane for continuing on Gloucester Road only.
If the opportunity for a more substantial rebuild occurs at some point in the future, a wider filter lane should be provided, or some other solution sought.
The other directions of travel at this junction are clearer (apart from the southbound contraflow lane which ends on a pavement, but that is probably less of a road safety issue)
I am fully aware there are proposed changes relating to Gloucester Road under the government's Cycle Safety Fund, but the plans which I have seen do not rectify this particular issue (but if I see the relevant people in the near future, I will raise this issue with them).
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Martin Lucas-Smith // 3 threads
Huntingdon Road currently has rather narrow cycle lanes, which are unnecessarily so since this is quite a wide road.
There is space here to create really high-quality, direct, cycle infrastructure which retains priority at sideroads and which would encourage new people to start cycling.
Martin Lucas-Smith // 0 threads
There isn't any cycle parking outside this excellent charity centre. A small row of sheffield stands outside the building would be very useful.
Created by John Hall // 0 threads
Cambridge Cycle Brochure
Just a starting point
Format A4
4 to 8 pages
Images and artwork
Audience - Provide solutions for:
school run
commuters - better experience
older people
non cyclists - journey times
improve you neighbourhood
car free households - Zip cars
council officers
village residents
- taxi drivers and our critics
Delivery - with News and Crier?
A test delivery could be used to assess the response to the brochure in terms of new memberships or visits to a web page
Subjects
off road routes to drivers such as along the Cam
3D barcode links to video etc
Segregated cycle routes
Hub and spokes to villages
The CT
West Cambridge Development
Why should new development contain cycle paths?
Why should new buildings have good cycle facilities?
What kind of bike training is available?
Membership form perhaps with a discount for direct debits?
Priority over side roads / platforms / set back crossing
Build it and it will be used e.g. Shelford Path 300k users per annum
Health benefits
Noise pollution
Who pays for roads
Cargo bikes
Go Dutch
Created by Andrew Woodward // 1 thread
Despite the mandatory cyclelanes there are few cyclists who use them, probably due to the high volumes of traffic. The street is wide enough for proper segregation; and is a main route to Kew Riverside school.
Created by Andrew Woodward // 0 threads
Cyclists crossing the junction on the road (not the pavement) going north are frequently squeezed by the pinch point created by the central pedestrian crossing refuge at the mouth of the A205 and junction with A316
Created by Andrew Woodward // 1 thread
This stretch of Clifford Ave joins LCN37 to the A316 cycle track and to LCN 33 up to Kew.
However, it is usually very congested, there are often large trucks; and there is no form of protection for cyclists on this stretch of road.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Doing the school run on bikes - with hiviz, helmets and cycling on the pavement. Queens Road, Richmond, northbound. Cyclists feel vulnerable due to high traffic volumes. There is a wide pavement and wide road here; with enough space to create a dedicated cyclepath.
Created by Andrew Woodward // 1 thread
This dad with kids in a trailer clearly doesn't feel safe enough to use the bike lane so he cycles on the pavement. Probably because he's on the way to one of the 7 schools or nurseries near to this route; and the cars are doing 40mph on that nice wide road. This is a regular sight on this route.
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew Woodward // 0 threads
The A316 is interrupted at Manor Circus; requiring a dismount to walk around the roundabout before you can continue again East-West.
Created by Andrew Woodward // 0 threads
Street signage causes unacceptably narrowing of the cyclepath at this point.
Created by Andrew Woodward // 1 thread
I have serious concerns about the safety of this portion of the bike path; arising from its recent re-design. Recently my 10 year old son was in a very close “near-miss” with a car turning off the A316 into Bicester Road; and I believe many more similar incidents are likely occurring. Eventually someone will be seriously hurt or killed on it.
However, the improvement in the track leads cyclists to feel more confident in using it – giving a false sense of security.
In particular:
• The segregated track makes it particularly appealing for inexperienced and more vulnerable cyclists (such as kids).
• This track design leads to an increase in the cyclists speed.
• The smooth/quick nature of the track leads inexperienced cyclists to believe that THEY HAVE RIGHT OF WAY across side roads.
• There are no markings on the roads to tell drivers coming in or out of side roads that cyclists could be on the track crossing their path.
• There is a particular challenge for EASTBOUND cyclists.
To avoid stopping at every side road, when on the track travelling Eastbound (as per red arrow on photo) approaching roads such as Bicester road, the cyclist has to simultaneously
(a) check to their FRONT/LEFT side to see if a car is exiting the side road
(b) check BEHIND them on their REAR/ RIGHT hand side to see if a car is about to swing off the A316 into the side road (usually at speed) - (as per orange arrow on photo).
This is a hard combination to perform – looking 180 degrees opposite directions at the same time. If you are an inexperienced cyclist, on an apparently safe track, it is very likely that you will not realise you have to be this vigilant and not check adequately for cars.
Hence, my boy rode across Bicester road from the east and was very nearly hit by a car turning off the A316.
(Note that travelling from the west is somewhat easier as both the vehicles turning in from the A316 and those turning out from the side roads are in your front field of vision).
My suggestions for improving this situation are:
(1) Clearly mark the bike track across the side roads so cars are aware there are cyclists approaching from the side.
(2) Ideally, give cyclists priority across the side roads; so making cars slow to a halt and making it more intuitive for cyclists.
(3) To facilitate this, would require some stopping space for traffic coming on/off the A316 to after the bike track crossing
At roads such as Bicester road the bike track could be curved to the south by about 2m before crossing the side road – this curve in the track would
(a) naturally slow cyclists down as they approach the side road
(b) would provide vehicles moving onto the A316 a decent gap so they can separate the concerns of first negotiating the bike track then focus on getting on the A316;
(c) for vehicles coming off the A316 the additional space would give them space to stop and give way to cyclists.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Andrew Woodward // 0 threads
There's plenty of shops on White Hart Lane but the only bike parking is right at the northern end. There is room for more bike stands near the shops at the southern end opposite Westfields Avenue.
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Martin Lucas-Smith // 1 thread
Anglia Ruskin are developing their new Faculty of Health, Social Care and Education here. They are required to undertake amendments to the junction here. Can this be improved for cycling?
Created by Sam Saunders // 1 thread
Busy Ashton Road (a 20 mph road from the A3029) bends eastward into the commercial area of North Street, close to a well-used park. On the bend, immediately adjacent to a park entrance, Frayne Street brings one-way traffic from the north west, and allows cycles to travel in the opposite direction towards Cumberland Basin. Coronation Road has two way traffic on the north east side.
A recently installed calming measure has narrowed the road on the bend, as shown in the picture. The irregular shape of the road that results has made the turn into Coronation Road awkward for cyclists and, as can be seen from the lower half of the picture, some cyclists take ad hoc routes to avoid the complication. Buses and large lorries also use the route into North Street and most vehicles take the bend at about 30 mph, despite the speed restriction.
As a route for cyclists, there could be a continuous segregated lane alongside the park (perhaps shaving a metre from the park itself, crossing Frayne Road with priority and following Coronation Road eastbound. A large number of school children use the route along the park every day but only a very few use a bicycle.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sam Saunders // 1 thread
Cycling North along Westbury Road (A4018) on a shared-use pathway beside the main carriageway there is a sign to "Westbury Park Shops". It is about 50 yards before the Parry's Lane roundabout and indicates a right turn ahead for cyclists and pedestrians. It has been added to a larger sign that reads "New Road Layout".
In practice, on arrival at the roundabout there is no indication before, on or after the roundabout as to where cyclists should go next. A zebra crossing before the roundabout offers a dismounted route to the other side of the road, but there is no indication of which direction to take thereafter. There are 4 roads to chose from, Westbury Park, Etloe Road, North View and Downs Park West but none of them seem to offer shops. There are two ambiguous cycle lane markings on the entrance to Westbury Park and "NO CYCLING" is painted on one footpath.
The problem, in a nutshell, is one that recurs all over Bristol: if you don't already know the way a first encouraging sign gives expectations that are not followed through. A route that had been indicated as a cycle route (with the cycle symbol) at its origin is left to chance and guesswork. The effect on cycling is to increase uncertainty and unpredictability. Each cyclist is obliged to make guesses about how to use a junction or follow a route. An association of cycling with expert and arcane knowledge is reinforced. Many routes (including this one) could be improved with a few additional signs or road markings and their use by casual or less well-informed cyclists could be encouraged.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Henry Lancashire // 1 thread
Info from survey:
"The London Borough of Brent and Sustrans are working together to explore ways in which the Kilburn High Road and surrounding area shown could be improved. Together we want to better meet the needs of the community to make it a more desireable place to walk, cycle and enjoy being in.
...
London Borough of Brent and London Borough of Camden will submit a joint application to Transport for London's Liveable Neighbourhood programme in November 2018, which will incorporate suggestions made by the community."
Brent Cyclists are forming our own response, to be sent by end of October 2018.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Created by Roxanne (CEO) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.