4 homes at 8 Montreal Road 12/0480/FUL
A further application following several rejections.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Rohan Wilson // 1 thread
A further application following several rejections.
Planning application to demolish 32-38 Station Road and build two office blocks. This is a revised application.
Application is called 'Fifty & Sixty Station Road'.
Documents are completely inadequate for this listed building. I submitted this objection:
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The application form indicates that there is currently no cycle parking and that none is intended. This is unacceptable - the development must conform to the Council's standards in quantity, location and type.
There are insufficient graphic details on which to assess the application.
RW for Sustrans 3 May 2012
Created by Rohan Wilson // 0 threads
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
We note that 3 Sheffield stands are shown within the cycle shelter - good provision for a site which is on the city's Signed Primary Cycle Network. It is important that they should not be installed too close to the rear wall, and that the spacing between each and between stands and side wall should meet the City Council's standards - see Cycle Parking Guide.
Only 3 bins are shown - is this acceptable, for recycling etc?
RW for Sustrans 3 May 2012
Objected.
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
We are concerned that there may not be sufficient space in the rear "bikes and bins" (unattractive combination!) room. It is important that the Sheffield stands indicated should be installed as shown, and to park or remove a bike, rearward space is essential (See the City Council Cycle Parking Guide), adequate as drawn. But only five refuse bins are shown, one for each apartment. Normally each would need 3 bins (black, blue, green), for which there would clearly be insufficient space.
RW for Sustrans 3 May 2012
Created by Rohan Wilson // 0 threads
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The documents state that cycle parking is to be increased to 4 spaces (staff) and 6 spaces (pupils), but gives no indication as to its type, location, or whether it is sheltered.
We consider the quantity to be provided seems unambitious, especially considering the site is in a quiet street close to routes on the city's signed primary cycle network. The cycle parking should be of Sheffield stands, convenient to the building's entrances, in a clearly visible location, and sheltered. See the City Council's Cycle Parking Guide for information.
We recommend that more spaces should also be provided, better to encourage a healthy alternative to car use. We note that the site is a listed building whose character and surroundings are not likely to be enhanced by full occupation of the "ample" car parking mentioned in the D+A Statement.
RW for Sustrans 3 May 2012
Created by Kevin Hickman // 0 threads
Poor provision for cycling in the submitted plans.
Created by David Earl // 1 thread
BBC R Cambs want to interview someone at 07.05 tomorrow (May 1) about the potholed condition of Mill Road.
Created by cobweb // 1 thread
Plans are mooted to paint directional signs on the roads in the city centre to alert bike users to the legal direction of travel.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Martin Lucas-Smith // 3 threads
Cambridge United are proposing a new stadium in Trumpington, near the Park and Ride site. Clearly this will have major traffic generation effects.
Created by David Earl // 1 thread
Construction of 136 residential units (class C3) with associated car parking and landscaping.
Martin Lucas-Smith // 2 threads
Mill Road suffers from a dreadful lack of cycle parking.
Coming from Oxford Street, trying to get to the coach stops is quite difficult.
Created by Jim Chisholm // 2 threads
For several years there have been proposals, counter proposals, and problems over access over partly Trinity College land that should give good cycle commuting routes from Bar Hill, Dry Drayton, Madingley and even Hardwick.
We need to work with NW Cambridge team at the University, Trinity College, Bidwells (Trinity's land agents), County, SCambs, and Local Parish Councils
If a solution can be found S106 monyey is available
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Martin Lucas-Smith // 1 thread
The speed limit here is currently 40mph.
Martin Lucas-Smith // 1 thread
The North West Cambridge site proposes traffic calming changes in Oxford Road and Windsor Road.
Proposals at:
http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=LRVINSDX01D00
then click on this second link:
http://idox.cambridge.gov.uk/online-applications/files/31B8D2EEB48A4F65255321E5DF860E38/pdf/11_1114_OUT-TRANSPORT_ASSESSMENT-857517.pdf
and scroll to numbered PDF page 26.
Created by Gregory Williams // 1 thread
A new Sainsburys supermarket is proposed at Westgate-on-Sea. The cycle infrastructure in this location is poor and this is an opportunity to help improve it.
Created by Shaun McDonald // 0 threads
Part of the TfL junction review http://tfl.gov.uk/junctionreview
11/0008/FUL was recently rejected by the Planning Committee but the club only have the lease till the end of the 2013 season having sold it to developers. It's likely some kind of development will occur on this site since the club needs the money.
The Old Press/Mill Lane supplementary development plan was adopted in 2010. Things have been quiet since then but the University still have plans to refresh this area. Part of the plan involves making Granta Place shared use.
Martin Lucas-Smith // 12 threads
Various related matters regarding the new CB1 development, e.g. new housing blocks and their cycle parking, routes through the development.
For issues relating to cycle parking at the station itself, see:
http://www.cyclescape.org/issues/36-cycle-parking-at-the-station
instead
Created by cobweb // 1 thread
Coming up in the Planning Committee meeting for April 4th, 9.30am.
Created by cobweb // 3 threads
Outline planning permission was given in 2008 for this development of up to 347 houses. In 2011 a reserved matter relating to the design on the junction was refused by the Joint Development Control forum. This is still a subject of debate. Another concern is the path adjacent to Babraham Road which is much used by staff at Addenbrooke's either on foot on by bike.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by David Butler // 1 thread
Consultation of cycle lanes and junction changes by Manchester City Council
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Marcus Howarth // 1 thread
see https://consultations.tfl.gov.uk/trams/sutton-link/?cid=sutton-link
Here's the overview from TFL:
Overview
We are consulting on proposals for a new, direct and quicker transport link between Sutton and Merton. We have called this the Sutton Link.
The Sutton Link would create a high-capacity route for people travelling between Sutton town centre and Merton using zero-emission vehicles. It would connect with other major transport services into central London and across south London, including National Rail, London Underground, existing tram and bus services. It would make journeys by public transport quicker and more attractive, and reduce the need for trips by private car.
Many of the neighbourhoods along the proposed routes have limited public transport options. The Sutton Link would support new homes being built and would improve access to jobs, services, major transport hubs and leisure opportunities across both boroughs and beyond.
Our work is at a stage where we would like to know your views about three potential routes. We are considering a tram or ‘bus rapid transit’ (BRT) for the Sutton Link and would also like to know your views on this.
BRT is similar to a tram but runs on road segregated from traffic where possible, not on rails, and carries fewer people in each vehicle. A full explanation is included below in the section titled ‘About trams and bus rapid transit’.
From LCC -
general principles would be ensure this doesn’t negatively impact cycle routes, that there are good routes to the stations/stops, that any places where cyclists will be crossing tracks are designed carefully with latest materials to avoid tramlining incidents, that the space comes from private car lanes.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Sam Saunders // 0 threads
A twenty metre stretch of advisory cycle lane at the end of Whiteladies Road, from a zebra crossing to its junction with Queens Road, encourages cyclists to take a position near to the curb as they enter the and leave the junction. This puts them exposed to frequent buses turning immediately left into Queens Avenue and in a vulnerable position from which to continue a journey south west towards Park Street or Park Row.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Jean Dollimore // 1 thread
Fleet Road is a one-way street with heavy motor traffic and no protected cycle infrastructure. This means that people cycling through the area face unpleasant interactions with motor vehicles as well as needing to make diversions to reach destinations in the area,