PA_212657_25Creffield
Retrospecitve application for garden fence and cycle/bin store
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Steven Moseley // 1 thread
Retrospecitve application for garden fence and cycle/bin store
Created by Steven Moseley // 1 thread
Part change of use from retail to domestic, with proposed gates and post and rail fence to front of car park. Erection of car barn to rearof site.
Created by Jean Dollimore // 1 thread
In June 2020, a No Entry (with cycle exception) was placed on Millfield Lane just south of the junction of Merton Lane, making the southern section one way northbound for motor vehicles. In addition, several parking spaces were removed at the bend to provide more space for walking. This was done with an experimental traffic order and Camden is now consulting on making the changes permanent and building a proper footway at the widened section.
Extras
Camden also proposes:
They also ask whether we would like to have Merton Lane one-way for motor vehicles (eastbound only)
Created by Steven Moseley // 1 thread
Outline Planning Application (with all matters reserved except access) for the erection of up to 600 dwellings, land for a co-located2FE primary school and early years nursery, public open space and associate infrastructure. Vehicular access from Londo
Created by Steven Moseley // 1 thread
Residential development (approximately 1500 dwellings including conversion of some retained hospital buildings) mixed uses, including community facilities, employment and retail, public open space, landscaping, new highways, transport improvements, reserved route of the Northern Approach Road Phase 3 (NAR3), and associated development.
Created by Steven Moseley // 1 thread
Mixed use development comprising nursery at ground floor level and residential units at first floor with associated parking and landscaping as a part of Neighbourhood Centre NC2
Created by Steven Moseley // 1 thread
Construction of 6 new residential homes with associated landscaping and parking
Created by Steven Moseley // 1 thread
Conversion of existing roof space of Block A2 to create 1no. 1bed flat with 25sqm private terrace, together with allocation of 1no. car parking spaces (AMENDED DESCRIPTION)
Created by Steven Moseley // 1 thread
Listed building: Proposed Change of Use from accommodation ancillary to the existing Gaming Centre (Sui Generis) to C3 (residential dwelling) on existing 2nd floor. Listed Building Consent for minor alterations to facilitate the change of use.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from B1(a) (offices) to Class C3 (11no flats) with changes to external elevations including new balcony structure and dormer windows
620-622 Chartwell House Newmarket Road Cambridge CB5 8LP
Cambridge
Application reference : 21/04350/FUL
Created by Anna Williams – Head of Campaigns & Engagement // 3 threads
Camcycle would like to support communities across the county as part of our strategy to influence decision-making at a regional level and our campaign for Zero Carbon Streets in Cambridgeshire which aims to empower local groups to work for better walking and cycling in their areas. Fenland has historically been badly served in terms of active travel investment and is an important district in which to support improvements.
sound+fury // 1 thread
Change of use of a vacant office (Class E, previously Class B1) to Hostel (Sui generis) and use of the roof space as external amenity space.
49 Sidney Street (First And Second Floor) Cambridge Cambridgeshire CB2 3JF
Cambridge
Application reference : 21/04260/FUL
Created by catch // 0 threads
Suggestions to reduce traffic (via restricting southbound traffic) and potentially add cycling infrastructure on Brook street.
See google document.
Created by User 3428 (deleted) // 1 thread
Sunday 26th of September 10.15pm I was cycling from Cambridge North to Histon. I collided with a fence immediately after exiting the A14 tunnel and sustained a dislocated shoulder along with other injuries.
There is definitely a hazard here because
1) the busway and tunnel from Cambridge North are brightly lit. The busway after the tunnel towards Histon is unlit.
2) about 30m after the tunnel the width of the busway tarmac surface suddenly reduces due to the introduction of the gravel strip (approx 1m wide). There is also a fence near the start of the gravel strip (I assume for the small animal tunnel)..
I cycled through the tunnel and noticed a cyclist coming in the opposite direction (without lights), so I took avoiding action by moving to the left. I may have then glanced at my mobile phone on my handlebars. When I looked up I saw the fence in my headlight. I then hit or clipped the fence.
Created by Steven Moseley // 1 thread
Change of Use from Class D1 (New Ee) Health Clinic previously trading as The Physiotherapy Practice to Class C3(a) Dwelling House.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Replacement of an existing building with a development of 3 no. self-contained flats
21 Sandy Lane Cambridge Cambridgeshire CB4 1HZ
Cambridge
Application reference : 21/04212/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 3 dwellings along with off street parking, private amenity space, cycle parking/ storage and refuse storage, demolition of existing rear garage lean-to and reconfiguration of the pavement along Stanesfield Road
Land Adjacent To 25 Rawlyn Road Cambridge Cambridgeshire CB5 8NL
Cambridge
Application reference : 21/04190/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion and extension to provide seven flats
3-4 Market Hill Cambridge CB2 3NJ
Cambridge
Application reference : 21/04188/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Part demolition of outbuildings, erection of single storey annexe and change of use to 6 bed HMO (Sui Generis) for 6 persons
7 Kent Way Cambridge CB4 2QY
Cambridge
Application reference : 21/03983/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 2 no. 2 bed flats with associated bin and cycle stores
Land Adjacent King Hedges Road Cambridge Cambridgeshire
Cambridge
Application reference : 21/03991/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use to 11bed HMO for 11 persons (sui generis).
157 Shelford Road Cambridge CB2 9ND
Cambridge
Application reference : 21/03899/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03821/FUL | Extensions and alterations to pair of semi-detached dwellings to create 6x new apartments and 1x detached one bedroom unit. Improvements to front boundary wall and front garden area, including off road parking for 2 vehicles retained and bins and cycle store provided.
87 Perne Road Cambridge CB1 3SB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 6no. dwellings together with access, car parking, bin and bikes stores, landscaping and associated infrastructure
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 7 apartments comprising 1 x 2-bed and 6 x 1-bed units, including bin and cycle storage facilities, together with reconfiguring the pedestrian access to 56A and 58A Cherry Hinton Road and installation of a new ground floor rear wall to the retained retail unit at 56-58 Cherry Hinton Road, following demolition of existing warehouse building
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Starting a thread about this application here so we can continue on from the previous planning list discussion.