Potters Bar to South Mimms research institutes
A possible route from Potters Bar via Dame Alice Owen School, NCN12 at South Mimms, Cancer Research at South Mimms and then on via Blanche Lane to join the existing cycle path alongside the A1.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Adam Edwards // 1 thread
A possible route from Potters Bar via Dame Alice Owen School, NCN12 at South Mimms, Cancer Research at South Mimms and then on via Blanche Lane to join the existing cycle path alongside the A1.
Created by Adam Edwards // 1 thread
Porposed but never built links between the Royal Veterinary College and Potters Bar and Brookmans Park stations. The route parallel to the railway exists as a footpath which would need upgrading to a bridleway with good surface and ideally lit to allow all year use. (Vets work well beyond 9-5)
The Alban Way is unlit and isolated from main roads. Thus it does not provide a safe commuter route in the winter months.
WelHatCycling believes there should be an all year route alongside the A1057 along the route shown, linking Hatfield to the St Albans Green Ring at Fleetville and then continuing in to the city centre.
This will be a challanging route where streets are narrow and car use is high. The priority therefore might be University of Hertfordshire - Oaklands College - Fleetville to encourage cycling to these two key educational institutions.
Created by Adam Edwards // 1 thread
WelwHatCycling believes there should be shared use pavements along Digswell Road to link the north of the town to the town centre. This would connect to our proposed North - South and East- West routes described in other entries.
Created by Adam Edwards // 1 thread
The cycle route from WGC to Hertford is an unlit isolated former railway. Whilst an excellet ride on a sunny Sunday, it is of little use in the dark winter months for cycle commuting.
The route shown would comprise:
A new shared use pavement along Cole Green Lane / Birchall Lane from the end of the current cycle path to the A414.
A light controlled crossing of the A414 or bridge.
Signed us of the Old Coach Road to the outskirts of Hertford.
Shared use pavement plus signed routes into the centre of the town.
Created by Adam Edwards // 1 thread
The east side of WGC is currently served only by the NCN61 route. In 2014 work was done on Heronswood road to add safety markings due to high incidences of accidents involving bikes. There are local concerns about cyclists using pavements to avoid busy local roads.
There should as a minimum be a route from WGC station to the new QE2 hospital, ideally directly via Woodhall shops. The other routes show other useful possible links to create a cohesive network to serve this section of town.
Created by Adam Edwards // 1 thread
A long standing missing link in WHBC area cycle routes. The current Bessemer Way cycle path ends where the road becomes a busy dual carriage way. There is no off road cycling link to Welwyn village which prevents the children of the town cycling to Monks Walk School (yet it is possible for Hatfield children to get there virtually the whole way on cycle path!)
Created by Adam Edwards // 1 thread
This route would use a combination of 20 mph road (Fretherne Road, Stonehills) plus upgraded crossings to create a north south route through the centre of Welwyn Garden City. It would share a common section around the Welwyn Hatfield Borough Council Offices and the Campus with the east west route described in another section.
The route would link NCN57 south of the town with the existing link from Campus East to Shirepark, thus enabling commuters from this business park to access the station. Going further north the link over the White Bridge would then open up the quiet residential streets of north WGC for cycling to and from the town centre. Via the east west route their would be a better connection to NCN12 avoiding the busy Parkway.
Created by Adam Edwards // 1 thread
Welwyn Garden City has no off road town centre cycle routes. This east west route would link the network of cycle paths to the east of the town centre to NCN12 to the west and enable cyclists to avoid The Campus, a deceptively green gyratory which is difficult for cyclists to navigate.
It would connect with a north south route at the Welwyn Hatfield Borough Council offices, encouraging staff to cycle to work. It would encourage commuters to cycle from west WGC to the station and to work places off Broadwater Road and at the Mundells.
Created by Adam Edwards // 1 thread
The Sustrans map erroneously shows part of this route as an on road cycle path. No such path exists.
The Common is one way south west bound. In order to spare cyclist having to use the on road cycle lane on Queensway which is badly engineered, especially at the Woods Ave roundabout, WelHatCycling believe there should be a contraflow cycle lane or shared use pavement along this route, extending accross Lemsford Road and connecting with the existing cycle path on St Albans Road West. This would create a route through the town centre to connect north and south Hatfield.
The photo shows the north end of the Common as currently arranged for cycling.
Created by Adam Edwards // 1 thread
Just two (2!) metres of tarmac would legally connect Dellfield Road to the Woods Ave cycle path. With no other work than this it would allow cyclists heading west to avoid the nasty on road cycle path along Queensway parallel to this route.
Ideally works would also be done to allow cyclists heading east to use this route and then continue along the planned Queensway cycle path (see other entry) to avoid Queensway entirely.
Created by Adam Edwards // 1 thread
Hertfordshire County Council announced plans in 2014 to improve the walking route from Hatfield town centre to the railway station. We lobbied successfully for the section from the Market Place toucan to the French Horn Lane pelican crossing to be reubuilt as dual use, completing a vital link from the station to the University.
This would be even better if officially extended round the skateboard park and accross Link Drive to join up with the Woods Ave off road cycle path, thus enabling cyclists to avoid the dangerous roundabout at the junction of Woods Ave and Queensway. This is shown in the map to the west (left) end of the route shown.
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by Roxanne (CEO) // 3 threads
Thread for County Council Economy and Environment Committee meetings
http://www2.cambridgeshire.gov.uk/CommitteeMinutes/Committees/Committee.aspx?committeeID=74
Created by Chris Peck // 1 thread
Woodside Park is a commercial area which the developers wish to turn into an 87 dwelling residential area, comprised of 61 flats and 26 houses, with up to 235 residents. An additional office space area could also be turned into a further 20 2-bed flats, resulting in a total of 107 dwellings.
The developers' transport assessment suggest this:
"Whilst there are no formal facilities for cyclists, the local roads are suitable for use
by cyclists, and Catteshall Lane is identified as a recommended cycle route by SCC
and Sustrans. This cycle route links with Godalming town centre and Godalming
railway station, which is approximately five minutes from the site by bicycle."
This is patently not true, as the route to Godalming station via the town centre is one-way!
Car parking
135 car parking spaces are planned, however, the assessment suggests that, comparing equivalent car ownership in the local area, only 86 spaces are actually required (because there are only 0.8 cars per flat in central Godalming, and 1.42 cars per house).
While it is accepted that a few extra spaces are required for visitors, is 56% extra parking really needed?
Cycle parking
No numbers are provided, but houses are expected to accommodate cycles in sheds or garages, while there will be covered cycle storage for the flats.
More detail is required on how secure this storage will be.
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
Created by Chris Peck // 1 thread
With the welcome completion of the cycle path linking Marshall Road to Bridge Road, the weaknesses of links on either side of the route become more apparent.
Bridge Road is a busy, narrow main road. Traffic mostly has to wait behind cyclists, creating uncomfortable conditions for all but the brave. Both roundabouts (at the Chalk Road/Meadrow and the Bridge Street/Wharf Street junctions) are difficult for cyclists (and pedestrians).
An alternative route, either running parallel to the road (a widened shared use footway?) or a raised boardwalk across the Lammas Lands, are alternatives, but both are expensive, challenging options, which require new or wider bridges over Hell Ditch and the River Wey.
Created by Bracken VanRyssen // 1 thread
The path between Smith's Wood and Water Orton could be a key cycling and walking link and a way to avoid the only other crossing of the A452 and M6, which is the busy and fast Water Orton Road. However the route is blocked off with concrete blocks and is in an extremely poor state of repair with overgrown bushes and an exceedingly unpleasant subway.
Martin Lucas-Smith // 3 threads
The City Council has been working on a City Centre Access Strategy to deal with the problem of obstructions, including inconsiderately-parked bikes. This is to be considered formally by a City Council Committee.
Created by Jon_B // 0 threads
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
Created by Iain Lane // 2 threads
Dear Consultee,
Nottingham City Council (Radford Road Area, Nottingham) (Prohibitions of Waiting and Parking Places (Specified Classes of Vehicles)) Traffic Regulation Order 2015 (TMP 7115)
Please find attached a consultation letter and associated drawings, SN/TMP7115/01/A, SN/TMP7115/01/B and SN/TMP7115/01/C which relates to the above Radford Road Area, Nottingham – Traffic Regulation Order (TMP 7115).
Created by Dawes Jaguar // 0 threads
The pointless pedestrian gate here is really awkward for pedestrians and cyclists alike, as it's hung on the wrong post and the area of bitmac that has been laid for it is ludicrously small. This area normally ends up a muddy mess in the winter. People simply don't move in sub one metre angular movements, shunting back and forth to avoid the grass. Note the track in the grass that shows what one cyclist did shortly before the Google car got there.
Remove all three gates and replace them with a removable bollard.
Created by Dawes Jaguar // 0 threads
There are regular collisions at this junction because motorists speed on Bournville Lane and the site-lines are very, very poor. The simple solution is to change the priority. This would solve the problem for motorists, and make it easier for cyclists to use Hay Green Lane as part of a cycle route.
I have suggested the change of priority to BCC but was given a list of excuses why this cannot possibly be done. One of these was that Bournville Lane is a blue route. I see no benefit in an emergency journey ending here because someone pulling out of Hay Green Lane couldn't see the approaching police car.
Created by Dawes Jaguar // 0 threads
Cotteridge town centre has been allowed to degenerate into a hostile place for cyclists and pedestrians. Motorists have multiple lanes for driving and parking, whilst pedestrians are blocked from crossing the road by steel railings. Cyclists are given nothing. Watford Road and Rowheath Road are both OK for cycling, but their junction with Watford Road is horrendous. Midland Road has no contra-flow, so it is obstructive to cyclists trying to avoid the multi-lane horror of the Pershore Road. The two lane double-roundabout is difficult to negotiate even in a car.
This whole area needs to be redesigned, putting cyclists and pedestrians first. I'm sure I'm not the only person who doesn't shop in Cotteridge because the environment is /vile/.
Created by Dawes Jaguar // 0 threads
Birdcage Walk is fitted with Cycling Prohibited signs and barriers, yet it is as wide as some roads. Talking to a PCSO on a bike I saw cycling there, he told me Cadbury's were happy for people to cycle on Birdcage Walk if they did so responsibly. So how about replacing the signs with "Share with Care" signs, and the barriers with bollards spaced wide enough to allow cyclists through but not motor vehicles?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?