6 new dwellings, High street Cherry Hinton | 22/01638/FUL
Erection of 6no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling. | 72 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Josh Grantham // 1 thread
Erection of 6no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling. | 72 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ
Created by Josh Grantham // 1 thread
Change of use from Guest House to large 12bed House in Multiple Occupation (Sui Generis Use Class)
Created by Josh Grantham // 1 thread
Erection of office building and associated infrastructure and works following demolition of existing buildings and structures
Created by Josh Grantham // 1 thread
22/01995/FUL | Demolition of existing buildings and hardstanding and erection of 70 new homes, car parking, landscaping, bin and bike stores, substation and associated works.
cycle parking provision grouped to 3 areas quite close to the doors. Cycle parking provision needs checking.
Also the site provides several cut throughs, they should be improved and enhanced. Probably worth a deeper look.
Created by Josh Grantham // 1 thread
Application for new property. The design and access state claims compliance with Policy 82 parking standards but no cycle parking has been indicated on the plans.
Created by Josh Grantham // 0 threads
Creation of new property in which the Design and Access statement claims compliance with policy 82. However no cycle parking in indicated on the plan.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Strategy and Resources Committee consists of six councillors who scrutinise the decisions of the Leader/Executive Councillor for Strategy and External Partnerships and the Executive Councillor Finance and Resources.
More Information
Created by Rosamund Humphrey (Admin Officer) // 1 thread
All 42 members of the city council meet formally at least five times a year. Their main responsibilities are setting the budget and policy framework for decision making.
More Information
Created by Matthew // 1 thread
Scout Hut Path is an important link between the Carter Bridge and the Corrie Road neighbourhood. It is narrow and marred by a sharp blind bend in the middle, making it difficult to use for many people especially at night due to personal security and collision concerns.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A developer called Kadans Science Partner is proposing to redevelop the Merlin Place site (currently home to the Taylor Vinters building) as part of the North East Cambridge scheme.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by S Fan // 1 thread
Dropped kerb required due to high pavement
sound+fury // 1 thread
There have been issues with the cycle parking in the past so this need examining again.
Created by Tim Ward // 1 thread
I'm new here, so this has probably been done before, but I haven't sussed out how to find any relevant previous discussion using the search. So sorry if this is repetition.
There are lots of farm roads around Cambridge, some of which have locked gates and "bicycles by written permission only" notices, others are signed as permissive routes, others have no signs but in practice nobody actually shouts at you as you cycle through what turns out to be a farmyard.
Are there any resources that enable us to work out in advance, before discovering the sign and the locked gate, which of these roads are passable by bike, with possibly a rather long route home if the answer is "no"?
Just as an example, how about Battle Gate Road?
Created by Al Storer // 1 thread
A series of temporary obstructions are planned for the Haling Way path
Created by piers // 1 thread
Cars regularly cut across cyclists in the southbound bus/cycle lane.
Created by Matthew // 1 thread
From the county:
In addition to the notification which I sent to you on Monday 11 April 2022 regarding the order to divert part of Longstanton Bridleway 10, I am emailing you to consult you on a proposal to re-surface the northern part of Longstanton Bridleway 10 between the new bridge across the access road to Northstowe and the southern end of the Wilsons Road by Falcon Park.
The proposal to re-surface the northern part of Longstanton Bridleway 10 is related to Condition 59 of Northstowe Phase 2 (S/2011/14/OL) which is subject to submission of details to Greater Cambridge Shared Planning consultation S/2011/14/COND59. In order to achieve a continuous all-weather NMU link between Longstanton, Bar Hill and the new A14 NMU path I am consulting you on what type of surfacing you would like to see on the route (coloured in pink on the attached plan). The route will need to provide an upgraded route that caters for all non-motorised users (walkers, cyclists and horse-riders) all year round.
The southern section of Longstanton Bridleway 10 between the A1307 and the new NMU bridge over the Northstowe access road was surfaced last year and I am interested in whether a similar type of surface would be suitable on the northern section of the bridleway. The northern section of Longstanton Bridleway 10 is generally quite wide and located between tree/hedge lines. I am proposing that any re-surfacing on the northern part of the bridleway follows the principle of providing a 50-50 parallel surface (50% retaining grass/natural surface next to 50% smooth surface suitable for cyclists and pedestrians such as the surface which is in place on the southern part of Longstanton Bridleway 10 or the surface which has just been completed on Reynolds Drove, Rampton north of the busway). Between the boundary features on the northern part of Longstanton Bridleway 10 there is generally at least 5 metres of width available which in theory could accommodate 2.5 metres of natural surface next to 2.5 metres of foot/cycling surface.
The re-surfacing of the bridleway associated with the planning condition is for the developer (Homes England) to deliver, but I am seeking your opinions on what you would like to see in this location which I will then use to inform my feedback to Homes England and Greater Cambridge Planning on the condition which needs to deliver improvements to the northern part of Longstanton Bridleway 10.
I would be much obliged if I could have your comments back on this matter by Friday 29 April 2022.
Created by Stuart Johnson // 1 thread
Military Road, 48 apartments - general comment submitted
Created by Sarah Hughes // 1 thread
I'm writing an article for the next Camcycle magazine on family cycling options with pedalling kids (so FollowMe, Tagalong and tandems/triplets). Could anyone share their experiences of using these?
Created by Matthew // 1 thread
Date: 10th May
Time: 5 – 6.30pm
Location: Online, please sign up using this link: https://us06web.zoom.us/meeting/register/tZEpc-ygqzwvE9IF05xdvRUk6xmfOcoReuA5
The Food, Farming and Countryside commission is 'touring' the countryside to gather views about land in Cambs and Peterborough:
Listening Tour: Your Views on Land in Cambridgeshire and Peterborough
We ask a lot of land. We need it to grow food, restore biodiversity and nature, decarbonise the
economy and adapt to climate change – while also providing space for new homes, access to nature
for leisure and wellbeing and the infrastructure for business, energy and transport. In England, there
is currently no coordinated way of balancing all of these pressures.
Planners are often faced with agreeing the ‘least-worst’ development proposals. Local people have
little say when their valued open countryside, green spaces, or even allotments are lost to other
uses. We want to test ideas for a more strategic and effective approach that will support action to
deliver net zero, nature recovery, clean air and water, economic development, and food production.
A land use framework will also help individual landowners and farmers make long term plans as they
face a raft of new support mechanisms; to help assess what their land is best used for in the context
of the wider landscape.
We want to hear from people about the places where they live and work and what they value most
there. We want to hear people’s hopes, fears and aspirations for their local environment and what
they would like to improve. We’re interested in towns, villages, farms, landscapes and wildlife, food,
roads, rivers, transport, heritage and employment. What changes are coming and how can they best
be addressed? How can local people be involved in defining what Cambridgeshire is like in 20 years’
time?
We hope the meeting will be interesting and lively, and that you share your views. We will include a
short introduction to the topic about how places have been changing over time and the competing
pressures on land to open up the discussion.
These meetings will form part of a wider “tour” gathering views right across Cambridgeshire. They
will all contribute to a Land Use Framework being developed by people and organisations right across
Cambridgeshire. For more information: https://ffcc.co.uk/land-use-framework
Created by Heather Coleman // 1 thread
There are 1970s-style barriers separating Charles Street and Rustat Road. This means that the large numbers of cyclists heading in both directions often have to give way to each other. These barriers need replacing by a removable bollard in the centre of the route, so cyclists can easily pass on the correct side as they would any other traffic island but cars can't get through. This is a literal barrier to easy safe convenient cycling and has no place in 21st Century Cambridge. Especially when there is an easy solution around it.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Combined Authority Board is chaired by the elected Mayor of Cambridgeshire and Peterborough. The purpose of the Board is to ensure that the decisions and actions of the Combined Authority deliver key outcomes for the people of Cambridgeshire and Peterborough.
Created by Stephen Lawrence // 1 thread
Two large Red barriers have been placed to deliberately close the pedestrian crossing, both sides of road.
There seems no reason to block off this vital route. No alternative is provided (no kerb drop etc)
Created by cpax // 2 threads
The cycleway is blocked by building work with a footway separated from the road which is too narrow to cycle and with no ramps to
leave or join the road .
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Elizabeth E. // 1 thread
TfL are making changes to junction because of safety issues.
For Cyclists:
Two-stage right turns at the junction in the west to south and east to north directions
An early release at the traffic lights on all four arms of the junction
Deeper Advanced Stop Lines (ASLs)
Mandatory cycle lane on Camberwell Church Street westbound approach to operate at all times
St Giles bus stop moved further west from the Vicarage Grove junction to improve safety of left turning cyclists on the LCN 23 cycle route
Resurfacing throughout the junction.
Retention of the 20mph speed limit at the junction and on all the approaches.
Created by Andrea // 1 thread
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
Created by Jean Dollimore // 1 thread
Camden is consulting on improving safety for pedestrians in the vicinity of Hampstead School in Westbere Road.
See StreetView from Lichfield Road (Barnet) towards Westbere Road Camden showing Hampstead School on the left and the 20 mph sign
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Kate Ravilious // 2 threads
The Fishergate Gyratory is a complete nightmare for all cyclists and very dangerous. Crossing the lanes of the busy dual carriage-way is dangerous and drivers show little awareness or patience with cyclists. The entire junction needs rethinking.
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Created by North Devon Cycling Forum // 0 threads
Change of Road lay out on Long Bridge; NO new centre road line when road is due resurfacing and long term research into "shared space" alternative road surface
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by jpennycook // 1 thread
Erection of Class A1 and Class A3/A5 units. Provision of highway works and alterations to access; parking; landscaping; service infrastructure; and associated works and improvements.
St Michaels Retail Park The Harrow Way Basingstoke Hampshire
Basingstoke
Application reference : 16/04208/FUL
NCN45 across Peckforton Hill at risk of being closed
Created by Simon B // 1 thread
Adjacent to existing apartments on Sealand Road near the Cop is a new development currently under construction by Watkins Homes Ltd. Curently there is a barriered-off ramped access to Sealand Road to cross the Canal entrance to the river that leads around the exisiting apartments. This was originally envisaged as part of a continuous shared use riverside route.
The development of the site offers the opportunity to ensure that shared use access can be maintained, developed and improved along the riverside route that skirts the perimiter of the Racecourse and continues to the River Dee path that leads to Garden City and Queensferry. This could be before residents purchase properties who could well be resistant to a pathway near their new homes.
Whilst the access to the River Dee from the Shropshire Union Canal presents a barrier to a straightforward continuation of the riverside route to join the River Dee shared use path into Wales, the creation of a small extension around the permiter of the new development under construction would mean that an attractive continuous offroad route could be created with minimal additional works (widening of the existing footway for approximately 100mtrs).
It would be helpful to gather thoughts and ideas before the developers and Planning and Highways Department of the Local Authority are approached about this opportunity
Created by Roxanne (CEO) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Simon Nuttall // 3 threads
London Cycling Campaign's Space for Cycling campaign
Has a clear message - what can we learn from them?