Lack of cycle link between Buckland Valley and Dover Christ Church Academy
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 3 threads
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
Created by Gregory Williams // 1 thread
There is a comparatively new shared path linking Burgess Road to Alyesham's station. However the Burgess Road end of the shared path doesn't have a dropped kerb to allow a transition between road and path and vice-versa.
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
Created by Gregory Williams // 1 thread
The sign towards the Town Centre is missing. Previous view of the sign here:
Created by Gregory Williams // 1 thread
The sign pointing into Alfred Road at Lorne Road is missing.
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (CEO) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
Street Light FCND004 on Falala Way (NCN1) - Not Working Fault Number: 750068
Created by Owaldron // 1 thread
See Picture, Reported to CCC. However, I have a hunch that it may be the responsibility of 'LandMarc' on behalf of the MOD as I think they would own that land.
Created by Gregory Williams // 1 thread
A better cycle connection is needed to Rough Common, avoiding the need to use the A290 Whitstable Road or A2050 and Palmars Cross Hill.
20mph sign has twisted round and a sign directing to the station is pointing slightly in the wrong direction
Created by Gregory Williams // 1 thread
The cycle route on AE18 between AE429 and East Stour Farm has become overgrown and difficult to cycle through.
Created by Gregory Williams // 1 thread
Chilham station is signposted from National Cycle Route 18 via Pickelden Lane. However, the link towards NCR18 isn't signed from Chilham station and the portion along the A28 corridor isn't signed as a cycle route. The A28 is too busy for normal cycling. The path on the south side between Pickelden Lane and Chilham station should be made into shared use.
The incident has been reported to Kent Police as criminal damage, Crime Ref: 46/139801/23.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a space for discussion around Cambridgeshire County Council's proposal (published on 27th September 2023).
Created by Gregory Williams // 1 thread
The cycle parking at Morrisons needs improvement. It is situated at the far end of trolley park with only some surveillance, rather than adjacent to the entrance where it would receive better surveillance. The capacity is limited by the fact that only one side of the railings can be used.
Created by Gregory Williams // 1 thread
The cycle / pedestrian route signs at the junction between the Crab & Winkle Way and Oyster Bay Trail at Stream Walk / Albert Street / Action Road have gone missing.
Created by Gregory Williams // 1 thread
2 cycle storage units.
Dragonfly House Mayfly Close Canterbury Kent CT1 1HS
Canterbury
Application reference : CA/23/01343
Created by Josh Grantham // 1 thread
Erection of 14no residential dwellings and associated works including demolition of existing dwelling.
16 The Lanes Over Cambridgeshire CB24 5NQ
South Cambridgeshire
Application reference : 23/03395/FUL
Created by Gregory Williams // 3 threads
A safe cycle route is needed to link Wingham with Canterbury. The current A257 road environment is not attractive for cycling, due to high motor traffic volumes and speeds.
Created by Gregory Williams // 1 thread
The cycle parking provision at Whitefriars is minimal and at the periphery. Well surveilled provision is needed close to the shops that it will serve.
Created by Gregory Williams // 1 thread
The streetscape has recently been repaved in St. George's Street, but it lacks cycle parking.
Created by Gregory Williams // 0 threads
The cycle parking outside Faversham Pools doesn't support bicycles properly and is poor because it doesn't encourage the frame of the bicycle to be locked.
Created by Heather Coleman // 1 thread
Starter; instructions for who to report overhanging or overgrown vegetation which is obstructing a cycle or footpath. Place for people to discuss specific examples as they seem to currently be spread out all over Cyclescape so hard to find.
Created by Gregory Williams // 1 thread
The section of the Crab & Winkle Way / NCR1 linking Westgate Court Avenue to Duke's Meadow is narrow, has sharp corners, and has poor visibility. This means that it can be difficult for cyclists and pedestrians to pass and see one another.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Matthew // 2 threads
On 1 January 2026, historic routes in England that aren’t properly recorded will be lost to the public forever. We are looking for people to volunteer their time to help us identify and register these routes before it is too late.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Stephan Matthiesen // 1 thread
The chicane at the west end of the Magdalene Glen path interrupts the flow when going uphills, particularly unpleasant for people with weak knees. It also forces cyclists uphills often to stop and start when there are other people going through, as it's not wide enough to pass.
It doesn't serve any useful purpose at it is on the top of the slope where cyclists are very slow anyway. As it's uphills, there is little danger that e.g. kids run out onto the wide pavement of Duddingston Pk South. Cyclists from the West are slow at this point anyway as they turn into the path.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.