Sign this route
This route should be signed. It's a very nice quiet bicycle-walking connection between Liberton and Gilmerton, but very difficult to find, especially the footpaths between all the curved bits of Malbet Park/Wynd.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Stephan Matthiesen // 0 threads
This route should be signed. It's a very nice quiet bicycle-walking connection between Liberton and Gilmerton, but very difficult to find, especially the footpaths between all the curved bits of Malbet Park/Wynd.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by Stephan Matthiesen // 0 threads
Drum Street is very narrow in Gilmerton, many shops and pedestrians. Should really be included in 20mph.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by Stephan Matthiesen // 1 thread
Cars and buses southbound often cut the corner at the traffic lights (road bends to left), driving over the cycle lane.
The cycle lane leads up to the lights but ends there and restarts some distance along the road.
It is dangerous because drivers think that cyclists are out of the way in their own lane, even larger vehicles overtake here without realising that they easily move into the bike lane. Attached a photo where that happened to me, on 21 October 2014, the bus overtook and cut me off, I had to slam the brakes in order not to be squashed.
The bike lane should be clearly separated here, bypassing the traffic lights completely.
Created by Stephan Matthiesen // 0 threads
Drivers often cut the corner at the Bank of Scotland, driving over the cycle lane. The current layout encourages drivers to overtake without giving people on bicycles the necessary distance. Parking is also a dangerous problem here.
It would be easy to install plastic highway bollards here along the cycle lane which would encourage drivers not to encroach on the cycle lane.
Created by Stephan Matthiesen // 1 thread
Very difficult to cross here, coming from Brunstane Burn Walkway to turn right towards Musselburgh.
The timing of the traffic lights seems to be such that there is almost always traffic from one direction, so one often has to wait for very long here.
Created by Stephan Matthiesen // 0 threads
Lady Rd needs a segregated cycle path uphills. It's very steep uphills with dense&fast traffic, and it is particularly difficult to turn right.
Created by Stephan Matthiesen // 0 threads
Apparently it is not possible to close the road to through-traffic, but it could be significantly discouraged by making it a less convenient ratrun.
I suggest at the entrance to the carpark of Inch House the road could be changed to create a very tight corner. This would not affect people going to Inch House from either direction, but it would make it less convenient to drive through, and slow down the cars (there is a blind corner behind the house).
Created by Stephan Matthiesen // 1 thread
The road through Inch Park has a lot of very high/short speed bumps which are total bone-shakers for people on bicycles - dunno how many eggs I have broken cycling home from the shopping centre.
I realise aggressive speed bumps are there to remind drivers of the 10mph speed limit.
Perhaps they could be changed to have a gap or a shallower ramp in the centre so that they are easier on bicycles. Some actually have pothole repairs which essentially created such a ramp and they are much nicer.
Presumably this would also be better for users of mobility scooters.
Created by edge // 1 thread
When approaching this junction from the East on Widney Lane (and possibly other directions as well), the traffic lights do not detect the presence of waiting cycles.
Since the default priority at this junction is for traffic on the Blossomfield Rd / Marshall Lake Road axis, this means that cycles heading from Widney Lane to Longmore Road have to wait indefinitely to cross the junction.
In busy times this is not a problem, because a waiting car will trigger the traffic lights to change.
However, at quiet times this effectively means cycles cannot cross this junction legally at all. I have experimentally waited more than 5 minutes for the lights to change. Unless a car comes to trigger the change, cyclists are stuck.
This "bike-blindness" built into the road signalling infrastructure is unfortunately not uncommon. As well as being inconvenient for and disrespectful of cyclists, it reinforces the notion that bicycles are second-class road-users - indeed that they do not really belong on the road at all.
Created by Stephan Matthiesen // 0 threads
It would be great to have a pedestrian/bicycle entrance in the South East corner of Kings Buildings. This would be of much benefit to everybody coming from the south, as you can avoid the steep, busy Mayfield Road.
Created by Stephan Matthiesen // 0 threads
The shared footpath under the bypass ends at the bottom of Loanhead Rd and then there is no suitable connection into the Straiton Retail Park area.
Loanhead Rd is very steep with fast cars. Straiton Rd is fast dual road with unconnected bits of narrow painted cycle lanes. Both are total barriers for other than high-risk extreme sports enthusiasts. No way families could cycle to the shopping centre here.
The connections into Edinburgh (Burdiehouse Burn, or the new Loanhead-Lasswade path) are actually really good, so it's particularly sad that you're dumped in a car hell on the last few hundred metres.
Created by Stephan Matthiesen // 0 threads
Need considerably more bicycle parking at the shopping centre. The few racks here are often overfull.
Created by Stephan Matthiesen // 0 threads
Need proper bike parking in front of Summerhall. Bikes chained to the guardrails are a hazard for pedestrians.
Some should be right at the entrance, some more could be at the front of Summerhall Square (please not tugged away somewhere at the back of Summerhall Square where it would be perfect for thieves).
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
Created by Stephan Matthiesen // 0 threads
Contraflow here would make it much easier to get from Pleasance and Geography Dept in Drummond Street to South Bridge and avoid the uphills detour to Hill Place.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane to make it easier to get from University to East Crosscauseway (St Leonhards, Innocent etc.) and St Patrick Square.
Created by Stephan Matthiesen // 0 threads
Make more pedestrian friendly and discourage car use. There has been a fatal collision in 2012 but near hits are common.
Remove the fence around the garden, or add additional entrances on all four corners, to open it up and enable pedestrians to use the garden to cross the square in East-West direction and diagonally. At the moment it doesn't have an exit in the west, making it a dead end and barrier for people moving between Nicolson St and Potterrow.
The pavement on the south (from Mosque kitchen to the libanese restaurant) are far too narrow. Double yellow lines regularly ignored, creating blind corners, making it difficult for pedestrians to cross.
Marshall Street should be narrowed considerably to one lane, as it's really only used for a few bus lines, no need to have two fairly wide lanes here. The southern pavement far too narrow, but it is very busy with pedestrians.
It is used a lot as ratrun between Nicolson Street and Potterrow.
Created by Stephan Matthiesen // 0 threads
These racks are too close to the wall so you can't actually lean a bicycle against them in a stable way.
Also why only so few in such a central and busy location?
Created by Stephan Matthiesen // 0 threads
Need much more bicycle parking here, also to access Nicolson Street.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Stephan Matthiesen // 0 threads
Cobbles, tarmac patches etc almost impossible to cycle on.
These streets are key connections between centre and the Innocent Path.
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.