Cambridge Retail Park redevelopment
Railpen are consulting on changes to the Retail Park on Newmarket Road
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 1 thread
Railpen are consulting on changes to the Retail Park on Newmarket Road
Created by sarah // 1 thread
Anything to do with the DNA path - lighting, vegetation, obstructions
Created by Owaldron // 0 threads
Fallen Tree at head height - reported to Kent County Council - Fault Number 240650775
Created by Owaldron // 0 threads
Recent FOI confirmed that foliage cutback should occur in ‘Bi-annually’ on the Fordwich Way route in May and September every year. No foliage cutback has taken place on the Fordwich Way in May. The whole path is slowly becoming overgrown and will need cutting back as per Kent County Councils own internal documents. The whole route needs foliage clearance - Fault No. 811012
sound+fury // 1 thread
Creation of additional storey above existing single storey (middle) part of the site and redevelopment of rear part of the site comprising: demolition of existing building and structures and creation of five storey office building.
16 - 17 Sidney Street Cambridge Cambridgeshire CB2 3HG
Cambridge
Application reference : 24/01905/FUL
Created by cpax // 1 thread
On a recent ride up The Mere Way I noticed that the wooden pillar had been removed and that cars were being driven on the route .
Created by Gregory Williams // 1 thread
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
Created by Gregory Williams // 0 threads
Cycle parking provision at Longmarket needs to be improved. The are insufficient stands at Rose Lane, leading to cyclists using other street furniture, such as pictured.
Created by KW // 1 thread
Partial demolition, alterations and extensions to Clarendon House, new ramped vehicular access, delivery bay, cycle access and parking, etc etc
Quite a lot of cycle parking, and some reduced car parking, in the basement. Cycle and car movements cross with potential visibility issues.
sound+fury // 1 thread
Erection of seven residential dwellings along with access, car and cycle parking, landscaping and associated infrastructure works following demolition of existing buildings.
195 Perne Road Cambridge Cambridgeshire CB1 3NT
Cambridge
Application reference : 24/00922/FUL
Created by Martin Wheatley // 2 threads
Planning application not addressing cycling issues credibly.
Created by T9292 // 1 thread
Poor surfacing of the road with potholes, cracks and very limited space for pedestrians
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cambridgeshire County Council is publishing this proposal on 18th March 2024.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
New thread to discuss proposals.
Created by C // 1 thread
The cycle lanes on this road have trees growing over them with many branches at eye height (as demonstrated by my glamorous assistant).
Created by Josh Grantham // 1 thread
Demolition of existing buildings and structures, and erection of building (Class E(g)i/ii) with associated access, site infrastructure, landscaping and car and cycle parking provision.
Brookmount Court Kirkwood Road Cambridge Cambridgeshire CB4 2QH
Cambridge
Application reference : 23/04289/FUL
Created by Josh Grantham // 1 thread
Outline planning application for demolition of existing buildings and construction of a new business/science park (Use Class E(g)) and ancillary "hub" building (Use Class E(b)(d)(f)) and associated car parking and landscaping.
Sawston Park London Road Pampisford Cambridgeshire CB22 3EE
South Cambridgeshire
Application reference : 24/00166/OUT
Created by cpax // 1 thread
Very uneven surface on cycle path between Fen Ditton village and Horningsea .
sound+fury // 1 thread
Change of layout to existing customer car park.
Land At Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire CB5 8WR
Cambridge
Application reference : 24/00384/FUL
Created by KW // 1 thread
Submission of details required by condition 10 ( hard and soft landscape works) and 11 (Cycle parking) of planning permission 22/04976/FUL
26 Barton Road Cambridge Cambridgeshire CB3 9JZ
Cambridge
Application reference : 22/04976/CONDB
Created by KW // 1 thread
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
Created by Gregory Williams // 2 threads
There isn't a dropped kerb at the northern end of the Legacy Park cycle path where it meets Chaucer Road. Therefore cyclists can't easily transition between the cycle path and the road here.
Created by Gregory Williams // 1 thread
The signs at the junction between Mill Lane and St. Radigund's Street in Canterbury have gone missing.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
There are relatively shallow paths that run from both ends of the bridge down to the A4143, but both have shallow steps that stop them being useful to cyclists. This means that people heading out of the hospital wanting to cycle down the A4143 towards Llanfoist have to cross the road with the traffic, rather than the safer alternative of crossing the bridge and coming down the ramp.
Note that openstreetmap's map of this is incorrect. I'll submit a correction (11-04-2014)
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by T Harris // 1 thread
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by Roxanne (CEO) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Belle Vue Road is very steep for a recommended cycle route."
It's marked on the Ipswich Cycle Route Map.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Lewisham Cyclists // 1 thread
Royal Borough of Greenwich consultation on improvements to road junction at Blackheath Gate of Greenwich Park for Quietway 1 extension.
Consultation closes 19th April 2019.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Charles Martin // 1 thread
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by Mike Comerford // 1 thread
Those of us living in the area marked have no safe access to the cycle network in order to cycle in and out of Dumfries. There are many keen cyclists in this area (as evidenced by the Toirthorwald Cycle Sportive for example).
I live with my family in a cluster of houses close to the A75 (Mouswald Banks) end of Linns Road. There are a number of cyclists at this location and we wish to cycle to Dumfries for work and for social / leisure reasons.
Our Options are:
- the A75 - definitely not safe
- to Torthorwald then along the A709 - narrow, full of heavy trucks, no pavement and very unsafe
- through Torthorwald, across the A709, onwards to Tinwald and then onto the A701 towards Dumfries until able to join the Caledonian Cycleway at Locharbriiggs. This stretch of the A701 is narrow and full of heavy trucks. Where there is a pavement it is too narrow to cycle along it. This is also a long way round to get to Dumfries.
The best solution would be to create a cycle path from Torthorwald along the A709 and through Heathhall woods to connect with the cycle network. This would serve Torthowald, Collin and surrounding hamlets. There is land along the side of the A709 to allow space to make a cycle path.
The shortest in terms of building new infrastructure, would be to make a cycle path along the A701 from the Tinwald road end to Locharbriggs. However space at the roadside along the A701 is very limited, and the route is a long way round for the communities from Torthorwald and Collin.
Building a cycle path along the A75 is an unlikely and unattractive proposition and would cause disruption along a major Trunk road.
Active travel is a priority for the Scottish Government to increase physical activity and reduce traffic emissions. Funding is available through Sustrans.
'Sustrans Scotland's Community Links programme provides funding for the creation of infrastructure that makes it easier for people to walk and cycle for everyday journeys. The programme is funded by Transport Scotland and has funded hundreds of projects across Scotland since 2010.
Through the Scottish Government's Programme for Government 2017-18, the active travel budget has been doubled to £80 million per year, from 2018-19. Community Links will help deliver a key action from this by supporting projects that make our towns and cities friendlier and safer places for people to walk and cycle.'
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"