BARNSTAPLE TOWN CENTRE - FIVE YEARS PLAN
Upgrade wide footpath on south side of Bear Street into shared path between Alexandra Road and Sunset Heights
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by North Devon Cycling Forum // 0 threads
Upgrade wide footpath on south side of Bear Street into shared path between Alexandra Road and Sunset Heights
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Alexandra Road to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
New Cycle Path on south side of Queen Street Car Park between Queen Street and Bear Street/Alexandra Road junction
Created by North Devon Cycling Forum // 0 threads
20 mph speed limit on Derby Road between Alexandra Road and St Mary's Road (in front of Yeo Valley School) and on St Mary's Road
Created by North Devon Cycling Forum // 0 threads
Upgrade and widening of current footpath Pelican crossing Alexandra Roundabout - Derby Road
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing to toucan crossing, with ONE press on button to cross whole road!
Created by North Devon Cycling Forum // 0 threads
Upgrade and widening of current footpath Vicarage Street - Pelican crossing Alexandra Roundabout
Created by North Devon Cycling Forum // 0 threads
Create acceptable crossing point for cyclists from Vicarage Street onto path on south side Alexandra Roundabout
Created by North Devon Cycling Forum // 0 threads
Removal of LETHAL narrow cycle lanes on St Georges Road when road is due resurfacing! Do NOT paint centre road lines back in either! Consider 20 mph zone for whole area long-term.
Created by North Devon Cycling Forum // 0 threads
Upgrade and widening of current footpath west side of St Georges Road between Raleigh Meadow and St Mary's Road
Created by North Devon Cycling Forum // 0 threads
New shared path through public field connecting Yeo Vale Road with Raleigh Meadow
Created by North Devon Cycling Forum // 0 threads
Upgrade and widening of footpath at end Yeo Vale Road into shared path solution, acceptable for residents
Created by North Devon Cycling Forum // 1 thread
20 mph speed limit for Yeo Vale Road area
Created by North Devon Cycling Forum // 0 threads
Surfacing current dead end path (private?)
Created by North Devon Cycling Forum // 0 threads
Relocation of private gate
Created by North Devon Cycling Forum // 0 threads
Cycle path across far end of private car park
Created by North Devon Cycling Forum // 0 threads
Create gap in private car park wall to cater for new cycle path through far end of private car park
Created by North Devon Cycling Forum // 0 threads
New path alongside Alexandra Road (Northwest side)
Created by North Devon Cycling Forum // 0 threads
Upgrade pelican crossing Alexandra Road (at corner Boutport Street) to toucan crossing
Created by North Devon Cycling Forum // 0 threads
New Cycle Routes linking current dead end Rolle Quay path infrastructure with ramps in/out of Pilton Park to Pilton High Street AND Yeo Vale Road. Note the Rolle Quay path infrastructure from the south across River Yeo has already been built, leading onto the tarmac path "rounding" Pilton Park on the north side (near playground). What is missing are the ramps to Pilton High Street and Yeo Vale Road.
20 mph speed limit for Town Centre area. This is essential to make particularly Vicarage Street, Boutport Street, Bear Street, Queen Street and Tuly Street more inviting to cycle on. Taxis, cars and buses reveling up to 30 mph just for 100 metres or so are highly harassing for cyclists and there is just no time gain to it.
The North Devon Cycling Forum recommends a 20 mph zone for the whole area enclosed by the River Taw, The Square (A3125), Alexandra Road and North Walk. On North Walk, the 20mph zone could start/end at the Civic Centre Car Park entrance, but ideally at Rolle Quay roundabout.
Created by North Devon Cycling Forum // 0 threads
Change of Road lay out on Long Bridge; NO new centre road line when road is due resurfacing and long term research into "shared space" alternative road surface
Created by North Devon Cycling Forum // 1 thread
Surface of Tarka Trail Braunton-Barnstaple needs replacing long-term; wobbly sections developing
Created by North Devon Cycling Forum // 0 threads
Cycle path B3233 up to 50% overgrown by bushes between Fremington Pill and Penhill junctions
Created by North Devon Cycling Forum // 0 threads
Closure of lay-by Mill Hill B3233 to improve safety on cycle route Barnstaple-Fremington. Current situation for cycling FROM Barnstaple TO Fremington is lethal; this is NOT a safe route! Alternatively, to keep the car park function of the lay-by, a new entrance to the lay-by is possible by creating a STRAIGHT T-junction onto the main road at the eastern end of the lay-by.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Matthew // 2 threads
On 1 January 2026, historic routes in England that aren’t properly recorded will be lost to the public forever. We are looking for people to volunteer their time to help us identify and register these routes before it is too late.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Stephan Matthiesen // 1 thread
The chicane at the west end of the Magdalene Glen path interrupts the flow when going uphills, particularly unpleasant for people with weak knees. It also forces cyclists uphills often to stop and start when there are other people going through, as it's not wide enough to pass.
It doesn't serve any useful purpose at it is on the top of the slope where cyclists are very slow anyway. As it's uphills, there is little danger that e.g. kids run out onto the wide pavement of Duddingston Pk South. Cyclists from the West are slow at this point anyway as they turn into the path.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.