post removed ( Nightingale Avenue )
Post removed , increased usage by cars .
-
Camber on bike entrance going east on Glisson Road not trike-friendly
Turning from Hills Road onto Glisson Road going east, there’s a “cycles only” lane on the left-hand side, with a concrete separate from traffic in the other direction. The camber is extremely steep in the cycle gap, and risks our cargo trike overturning. The barrier is well meant, but ultimately the steep camber means we have to enter on the wrong side of the barrier, which is less rather than more safe than not having a battier at all.
-
-
Damaged bridleway sign
The Heathfield Bridleway is generally a good piece of off-road provision that links Thriplow to Heathfield/Duxford whilst avoiding the A505. The sign is damaged; Cambs CC say it’s not their duty to repair/replace.
-
Westbrook centre redevelopment
There are plans to redevelop the Westbrook Centre to a life sciences campus.
There is a "listening event" today Wednesday 17th May 3pm at St Luke's Church, Victoria Road.
-
23/01815/FUL Residential (Cherry Hinton)
Eight flats, six car parking spaces, eight bike parking spaces. Access from Cherry Hinton Road, within the queue region for the 'Robin Hood' junction, across the existing shared-use path.
-
23/01701/FUL Change of use of from office to student accommodation - 8 rooms
Change of use of first, second and third floors from office (Class E) to student accommodation (Class C2) comprising 8 student rooms and ancillary facilities. External works comprising the installation of an external staircase and entrance, PV panels to the roof and an Air Source Heat Pump at ground floor level. Installation of two openings into the listed wall for means of access and daylight to the rear.
First Floor And Second Floor And Third Floor 98 Regent Street Cambridge Cambridgeshire CB2 1DP
Cambridge
Application reference : 23/01701/FUL
-
Planned layout of new cycle/pedestrian crossing on Milton Road near Ascham Road
I noticed that on the plans for the ongoing Milton Road development, the plan for a new double split cycle/pedestrian crossing across Milton Road near Chesterton Hall Crescent/Ascham Road has the cycle crossing on the East side and the pedestrian crossing on the West side. The problem with this is it is the opposite way round from the way cyclists/pedestrians approach the crossing from Chesterton Hall Crescent (cyclists on the West, pedestrians on the East). In the mornings, this crossing is extremely busy with pedestrians and cyclists travelling from South to North (to reach Milton Road primary school and Chesterton Community College), and at the north side of the crossing, cyclists need to be on the West side to travel up Ascham Road and the pedestrians tend to walk on the east pavement. The new crossing plan would mean cyclists having to cross the flow of pedestrians on both sides of Milton Road. This would lead to queues of bikes on the crossing (in the road) and seems quite dangerous. I think it would create a natural flow if the crossings were switched to have the cycle crossing on the west (and this is how cyclists and pedestrians naturally organise themselves on the current toucan crossing)? I've included a photo where I've drawn arrows showing the cyclist/pedestrian flow lines in the current plan and if the crossings were switched. It hasn't been built yet so I wondered if there is a way to suggest this to GCP and do you think a change would be considered at this stage?
-
Mile Road /Roman Road /A 1307
Hi ! , I am writing to you to voice my concerns that the Bridleway ( Mile Road ) between the Roman Road and the A 1307 is
under threat .
As a regular user of this route ( cycle ) I first noticed that the finger post on the A 1307 had been removed some weeks ago
and on passing that way today found mounds of earth had been pushed up to the large gate making it almost impossible to
pass through . This route is heavily used by people wanting to go from Fulbourn to Babraham or just for walking . It is a well
defined route on all the maps / cycling Apps . I am incredulous that this threat to this route can so easily be blocked . -
Election campaign 2024
It is important that we engage with the candidates at each election, scrutinise their views, and press for commitments to active travel and sustainable transport.
-
New scoping application for 'Land South of Coldham's Lane'
Hybrid Planning Application at Land South of Coldhams Lane comprising: Full Application for 'Parcel A' Building 1 (Use Classes E(g)(i) (Offices), E(g)(ii) (Research and Development)) and the Hub Building (sui generis) with associated car and cycle parking, Outline Application for the remainder of 'Parcel A' for E(g) uses including office, research and development, car and cycle parking, landscaping, infrastructure and associated works, with all other matters reserved except for access, Full Application for ecological enhancements to 'Parcel B', Full Application for landscape improvements and access to 'Parcel C'.
Land South Of Coldhams Lane Cambridge Cambridgeshire
Cambridge
Application reference : 23/01683/SCOP
-
temporary fencing on Haling way
Temporary fencing, for no apparent purpose, that then becomes a hazard as it falls over or degrades.
-
A users first approach to cycle infrastructure design.
How can we tell whether a bicycling environment is good or bad? How many times have you been cycling along a piece of existing infrastructure only to find the word 'end' written on the pavement and yourself forced back onto the road into traffic?
With this in mind, I am undertaking a piece of research as part of my masters dissertation at Queens College, University of Cambridge. I am gathering primary data of existing users of the current cycling network across Cambridge. From this data I will be able to assess the coherence and directness of the existing cycle network and identify potential 'bottlenecks' and issues from the point of view of the users.
-
Greenway: Lode to Swaffham Bulbeck
Because of a combination of subsidence and grass tussocks growing through the path, my wife's e-trike tipped over on the Greenway path between Lode and Longmeadow this afternoon. Fortunately she is only bruised and shaken but it could clearly have been a lot worse. I have reported it to Cambs Highways as an emergency.
Unless and until it is repaired, I would advise extreme caution on this section of the Greenway or use the Bottisham Greenway, Tunbridge Lane, Park End and Swaffham Bulbeck High Street instead. The on-road sections of the latter are usually pretty quiet.
-
23/1287/FUL Extension of and alterations to Quy Mill Hotel
The area covered includes the cycle route to Church Road. It may also be useful to look at the cycle parking.
-
Extension of 19-35 Regent Street
Downing College are proposing to extend and rework the old 'Pizza hut building' on the corner of Parker's Piece.
I can't see any obvious issues other than making sure that sufficient cycle parking is created. I think they are intending to put this within the main college grounds themselves, over the road, which probably makes most sense.
-
Government Transport Policy
This (apparently) revised draft leaves little/nothing for any other forms of transport and continues a policy of road expansion.
-
Planning application: 23/00795/FUL Wendy's restaurant, Emmanuel St
Change of us from Class E to a composite restaurant (Class E) and takeaway use together with external changes
56 St Andrews Street Cambridge Cambridgeshire CB2 3DA
Application reference : 23/00795/FUL.
The plans indicate that the existing heavily-used cycle parking will, at least in part, be removed.
-
Hills Road North Sixth Form College
Not much information yet, but Hills Road Sixth Form College are hoping to create a second base to the north/east.
-
Planning application : 23/00872/REM Plaza adjacent to proposed primary school
Plaza adjacent to proposed primary school on key phase 1
Waterbeach Barracks Key Phase 1 Primary School Plaza Denny End Road Waterbeach Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 23/00872/REM
I haven't spotted whatever it is that is supposed to provide "access for picking up and dropping off pupils". There seems to be a 5-Sheffield toastrack ("exact product TBC") on what looks like the 'drive' (next to 'He' which means heritage surface coarse asphalt). I do not see anything that would encourage use of Bakfiets etc.
Image is a crop from LANDSCAPE GENERAL ARRANGEMENT PLAN
-
Social Media Hostility
I have noticed that especially since the congestion charge there has been a lot of aggression towards Camcycle in social media comments. Notably on Facebook, Nextdoor, etc. I am aware that angry aggressive people have always been on the internet but I do feel the level has increased since congestion charge notoriety, with many people's opinions degenerating into conspiracy theories about Camcycle and the council.
I do worry about the effect this can have on increasing "us vs them" mentality and increasing aggressive behaviour towards cyclists on the road.
-
22/05018/REM - land to the west of Cherry Hinton Road/ Airport Way
We might need to look at the road layout proposed here.
-
Blockage on Horningsea Greenway in Fen Ditton
Works on the Greenway on east side of the Horningsea Road. No provision for cyclists to pass safely. Only option is to cross at previous pedestrian crossings, though there is no signage to indicate this.
-
Lincoln's lane car park crossing
Improvements required for safe crossing of walkers, cyclists and horseriders using the main path through the forest.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
Pinch point created by pedestrian crossing
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
-
Dangerous section of cycle path outside Dominos Pizza on the Avenue
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
-
Dogs Head Street cycle contraflow lane parking/loading bay
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
-
Tandem carriage on Scotrail trains
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
-
Grey Street
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
-
St Peters Dock lethal rail tracks
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
-
Cycling on A2
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
-
Clerkenwell Boulevard
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
-
Chisholm Trail
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
-
North Meadow Walk - NMW
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
-
Safer Walking and Cycling between NW Cambridge and Girton
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1sI’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafetyThe petition:
http://www.ipetitions.com/petition/EddingtonSafetyAnyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.ukRegius Professor of Engineering,
Cambridge University Engineering DepartmentAuthor of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/Girton resident and parent.
Cambridge Cycling Campaign Member -
Tower Bridge road surface problem
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
-
NCN route 11 and the Waterbeach Gap
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
-
Wandle path bypass for Earlsfield
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
-
Lack of safe room for cycles, terrible road surface
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable. -
A14 very hostile for cycling
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
-
Lack of cycle routes to Cambridge Business Park, Waterbeach
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
-
Replace Hooper Street gates with bollard
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
-
A41 Divides Guilden Sutton from Chester - better crossing needed
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.] -
Ommision of lights creates danger on cyclepath
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
-
Reach Fair Ride
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.htmlI've created this issue to help plan this event.
-
Cycle Superhighway 1 consultation (CS1)
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
-
Brook Hill Roundabout
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
-
Dangerous to cross Milton Road diagonally at Toucan crossing
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
-
Prince St Bridge - Quick Fix
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.