NIAB development
A development of 1,780 houses, including community facilities, roads, footpaths and cycleways. Frontage land has already been built on (this is the land facing Huntingdon Road) and outline planning permission given.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by cobweb // 7 threads
A development of 1,780 houses, including community facilities, roads, footpaths and cycleways. Frontage land has already been built on (this is the land facing Huntingdon Road) and outline planning permission given.
Created by cobweb // 4 threads
A development of 1,200 homes and a country park to the south of Cambridge.
Created by Klaas Brümann // 1 thread
Cllr Sabastian Kindersley (LD, Gamlingay) writes in a letter in todas Cambridge News that "the university plans to rebuild the road bridge linking Haslingfield and Barton. ... chance to provide a safe combined pedestiran/cycle path down on to the track so residents can avoid the narrow and dangerous road and so access the A603 safely. The approx cost of this work is £40,000.
What do we know about this?
Martin Lucas-Smith // 6 threads
South Cambridgeshire District Council are reviewing their Local Plan. It is important that cycling issues are dealt with and brought to their attention during this process.
Martin Lucas-Smith // 9 threads
The Great Kneighton (Clay Farm) development will have effects on cycling. A series of planning applications have been passed and more will come.
Nigel // 0 threads
Department for Transport press release 23 March 2012:
http://assets.dft.gov.uk/press-releases/20120323a/east-england-fact-sheet.pdf
Cambridgeshire "Better Bus Area Fund"
Cambridgeshire will receive £1,724.000 to improve accessibility, bus journey times on key bus routes in Cambridgeshire. The changes will include new traffic management on four corridors into the city, bus priority, upgraded buses, improved interchanges (including with Guided Busway), smart ticketing top-up on street and real time passenger information. For further information, go to http://www.cambridgeshire.gov.uk/NR/rdonlyres/1BA212D3-E038-47C5-9E0A-50E2BDBE3AB7/0/CambridgeshireBBAFproposalFINAL.pdf.
The proposals include much of relevance for cyclists, including bus priority at junctions, a "bus gate" through the middle of Mitcham's Corner and more.
Created by Simon Nuttall // 1 thread
A campaign member and resident of the area has sent this:
I've just received a consultation paper from the City Council for residents of Stanley Road, Garlic Row and Oyster Row. I've summarised the proposals below.Scheme 2 Option B seemed the most significant.
Scheme 1. Extension of parking and loading restrictions on Stanley Road
Scheme 2, Option A. "No entry except cycles" on Garlic Row adjacent to the junction with Mercers Row
Scheme 2, Option B. Oyster Row becomes one-way in the northeasterly direction. No exemption for cycles.
Comments to Gavin Card at the City Council by the 30th March (gavin.card@cambridge.gov.uk or PO Box 700, CB1 0JH)
Created by Rohan Wilson // 0 threads
The Grove Pub. Transport Statement recognises that 19 cy spaces should be provided (1 per 15sqm public space), states they are in "garage" but details not given, just assumed space available. Needs closer look. TRICS database for a Leeds Sikh Temple shows no cycling, 16.4% walking, 3.6% public tpt.
Created by George Coulouris // 0 threads
The Foot tunnel should be more accessible
Martin Lucas-Smith // 0 threads
Blackfriar's Bridge is a major collision blackspot that actively discourages people from cycling.
Created by Gregory Williams // 0 threads
The cycle parking standards for Medway can be found here:
http://www.medway.gov.uk/pdf/Medway%20Council%20Residential%20Parking%20Standards%20Jan%202010.pdf
The standards have low minimum quantities and are very basic in their detail. There is no mention, for example, of the minimum space needed to be left around cycle parking, or the spacing of the cycle parking for it to be effective. Nor is there any mention of what constitutes an acceptable type of cycle parking (e.g. Sheffield stands) and what is unacceptable (e.g. wheelbenders). No mention is made about provision of covered cycle parking. No mention is made of the proximity of cycle parking to building entrances. No mention is made of the need for cycle parking to be highly visible and for lighting and CCTV coverage.
Created by Simon Nuttall // 1 thread
The cycleway between Fen Ditton and Horningsea
Created by Rohan Wilson // 0 threads
The adjacent, approved plot, 11/05530/FUL designed by the same architectural practice, places the cycle cupboard next to the front door and closer to it than is the car.
THIS proposal, however, offers the standard back-of-garden shed for bins and bikes, with the bikes beyond the bins, while the car driver door is adjacent to the house front door...
Note Manual for Streets 8.2.1, quoted in a prominent panel on p5 of the Cambridge Cycle Parking Guide:
"In residential developments, designers should aim to make access to cycle storage at least as convenient as access to car parking."
Created by Rohan Wilson // 1 thread
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is proposed as study rooms for students aiming to enter university. Thus they would be old enough to cycle independently within Cambridge, for example between their places of residence and the various study buildings.
Remarkably, it is suggested (Planning Statement) that the students might park their bikes on Station Road where cycle parking is available, and might be augmented, and walk to the proposed site. This is a distance of 700m, taking 10 minutes at a normal walking pace plus any waiting time to cross the East Road/ Regent Street junction. Any student with a cycle at Station Road would be likely to wish to use it to continue to the proposed site, if parking arrangements provided there were reasonably convenient and secure.
We are told that the Regent Street site is closer to the student residences than Free School Lane, but no more definite information is given as to how far the residences are from the proposed site or from Station Road.
The city's cycle parking standards are presumably set to reflect normal levels of demand from staff and students, and no explanation is given as to why "very few students have bicycles".
The access to the suggested cycle parking in a narrow yard at the rear of the building is presumably the gated passageway to its north. This is not made clear, nor is it clear whether there are steps to be negotiated. It seems impossible that more than perhaps a dozen bicycles could be parked in the yard most of whose width appears to be less than a bike's length, leaving no room for daily or emergency access with the parking arrangement indicated.
The transport aspects of this proposal have not been examined in sufficient detail for their impact to be properly assessed, but it is certain that there is insufficient space for the level of cycle parking required. There appears to be no disabled access. We therefore object.
Created by Rohan Wilson // 1 thread
12/0342/FUL 12 cycle spaces indicated but space looks inadequate (no dimensions or layout shown)
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is on a local cycle link and thus it is reasonable, in the context of Cambridge, to anticipate a high proportion of parents and children arriving by bicycle. Indeed, bearing in mind the limited car parking available we would recommend that a travel plan strongly promoting cycle access for staff and users be required.
We object because we do not believe that the cycle parking space(s) allocated are consistent with the stated aim and the need to achieve high cycling levels. In particular, tagalongs, trailers and large carrier-bikes are likely to form a high proportion of customer cycles. The dimensions of the small, unsheltered enclosure (designed as a bin store in the current use of the site?) and a proposed layout are not given but look insufficient, and include a narrow entrance.
If cycles for say 30% of 18 customers, their children and 8 staff were to arrive by bike (say 3 staff, 6 adult customers and 8 children during a single class) then allowing a 50% margin for changeover between classes, space would be needed for a variety of types of bike and trailer to accommodate some 3 staff, 9 adult and 12 children customers.
This sort of calculation and the detail of the use of the cycle parking spaces do not seem to have been presented by the applicant, and should be required and assessed before the application is determined. We suggest that at least one car space would have to be used to accommodate sufficient cycles on this site.
Created by Gregory Williams // 1 thread
Proposed 20mph speed limit along School Road, Saltwood. The design involves removing the buildout at the Brockhill Road junction and installing overrunnable humped buildouts at regular intervals on alternate sides of School Road. "Gate" features with kerb buildouts to restrict the road width will denote the start and end of the 20mph zone.
Martin Lucas-Smith // 1 thread
The Penny Ferry Path (Halingway) entrance remains rather poor even after the changes a few years ago.
The application proposes to design a new lobby for this department and to relocate the cycle racks.
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
This application proposes to demolish every but the façade of 55-57 Regent Street and create a restaurant with 14 residential units
Martin Lucas-Smith // 1 thread
Cycling on Long Road can be pretty hazardous and unpleasant. There needs to be a lower speed limit (30mph) as a minimum.
Created by Gregory Williams // 1 thread
This portion of the cycle path near Reed Pond gets quite muddy on an annual basis. In the autumn / winter / spring it can sometimes be quite difficult to traverse.
Created by Gregory Williams // 1 thread
The gaps between the boards on the ramp connecting to the Weir Court cycle bridge mean that cyclists crossing the bridge could get their wheels caught in the gaps.
Created by Gregory Williams // 0 threads
A new playground is being proposed in the vicinity of Vauxhall Avenue. The playground is welcome, but it is important that its placement does not jeopardise the long-term ambition of a riverside cycle route.
Created by Gregory Williams // 1 thread
The cycle parking at the new Waitrose in Ashford is positioned such that some spaces are not available for use. One rack is too close to a bollard. Both racks are too close to each other.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Henry Lancashire // 1 thread
Info from survey:
"The London Borough of Brent and Sustrans are working together to explore ways in which the Kilburn High Road and surrounding area shown could be improved. Together we want to better meet the needs of the community to make it a more desireable place to walk, cycle and enjoy being in.
...
London Borough of Brent and London Borough of Camden will submit a joint application to Transport for London's Liveable Neighbourhood programme in November 2018, which will incorporate suggestions made by the community."
Brent Cyclists are forming our own response, to be sent by end of October 2018.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Created by Roxanne (CEO) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.