Modify gate on cycle-path 46 near the castle
RAISED AT PUBLIC MEETING 10-04-2014
The cycle gate where route 46 enters castle meadows near the castle is poorly designed: very tight for long bikes such as tandems.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The cycle gate where route 46 enters castle meadows near the castle is poorly designed: very tight for long bikes such as tandems.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The cycle gate at the underpass between Llanfoist and Abergavenny is poorly designed: Impossible to pass with a 2-seat bike trailer, and very tight for long bikes such as tandems.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Several people mentioned that some people do cross the pipe bridge: Would it be possible to modify the bridge to make it possible for it to be an official crossing point?
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Can anything be done to improve this busy junction for cyclists and pedestrians?
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
School traffic from King Henry VIII School, exiting the school onto Pen-y-Pound, uses this very narrow route as a quicker way, at a busy times, of getting to the A40 or to Old Hereford Road. Can anything be done to discourage drivers from using these narrow lanes as a rat-run?
The issue of fly-tipping on Deri Road was also raised.
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Waiting to turn right onto Chapel Road from Brecon Road can be unpleasant. Can something be done to improve this junction for cyclists?
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Turning right from Park Street onto Pen-y-Pound, by Tesco, can be awkward, as eastbound cars often come around the bend from Frogmore street very quickly. How can this be solved?
Created by George Coulouris // 1 thread
We have of course been campaigning for a cycle and pedestrian connection enabling more direct movement between Kentish Town Road and Grafton Road for years. At one time a semi-official route via Arctic Street was actually established, but the landowner eventually vetoed it for various reasons.
How can we revive the campaign for this?
Created by Al Storer // 1 thread
The Draft Cambridgeshire Long Term Transport Strategy and Local Transport Plan Refresh has, as a City Deal item, a £43million project to create "Comprehensive segregated bus priority / Busway on Newmarket Road into Cambridge between Airport Way and Elizabeth Way / East Road."
This is quite clearly an opportunity to get far better cycle provision on this corridor.
Created by MJR // 0 threads
For a change, I tried following the route signs for the station today. As well as a mystery tour near the Grafton centre where the signs simply stop, my route was blocked at Gresham Road by "WET TAR" and a sign proclaiming it. No diversion was signed and there were no advance warning signs that would have let me pick a better route earlier. Plenty of people were riding along the footways - enough that it was too crowded for me to feel safe doing so. I performed a U-turn, waited a second time at the crossroad traffic lights and rode along the very busy Gonville Place and Hills Road instead.
I've tweeted at Cambridgeshire County Council and Cambridge City Council in https://mobile.twitter.com/mjray/status/453926972843118593 because I don't think that is legal - a cycle route suddenly being blocked by wet tar does not comply with the code of practice on safety at streetworks, which is required by law. I'm disappointed to encounter this in Cambridge.
Created by BrianInBeeston // 0 threads
The DfT have contracted consultants to come up with a concept for a north south cycle route broadly following the alignment of the HS2 railway line, but linking up key points of interest and centres of population along the way. For the section from East Midlands Airport to the new station at Toton, a key issue is where the cycle route should cross the Trent. There is a compromise to be made between the shortest route from EMA-Toton and locating the bridge where it would serve the largest population. A more Eastern bridge would serve large population centres in Beeston & Clifton, whereas a more western bridge would be a more direct route. A possible compromise would be to locate the bridge near the existing rail bridges at Trent Junction near Trent Lock.
Created by Sam Charrington // 0 threads
The National Speed Limit currently applies on this very narrow lane. There should surely be be a 20mph limit here? Pentre Road runs along the tops of a number of residential streets on the edge of Abergavenny. It is popular with cyclists and pedestrians. Much of the lane is extremely narrow, with some blind bends, and it is not possible to drive safely along here faster than 20mph.
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
We aren't aware of plans to replace this particular crossing with a bridge, but it does have the highest risk score of any crossing in the area, so will e on the Network Rail radar.
Created by BrianInBeeston // 0 threads
Following a number of deaths at crossings in this area. This footpath which crosses the midlands mainline is being considered by Network Rail for replacement with a bridge. Unclear at this stage if it will have steps or ramps
www.nottinghampost.com/Plans-new-bridges-railway-crossings-revealed/story-20914367-detail/story.html
Created by BrianInBeeston // 0 threads
Following a number of deaths at this crossing where a footpath crosses the midlands mainline, it being considered by Network Rail for replacement with a bridge. Unclear at this stage if it will have steps or ramps
www.nottinghampost.com/Plans-new-bridges-railway-crossings-revealed/story-20914367-detail/story.html
Created by BrianInBeeston // 0 threads
There has been a surge in use of the station during tram works. Some new users may continue using the station after completion. There is no car park so the village is full of cars. The cycle racks aren't heavily utilised, might be more cycle usage if secure cycle parking were provided.
Created by BrianInBeeston // 0 threads
A white dividing line was put down on University Boulevard in error by the tram contractor. It was not agreed by the City Council.
The white line will be removed. However the cycle path alongside University Boulevard is to be programmed for resurfacing - this will remove the white line and upgrade the surface. This work will be undertaken and paid for by the tram contractor as part of the works they are undertaking to upgrade cycle facilities along the new tram routes.
Created by Heather Coleman // 1 thread
When I popped into the Cambridge Wine Merchants last night, there were signs on all the posts and sheffield stands saying "no cycle parking from 6am, 7th April". I assumed some royal visit. I asked the man in the shop if he thought people not being able to park would affect trade and he said he hoped not. However, by the post where I normally park there's a big "road closed" sign, 6am-6pm (I think).
He is under the impression that there is filming going on from 7am-10am. It is period filming in the 1950s therefore you can't have sheffield stands (probably not invented) or modern bikes.
My main question/gripe is, when I see a "road closed" sign, I assume I will be able to get through even if I need to dismount and wheel my cycle. Sometimes, if it's a long walk, it may be quicker to cycle via another route. From the nature of what I've been told is going on, it sounds to me as if actually the road will even be closed to pedestrians, well unless they're wearing authentic 1950s dress.
Does anyone know any more? Does anyone know anything about the legal status of forcing pedestrians to take a lengthy diversion from what is the public highway? There are various cyclescape threads which have mentioned that although cars only have a permissive right to use the road, pedestrians have some stronger right. Can they force pedestrians and dismounted cyclists to go another route, when it's not an issue of national security?
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by timlennon // 0 threads
There are a lot of schools in our ward, and a lot of traffic. Children should be able to cycle to them safely without having to share space with high volume, fast traffic. Schools should all have 20mph zones, with car-free access around the school, and protected routes to arrive there.
this path isn't a right of way it has a locked gate.
sketch of route following verbal discussion between Brian & SB.
Created by timlennon // 0 threads
Bushy Park is a pleasant place to cycle and provides a number of potential routes for people wanting to get around the area. However, it should be possible to leave the Park at the Holly Road exit and proceed without the current level of potential conflict and threat inherent in the present route. We’d like to see protected space for cycling allowing people to leave the Holly Road exit and get to Broad Lane and the nearby schools - Denmead and Carlisle Infants.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Request for a screening opinion for the erection of a motorway service area
Land At O/S Grid Ref 460946 147950 M3 Basingstoke Hampshire
Basingstoke
Application reference : 16/02767/ENSC
http://pad.basingstoke.gov.uk/DocumentViewer/?DocumentClassCode=DC&Folder1Reference=16/02767/ENSC
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099199.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/09/91/01099197.PDF
http://pad.basingstoke.gov.uk/documents/4753/01/10/05/01100568.PDF
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Sefton // 1 thread
The Lovers Loan shared path through the Grange has at least 5 very tight barriers along its length, and missing dropped kerbs - especially at the crossing of Dick Place. Removing barriers or widening them would make it much more easy to use for bikes, buggies and wheelchairs. Even some double pushchairs don't fit!
Created by Chris Peck // 1 thread
A long, tortuous issue, where no progress has been made, despite large amounts of effort. Godalming High Street was recommended for adopting as a trial two-way working for cyclists in 2001, thanks to Alec McCalden's excellent presentation to the Planning Inspector at the time.
However, the trial was never carried out. Cyclists continue to use the street in both directions, as there are plenty of ways to get out of the way of oncoming cars.
The City of London has introduced dozens of contra-flow cycling schemes on narrow streets and lanes across the City. A third of all the cyclists are now using the contraflow. There has been 1 cycle crash three years post-introduction (there were 2 in the three years before). See here for more details: https://www.ucl.ac.uk/transport-institute/pdfs/Cheung_slides.pdf
Created by Charlie Halliday // 5 threads
Proposal to address Farnborough Town Action Plan reference CW39. Issue: Alexandra Road, safety, pedestrian and cycle links.
Consultation documents may be downloaded from:
http://www3.hants.gov.uk/transport-schemes-index/farnborough-alexandra-road.htm
They are also on view in the reception area at Rushmoor Borough Council Offices, Farnborough Road during the consultation period
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by CycleSi // 2 threads
TfL are undertaking major junction improvements at several gyratory systems. All of them include protected cycle lanes/tracks, except Wandsworth!
The local London Cycle Campaign group is not campaigning and virtually defunct. We desperately need to organise local cyclists and campaigners all over London and beyond to challenge this bizarre scheme.
Oval, Vauxhall, Elephant & Castle, Stockwell, Archway, Aldgate, etc, etc are all getting extensive safe space for cycling.
TfL for some reason (I suspect the blame lies with the borough) have instead decided to claim that the awful shared footpaths and streets with no cycling infrastructure at all that have been designated as 'cycle routes' form part of a 'cycle network'. They are even planning to have Cycle Superhighway 8 run along Wandsworth High Street with not even a painted cycle lane - cyclists will be mixed in with extremely heavy bus traffic.
It seems like no-one is talking about this other than me!! Seriously-argh!!!!
Suggestions, ideas, offers to help campaign all welcome.
Created by Simon Nuttall // 1 thread
Is it legal or not to ride on either Christ's Lane or Milton's Walk ?
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Colin Wing // 3 threads
This is the proposed route of Quietway 88 in Westminster. An alternative option uses the west side of Trafalgar Square instead of Cockspur Street.
Created by Simon Redding // 0 threads
The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Stephan Matthiesen // 1 thread
Cycle lanes in both directions needs urgent improvment. It's painted on but
- it is far too narrow, encouraging dangerous overtaking
- road surface in the gutter (=cycle lane) extremely bad, with deep&wide cracks, most covers have sunken etc.
- paint has faded
- parking (near the schools)
Many sections of Gilmerton Rd have hatching in the centre, wasting space; these sections would be wide enough for a segregated path (or wide lane protected by bollards/armadillos).
In the narrower sections, the existing bike lane should be removed completely because at the moment it increases the dangers (encouraging cyclists to be in the gutter between kerb and speeding cars).
Created by jennifer Kirner // 1 thread
I am bringing up the problem that cyclists and pedestrians have crossing East Road to get to ARU and the neighbouring residential area. It would be helpful have a discussion about how to create safe routes in this area and how to get them implemented.
When I am cycling, I find it dangerous and difficult to cross East Road from Petersfield or Bradmore Street and I resort to using the pedestrian crossings with my bike because it is.
This area that really needs addressing for improvements to safe cycling and I don’t understand why given the expansion of ARU this has not been addressed.
The junction of Mill Road/East Road is also pretty scary for cyclists and pedestrians. The crossing at the slip road at the corner of Petersfield is difficult for pedestrians because it has no traffic controls and cars come quickly round this corner making it dangerous for anyone who is not alert , who is not tall enough to see, or who can't move quickly. This includes the young, the old, someone in a wheelchair. I wouldn't fancy pushing a child in a buggy across either.
Basically, it seems to me that the Junction and East road are designed for motor vehicles and traffic flow not for pedestrians and cyclists. Can we try and address this?
Created by jpennycook // 1 thread
Erection of 40 dwellings to include 24 private homes and 16 affordable homes, associated parking, landscaping, amenity space and highway alterations
Land At Farleigh Road Farleigh Road Cliddesden Hampshire
Basingstoke
Application reference : 16/04690/FUL
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by GG // 1 thread
For a long time I have wondered about a crowd-sourced cycleability map.
In this, people cycle along a link (accepting the first question of how to define the beginning and end of this) then give it a thumbs up or down. After enough people do this, then others can see how popular it is.
Some people wonder about subjectivity but I think this should be less of a problem with more voters.
The reason I am asking is because this method could apply to a potential commercial project for a Council which wants to drive around 100km of rural roads and use a panel of 4 experts to grade meaningful segments on a 1 to 7 scale according to their suitability for HGV movements.
Any views on whether this is already done within an app I am not aware of, or could be it done by anyone as an add-on to something else, or is it something CamCycle could offer as a commercial package (there may well be more than one local authority looking for this sort of thing)
POSSIBLE Cycle Route Between Lowedges Rd/Chesterfield Rd + Bradway Fire Station Sheffield S8........using existing 8ft wide pavements by upgrading to "shared use".........This could connect to the new cycling "on + off " road routes being developed in the Meadowhead School area
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?