PA_212931_GodboltFarm5
Development comprising 5 new dwellings, 1 with link attached garage, two with detached garages; incorporating access onto Great Tey Road, Little Tey.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Steven Moseley // 1 thread
Development comprising 5 new dwellings, 1 with link attached garage, two with detached garages; incorporating access onto Great Tey Road, Little Tey.
Created by Steven Moseley // 1 thread
A proposed rural exceptions site of seven homes (resubmission of 201984)
Created by Steven Moseley // 1 thread
Outline application to refurbish the host house µLittle Glebe' from 3no. existing dwelling units to revert to a single dwelling house, anderect two new houses with a new access onto Spring Lane.
Created by Steven Moseley // 1 thread
Someone appears to have dumped large rocks and rubble into the pot holes in Daws lane. This might make the area more passable to cars that use it to access the allotments but poses a severe danger to cyclist given the size of the rocks, and that the area is poorly lit and frequently flooded.
I tried reporting the issue to the council but received the response:
The issue you raised with us is the responsibility of the landowner. Unfortunately we do not have records of who is responsible for this location and we are therefore unable to take any action.
Created by David Green // 2 threads
I run 1-day Wheel Building Courses in Cambridge
These are well-established intensive 1-day practical courses offered at 'level 1 (beginner) and level 2* (refresher/intermediate) level.
You learn how to build strong and durable bicycle wheels in a controlled, supportive environment. Group size is kept small to ensure a high student-teacher ratio. All equipment is provided, but you can bring your own components to build if you want to.
For fully information, dates and booking details please visit https://www.cambridgewheelbuilding.co.uk/
* dependent on demand.
Created by Steven Moseley // 1 thread
Erection 3No. Commercial Units (Class E) and car parking.
Created by Steven Moseley // 1 thread
An application to determine if prior approval is required for a proposed: Change of Use of Agricultural Buildings to Dwellinghouses (Class C3), and for building operations reasonably necessary for the conversion.
Created by Steven Moseley // 1 thread
Change of Use from an existing Guest House to a House of Multiple Occupancy (HMO)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Application reference & documents: 21/04952/FUL
Erection of new 2nd floor to provide two new dwelling units with balconies.
208 - 208A Cherry Hinton Road Cambridge CB1 7AW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from residential (C3) to 6bed HMO for 6 persons (sui generis).
5 Britten Place Cambridge CB1 3TS
Cambridge
Application reference : 21/04935/FUL
Response to planning application for Lodge Lane business park expansion
https://www.ensembling.com/269152
Created by Jean Dollimore // 1 thread
A set of temporary measures was implemented in September 2020 with a view to reducing through traffic in Arlington Road and the surrounding streets. Further measures were added later to make the scheme more effective.
Camden reports the following changes in the local area:
- a 15% increase in cycle volumes
- 43% decrease in motor traffic
- 15% decrease in traffic-related collisions
Camden is consulting on making all of these measures permanent with the following enhancements:
Jamestown Road: restriction on eastbound motor vehicles. Replace the planter with a traffic island
Inverness Street: no access for motor vehicles to Arlington Road. Replace the planters with traffic islands and widen the footway outside Cavendish School. NOTE: At our meeting on Monday’ 15th Nov, it was suggested we should ask for a School Street for Cavendish School.
Buck Street: no way in and out for motor vehicles from Kentish Town Road
Arlington Road (south of junction of Delancey Street): restriction on northbound motor vehicles. Add a traffic island and greening, raise carriageway.
Mornington Street: no way in and out for motor vehicles at the junction with Albert Street
Albert Street: no way in and out for motor vehicles at the junction with Mornington Place. Replace planters with removable bollards
Mornington Place: no way in and out for motor vehicles at the junction with Clarkson Row/Mornington Terrace. Replace planters with removable bollards. New tree and planting on Mornington Street. New Sustainable Urban Drainage System (SUDS) on Clarkson Row
New junction designs and other changes
Delancey Street @ Albert Street - remove the right turn lane (from Albert Street) and build out the footway. NOTE: the original Delancey-Pratt scheme indicated the entry to a new contraflow cycle here. We should aim to keep that.
Delancey Street @Arlington Road Raise the junction.
Parkway Cycle Hire Station: move to the southern corner of Albert Street.
Parkway junction with Arlington Road: lengthen the feeder lane on Parkway. NOTE (as suggested at our meeting on 15th) this cycle lane should extend over the space occupied by the cycle hire station.
Parkway junction with Albert Street: double yellow lines
Parkway junction with Arlington Road: widen eastern footway to north of junction and remove two parking spaces.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing garage and erection of two 3-bed semi-detached houses on 2.5 floors with car and cycle parking and bin storage on land adjacent No 1 Greville Road, Cambridge
Land Adj 1 Greville Road Cambridge Cambridgeshire CB1 3QJ
Cambridge
Application reference : 21/04756/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of existing house to form 2 studio flats.
84 Ramsden Square Cambridge CB4 2BL
Cambridge
Application reference : 21/04865/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no. dwellings following demolition of existing bungalow
200 Perne Road Cambridge CB1 3NX
Cambridge
Application reference : 21/04797/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04769/FUL | Two storey side extension to create a one bedroom, a two bedroom dwelling and a detached two bedroom dwelling in the garden. | 3 Forest Road Cambridge Cambridgeshire CB1 9JA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Convert and extend existing garage to rear to provide 1no. 1bed studio dwelling.Proposed dwelling with have its own parking bay and rear garden while maintaining a rear garden for the existing dwelling (No.11) with roadside parking to the front of the existing dwelling. proposed dwelling to meet minimum standards. neighbouring approved scheme on same build line No. 1 Latimer Close.
11 Peverel Close Cambridge CB5 8RW
Cambridge
Application reference : 21/04757/OUT
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor and single storey rear extensions of existing bungalow to create 3no. flats.
538 Newmarket Road Cambridge CB5 8LL
Cambridge
Application reference : 21/04852/FUL
Created by Jean Dollimore // 1 thread
Following a fatality at this junction in August Camden Council installed a number of temporary changes to the junction in October.
This consultation concerns some more radical permanent changes
The proposals include:
Created by Steven Moseley // 1 thread
Construction of three 4-bedroom detached houses, each with an integralgarage, plus individual private driveways connecting to Marlowe Way. Retention of two TPO trees.
The busway path is currently closed south of Cambridge station - with a lorry parked on the cyclepath, a set of barriers right across the path and the bus tracks, and the driver standing there to obstruct traffic.
I
Created by Steven Moseley // 1 thread
Outline planning application with all matters reserved save for access for the demolition of all existing buildings and structures and the creation of a residential development with associated open space and infrastructure.
Created by Steven Moseley // 1 thread
Proposed 4 bedroom dwelling and garage/store
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no flats with associated works and landscaping on unused land behind The Seven Stars Public House
The Seven Stars Public House 249 Newmarket Road Cambridge CB5 8JE
Cambridge
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Marcus Howarth // 1 thread
see https://consultations.tfl.gov.uk/trams/sutton-link/?cid=sutton-link
Here's the overview from TFL:
Overview
We are consulting on proposals for a new, direct and quicker transport link between Sutton and Merton. We have called this the Sutton Link.
The Sutton Link would create a high-capacity route for people travelling between Sutton town centre and Merton using zero-emission vehicles. It would connect with other major transport services into central London and across south London, including National Rail, London Underground, existing tram and bus services. It would make journeys by public transport quicker and more attractive, and reduce the need for trips by private car.
Many of the neighbourhoods along the proposed routes have limited public transport options. The Sutton Link would support new homes being built and would improve access to jobs, services, major transport hubs and leisure opportunities across both boroughs and beyond.
Our work is at a stage where we would like to know your views about three potential routes. We are considering a tram or ‘bus rapid transit’ (BRT) for the Sutton Link and would also like to know your views on this.
BRT is similar to a tram but runs on road segregated from traffic where possible, not on rails, and carries fewer people in each vehicle. A full explanation is included below in the section titled ‘About trams and bus rapid transit’.
From LCC -
general principles would be ensure this doesn’t negatively impact cycle routes, that there are good routes to the stations/stops, that any places where cyclists will be crossing tracks are designed carefully with latest materials to avoid tramlining incidents, that the space comes from private car lanes.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Sam Saunders // 0 threads
A twenty metre stretch of advisory cycle lane at the end of Whiteladies Road, from a zebra crossing to its junction with Queens Road, encourages cyclists to take a position near to the curb as they enter the and leave the junction. This puts them exposed to frequent buses turning immediately left into Queens Avenue and in a vulnerable position from which to continue a journey south west towards Park Street or Park Row.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Jean Dollimore // 1 thread
Fleet Road is a one-way street with heavy motor traffic and no protected cycle infrastructure. This means that people cycling through the area face unpleasant interactions with motor vehicles as well as needing to make diversions to reach destinations in the area,
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Residents of Beaumont Square and the surrounding area raised concerns about rat-running and the problems it causes in local streets. You may remember that the Council previously consulted residents on traffic management proposals to reduce traffic speed in the area; many of which were strongly supported and have now been implemented. A number of additional ideas were also put forward by residents which have now been considered and we would appreciate your opinion on whether they should be introduced.
One of the problems is the level of traffic trying to avoid the traffic lights at the A11 Mile End Road/White Horse Lane junction. Drivers cut through either Beaumont Square or Eastbury Terrace through to Beaumont Grove to join A11 Mile End Road junction causing safety concerns, particularly for the nursery and nuisance to local properties. In addition, Beaumont Grove suffers problems relating to parking for surrounding shops and takeaways.
Created by TMiles // 0 threads
A shared-used area runs parallel to Park End Street across Frideswide Square, fronting the Saïd Business School. This offers an alternative approach to the station, and allows cyclists approaching from the city centre to avoid manoeuvres across two roundabouts.
There is however a lack of a properly aligned, clearly marked refuge between the two streams of traffic on Hythe Bridge Street at the point where cyclists would seek to cross into this shared space.
Created by David Butler // 1 thread
Manchester City Council Development strategy for the Ancoats and New Islington Areas. Includes development and urban design principles, and will be a "material consideration" in determinng planning applications.
A recent announcement about the funding of 6000 new residential units by ADUG in this part of Manchester increases the need to ensure that cycling is given due prominence in this strategy.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Shaun McDonald // 1 thread
The A92 here has some very fast traffic. Considering this is the flagship National Cycle Route 1, and there is already a cycle path of part of the way between these 2 junctions. It would be much better if this cycle path was continued to the next junction, with some crossing aid in the form of traffic lights, bridge or tunnel. This would open this part of the route to a wider range of participants, as it would be significantly safer.
20 mph speed limit for Newport area, enclosed by the river Taw, The Square, Belle Meadow Road, Inner Relief Road, Hollowtree Road, South Street and Park Lane.